30
Annual Inspection
EN
8.5
Pressure Measuring Test
The test set-up is depicted in Figure 8-2, Set-up of pressure measuring test.
The pressure test checks the pressure chamber, pressure sensor, and accurate
measurement of pressure to ensure all elements are functioning properly. This
test requires an inflow tube set and a canister filled with
water
. The height of the
water column (hydrostatic pressure) is used to test the pressure transducer.
1. Place the inflow tube end with the bag spikes into a canister filled with water.
2. Fill the end of the tube set completely with water by starting the pump using
the
Prime
button. Let the pump run until the calibration sequence is completed.
Press the
Pause/Resume
button to stop the roller wheel. The Intrauterine Pres-
sure display displays 0 mmHg.
3. Close the hysteroscope end of the tube (use finger on luer connector tip).
4. Hold the water level of the end of the hysteroscope tube (h) 12 in [30 cm]
above the pressure chamber. The water column provides a hydrostatic pres-
sure load onto the pressure transducer.
5. Release the finger covering the luer connector end of the hysteroscope tube.
6. The intrauterine pressure display should be 20 mmHg (±5 mmHg).
7. Change the water column height. The value of the intrauterine pressure dis-
play should change accordingly.
Record results in the test log in Section 15.1. Test is successful if results fall within
acceptable tolerance limits.
Figure 8-2 Set-up of pressure measuring
test
h
Height of the water line
Содержание AQL-100
Страница 6: ......
Страница 50: ...46 Appendix EN 15 Appendix 15 1 Test Log Date Tests Performed Results Comment Signature ...
Страница 52: ......
Страница 54: ......
Страница 100: ...48 Anhang DE 15 Anhang 15 1 Testprotokoll Datum Durchgeführte Tests Ergebnis Bemerkung Unterschrift ...
Страница 102: ......
Страница 104: ......
Страница 150: ...48 Annexe FR 15 Annexe 15 1 Procès verbal de tests Date Tests réalisés Résultat Remarque Signature ...
Страница 152: ......
Страница 154: ......
Страница 200: ...48 Apéndice ES 15 Apéndice 15 1 Registro de test Fecha Test realizados Resultado Anotaciones Firma ...
Страница 202: ......
Страница 204: ......
Страница 250: ...48 Appendice IT 15 Appendice 15 1 Protocollo di verifica Data Test eseguiti Risultato Nota Firma ...
Страница 252: ......
Страница 254: ......
Страница 300: ...48 Bijlage NL 15 Bijlage 15 1 Testprotocol Datum Uitgevoerde tests Resultaat Opmerking Handtekening ...
Страница 302: ......