![Holman 4A80L Скачать руководство пользователя страница 10](http://html1.mh-extra.com/html/holman/4a80l/4a80l_installation-manual_2145695010.webp)
Instructions – 4A80L
For Technical Support Call: 800-343-7486 Monday-Friday 7AM - 4 PM (PST)
Page 9
DO NOT EXCEED MANUFACTURERS WEIGHT CAPACITY FOR ROOF
Metris Rail Installation
•
Locate 6 mount locations on van roof, 4
rear and 2 mid-roof, as shown.
•
Remove plastic cap in these locations
indicated to expose threads in the roof.
•
Place the rail on the roof so the holes
align with the threaded holes in roof
and with approximately 5” between the rear of the rail and the rear door opening. In most installs, the rail
upright flange is to the outside of the van.
•
Insert rubber washer between the mounting rail and the roof to ensure sealing.
•
Apply sealant on and around threaded holes and bolt threads to seal roof. (Passenger side shown)
•
Install mounting rail as shown using M6 x 22mm bolts, 1/4” lock washers, and 1/4” flat washers on the
outside. Be sure to apply sealant around bolts as you fasten them.
FRONT EXPLODED
REAR EXPLODED
REAR TIGHTENED
FRONT TIGHTENED