Hoffmann Garant Скачать руководство пользователя страница 10

The pull­out shelves are cantilevered, base­supported and equipped with an anti­
tilt device (only 1 frame can be pulled out at a time). The drawers can be controlled 
using software to be ejected individually.

1.  Installing an upright cabinet

1.1. 

Tools and aids required

 

„

Stepladder

 

„

Hexagon socket, size 3 mm with extension and small ratchet

 

„

Hexagon L­wrench, size 4 mm

1.2. 

Precondition

 

„

All drawers are empty.

1.3. 

Requirements of the installation location

 

„

   Upright cabinets place increased demands on the subsurface in  
particular, since the drawers run directly on the floor!

 

„

Flatness tolerance for finished floors as per DIN 18202.

 

„

Angularity of a maximum of two millimetres over the measurement 
length of one metre.

 

„

Only place on ground that is absolutely level.

 

„

The subsurface must have a sufficient load­bearing capacity.

DE

EN

10

Содержание Garant

Страница 1: ...DE EN Bedienungsanleitung User manual GARANT Vertikalschrank 979100 GARNAT Upright cabinet...

Страница 2: ...DE EN 2...

Страница 3: ...oup com DE EN Inhalt 1 Vertikalschrank aufstellen 4 1 1 Ben tigtes Werkzeug und Hilfsmittel 4 1 2 Voraussetzung 4 1 3 Anforderungen an den Aufstellort 4 1 4 Ablauf 5 2 Notentriegelung 7 3 Sicherung ge...

Страница 4: ...steckschl ssel Gr e 3 mm mit Verl ngerung und kleiner Knarre Innensechskanntschl ssel Gr e 4 mm 1 2 Voraussetzung Alle Schubladen sind leer 1 3 Anforderungen an den Aufstellort Speziell Vertikalschr n...

Страница 5: ...dieSchr nke elektrischinBetriebzunehmenundindieSoftwareeinzubinden Nun kann die Funktion gepr ft werden Zur Funktionspr fung des Auswurfs ist die Montage einer Schublade nicht notwendig Zur Inbetrieb...

Страница 6: ...Die Funktion des Schranks ist nun gegeben Notentriegelung verschlossen Standard Betriebsposition Notentriegelung ge ffnet DE EN 6...

Страница 7: ...Der Schrank muss zwingend gegen Kippen gesichert werden Die Verankerung am Boden gew hrleistet einen sicheren und festen Stand des Werkzeugschrankes Bei Wandbefestigung z B Wandh ngeschrank pr fen Sie...

Страница 8: ...DE EN 8...

Страница 9: ...DE EN Content 1 Installing an upright cabinet 10 1 1 Tools and aids required 10 1 2 Precondition 10 1 3 Requirements of the installation location 10 1 4 Procedure 11 2 Emergency release 13 3 Securing...

Страница 10: ...ension and small ratchet Hexagon L wrench size 4 mm 1 2 Precondition All drawers are empty 1 3 Requirements of the installation location Upright cabinets place increased demands on the subsurface in p...

Страница 11: ...that the cabinets are commissioned electrically and are integrated with the software Its function can now be checked it is not necessary to mount a drawer in order to check the ejection is functionin...

Страница 12: ...The cabinet is now functional Notentriegelung verschlossen Standard Betriebsposition Notentriegelung ge ffnet DE EN 12...

Страница 13: ...oring it to the floor ensures that the tool cabinet is secure and stable If the cabinet is attached to the wall e g wall hung cabinet please check the load bearing capacity of the wall structure Speci...

Страница 14: ...DE EN 14...

Страница 15: ...www hoffmann group com DE EN 15...

Страница 16: ...05999 in Copyright Hoffmann Group Hoffmann GmbH Qualit tswerkzeuge Haberlandstr 55 81241 Munich Germany www hoffmann group com...

Отзывы: