Installation and commissioning of the machine
Hohner Maschinenbau GmbH
EXACT-PLUS
10/2010
23
3.6
Mounting and adjustment - guiding brushes / guiding angle
- Fig. 3.4 -
To insert brochures under stitching heads use guiding brushes -20- and guiding angle-21-.
They are destined to stop every brochure at the same position and to ensure that projecting sheets
are made flush.
The guiding angle -21- effects that sheets or brochures not will be jammed during feeding into the
stitching unit.
Installation and adjustment has to be effected when stitching head covering is open. The machine
can not be operated at the same time (see 2.1.2).
3.7
Mounting - centering device and guiding cam
See stitching head operating instructions.
Содержание EXACT-PLUS
Страница 2: ...2 EXACT PLUS 10 2010 Hohner Maschinenbau GmbH ...
Страница 12: ...Description of the stitching machine EXACT PLUS 12 EXACT PLUS 10 2010 Hohner Maschinenbau GmbH Fig 2 4 1 ...
Страница 14: ...Description of the stitching machine EXACT PLUS 14 EXACT PLUS 10 2010 Hohner Maschinenbau GmbH ...
Страница 22: ...Installation and commissioning of the machine 22 EXACT PLUS 10 2010 Hohner Maschinenbau GmbH Fig 3 4 20 21 ...
Страница 30: ...Installation and commissioning of the machine 30 EXACT PLUS 10 2010 Hohner Maschinenbau GmbH Fig 3 9 51 52 53 ...
Страница 32: ...Installation and commissioning of the machine 32 EXACT PLUS 10 2010 Hohner Maschinenbau GmbH Fig 3 10 54 43 55 ...
Страница 34: ...Installation and commissioning of the machine 34 EXACT PLUS 10 2010 Hohner Maschinenbau GmbH Fig 3 11 3 4 3 4 ...