background image

× 

12

M8

×

60

Ø 8 mm

17/20

CHRISTINA 28

97

%

DRILL THROUGH THE

 WALL, 

HOLE 

MUST

 

BE AT THE BOTTOM OF THE OVAL, 

ATTACH WITH BOLT.

4CM

20CM

WINDBOARD

Содержание CHRISTINA 28

Страница 1: ...25 12 400 80 30 5 70 4 50 6 140 1 4X40 M8 60 3 mm 4 mm 5 mm 8 mm 1 20 CHRISTINA 28 PREPARE THE GROUND UNWRAP THE PACKAGE LAY OUT THE COMPONENTS FIND THE TOOLS...

Страница 2: ...28 MAKE SURE THAT THE FOUNDATION IS INSTALLED ON A LEVEL SURFACE CHECKING ALL DIRECTIONS INCLUDING CORNER TO CORNER 3 LAY OUT THE FOUNDATION BEAMS AND SQUARE IT BY MEASURING FROM CORNER TO CORNER IFB...

Страница 3: ...20 CHRISTINA 28 LAY OUT THE BOTTOM LOGS ATTACH TO THE FOUNDATION THE WALL LOGS WILL HANG OVER THE FOUNDATION BEAMS BY APPROXIMATELY 5MM THIS OVERHANG IS DESIGNED AS A RAIN DRIP 5 2 BL 1 6 140 1 BL 2 1...

Страница 4: ...4 5 70 4 mm 6 6 140 5 mm 4 20 CHRISTINA 28 7 ATTACH THE FIRST ROW OF WALL LOGS INTO THE BOTTOM LOGS WITH SCREWS 2 LG 1 1 LG 3 1 LG 2 6 140 5 70...

Страница 5: ...5 20 CHRISTINA 28 12 AFTER PLACING 3 4 ROWS OF WALL LOGS TAP EACH WALL LOG IN PLACE USING A HAMMER AND THE HITBLOCK PROVIDED TO TIGHTEN THE LOGS HITBLOCK...

Страница 6: ...6 20 CHRISTINA 28 13 SLIDE THE DOOR IN ATTACH THE HANDLE BDD4 3 LOGS IN PLACE...

Страница 7: ...7 20 CHRISTINA 28 26 DON T FORGET TO TIGHTEN THE LOGS AFTER EVERY 3 4 ROWS...

Страница 8: ...8 20 CHRISTINA 28 SLIDE THE WINDOW IN ATTACH THE HANDLE 28 BW2 1 LG 2 1 LG 1...

Страница 9: ...6 6 140 5 mm 9 20 CHRISTINA 28 42 INSTALL THE GABLES WITH LONG SCREWS TO THE WALL LOGS ON THE FRONT AND REAR WALLS 18 LOGS IN PLACE 2 TL 1 A LG 1 B LG 2 B LG 1 A LG 2 1 TL 1...

Страница 10: ...20 6 140 4 mm 10 20 CHRISTINA 28 43 INSTALL THE ROOF PURLINS AND ROOF ELEMENTS 1 ATTACH THEM WITH SCREWS RFB RE1...

Страница 11: ...32 6 140 5 mm 11 20 CHRISTINA 28 SCREW RS1 AND RS2 TO PURLINS AND ROOF ELEMENTS 46 RS1 RS2...

Страница 12: ...12 4 50 4 mm 12 20 CHRISTINA 28 USE SCREWS TO CONNECT ROOF SIDES 47...

Страница 13: ...13 20 CHRISTINA 28 SAW ROOFBOARDS SO THAT IT IS POSSIBLE TO ATTACH THEM AGAINST ROOF SIDES AT THE BACK OF THE HOUSE WILL BE A GAP BETWEEN THE ROOFSIDE AND THE ROOFBOARD 79 RB...

Страница 14: ...172 4 50 14 20 CHRISTINA 28 84 PLACE THE FIRST ROOFBOARD FLUSH WITH THE END OF THE PURLINS AND ATTACH WITH 8 SCREWS 4 INTO EACH NEXT RB...

Страница 15: ...180 4 50 15 20 CHRISTINA 28 89 10 SCREWS INTO THE FIRST FLOORBOARD 5 INTO EACH NEXT SAW THE LAST BOARD TO MAKE IT FIT FB...

Страница 16: ...30 1 4x40 16 20 CHRISTINA 28 96 SAW THE BASEBOARDS AND ATTACH WITH NAILS AT EVERY 0 5 METERS BB...

Страница 17: ...12 M8 60 8 mm 17 20 CHRISTINA 28 97 DRILL THROUGH THE WALL HOLE MUST BE AT THE BOTTOM OF THE OVAL ATTACH WITH BOLT 4CM 20CM WINDBOARD...

Страница 18: ...90 90 18 20 CHRISTINA 28 98 IF DOOR IS TILTED PUSH THE DOOR FRAME SO THAT ALL CORNERS ARE 90...

Страница 19: ...19 20 CHRISTINA 28 99 IF DOORS ARE IN DIFFERENT HEIGHTS OR THERE IS A GAP BETWEEN THEM ADJUST 3 SCREWS ON DOOR HINGES...

Страница 20: ...20 20 CHRISTINA 28 WHEN THE HOUSE IS ASSEMBLED YOU SHOULD COVER THE TIMBER WITH WOOD PROTECTIVE SEAL PAINT OR STAIN AS SOON AS POSSIBLE TO AVOID DETERIORATION TO THE WOOD 100...

Отзывы: