background image

× 

3

5

×

70

Ø 4 mm

× 

4

6

×

140

Ø 5 mm

6/24

ARBOGA I 40

7

%

ATTACH THE NEXT ROW OF 

WALL LOGS

 INTO THE BOTTOM 

LOGS WITH 

SCREWS

.

6

×

140

5

×

70

A LG-1

B LG-3

Содержание 4100001

Страница 1: ...50 15 470 50 30 5 70 4 50 6 140 1 4X40 M8 70 3 mm 4 mm 5 mm 8 mm 130 4 40 1 24 ARBOGA I 40 PREPARE THE GROUND UNWRAP THE PACKAGE LAY OUT THE COMPONENTS FIND THE TOOLS...

Страница 2: ...E THAT THE FOUNDATION IS INSTALLED ON A LEVEL SURFACE CHECKING ALL DIRECTIONS INCLUDING CORNER TO CORNER 3 LAY OUT THE FOUNDATION BEAMS AND SQUARE IT BY MEASURING FROM CORNER TO CORNER IFB1 A C D B AB...

Страница 3: ...2 8 5 70 6 140 4 mm 5 mm 3 24 ARBOGA I 40 ATTACH FOUNDATION BEAMS WITH SCREWS 4 6 140 5 70...

Страница 4: ...4 24 ARBOGA I 40 LAY OUT THE BOTTOM LOGS SO THAT DOOR OPENING WILL BE 1441 MM WIDE 5 2 LG 1 1 LG 5 A BL 1 B BL 1 1441 mm...

Страница 5: ...4 10 5 70 6 140 4 mm 5 mm 5 24 ARBOGA I 40 ATTACH LOGS TO THE FOUNDATION THE WALL LOGS WILL HANG OVER THE FOUNDATION BEAMS BY APPROXIMATELY 5MM THIS OVERHANG IS DESIGNED AS A RAIN DRIP 6 6 140 5 70 5m...

Страница 6: ...3 5 70 4 mm 4 6 140 5 mm 6 24 ARBOGA I 40 7 ATTACH THE NEXT ROW OF WALL LOGS INTO THE BOTTOM LOGS WITH SCREWS 6 140 5 70 A LG 1 B LG 3...

Страница 7: ...7 24 ARBOGA I 40 9 AFTER PLACING 3 4 ROWS OF WALL LOGS TAP EACH WALL LOG IN PLACE USING A HAMMER AND THE HITBLOCK PROVIDED TO TIGHTEN THE LOGS HITBLOCK...

Страница 8: ...8 24 ARBOGA I 40 10 SLIDE THE DOOR IN ATTACH THE HANDLE CDD4 3 LOGS IN PLACE...

Страница 9: ...9 24 ARBOGA I 40 22 DON T FORGET TO TIGHTEN THE LOGS AFTER EVERY 3 4 ROWS HITBLOCK 1 LG 6 1 LG 2 1 LG 1 B LG 2 B LG 1...

Страница 10: ...10 24 ARBOGA I 40 SLIDE THE WINDOW IN ATTACH THE HANDLE 23 CW2L CW2R...

Страница 11: ...11 24 ARBOGA I 40 46 2 LG 2 B LG 5 16 LOGS AND 1 HALF LOG IN PLACE B LG 4 1 LG 4 1 LG 7 1 LG 3...

Страница 12: ...I 40 INSTALL CEILING TRIANGLE AND ATTACH WITH SCREWS INTO THE WALLS LEAVE 4CM CAP BETWEEN DOOR AND CEILING DETAIL ATTACH IT INTO WALLS AND INTO CEILING TRIANGLE USING SCREWS 47 CEILING DETAIL 40 120...

Страница 13: ...24 6 140 5 mm 13 24 ARBOGA I 40 52 ATTACH TOP LOGS INTO WALL LOGS WITH SCREWS B TL 2 2 TL 3 2 TL 1 2 TL 2 A TL 3 A TL 1 A TL 2 A TL 4 1 TL 3 1 TL 1 1 TL 2 B TL 1 B TL 3 B TL 4...

Страница 14: ...53 CONNECT THE ROOF PURLINS RFR WITH RD BEFORE INSTALLING THEM ON TOP OF THE CORNERS RD RFR 14 24 ARBOGA I 40...

Страница 15: ...55 INSTALL THE ROOF PURLINS AND ATTACH THEM WITH SCREWS 4 6 140 5 mm 15 24 ARBOGA I 40...

Страница 16: ...8 5 70 4 mm 8 6 140 5 mm 16 24 ARBOGA I 40 58 INSTALL THE ROOF PURLINS RFB AND ATTACH THEM WITH SCREWS RFB2 RFB1 5 70 6 140...

Страница 17: ...256 4 50 17 24 ARBOGA I 40 62 PLACE THE FIRST ROOFBOARD FLUSH WITH THE END OF THE PURLINS AND ATTACH WITH SCREWS RB16...

Страница 18: ...ROOF TOP 32 4 40 18 24 ARBOGA I 40 86 INSTALL THE ROOF TOP AND ATTACH IT WITH SCREWS ATTACH FASCIA TRIMS INTO ROOFPURLINS RF...

Страница 19: ...19 24 ARBOGA I 40 87 SCREW THE FLOORBOARDS INTO FOUNDATION SAW THE LAST BOARD TO MAKE IT FIT FB...

Страница 20: ...20 24 ARBOGA I 40 96 SAW THE BASEBOARDS AND ATTACH WITH NAILS AT EVERY 0 5 METERS 30 1 4x40...

Страница 21: ...4CM 20CM 15 M8 70 8 mm 21 24 ARBOGA I 40 DRILL THROUGH THE WALL HOLE MUST BE AT THE BOTTOM OF THE OVAL ATTACH WITH BOLT 97 WINDBOARD...

Страница 22: ...90 90 22 24 ARBOGA I 40 IF DOOR IS TILTED PUSH THE DOOR FRAME SO THAT ALL CORNERS ARE 90 98...

Страница 23: ...23 24 ARBOGA I 40 99 IF DOORS ARE IN DIFFERENT HEIGHTS OR THERE IS A GAP BETWEEN THEM ADJUST 3 SCREWS ON DOOR HINGES...

Страница 24: ...24 24 ARBOGA I 40 WHEN THE HOUSE IS ASSEMBLED YOU SHOULD COVER THE TIMBER WITH WOOD PROTECTIVE SEAL PAINT OR STAIN AS SOON AS POSSIBLE TO AVOID DETERIORATION TO THE WOOD 100...

Отзывы: