Hoeptner Freeze Flow Скачать руководство пользователя страница 1

BURY DEPTH

FROST LINE

1” FIP

INLET

40” OPEN

31” CLOSED

14”

Figure  1.

1. It is most important to Flush supply lines before installing 

hydrant.  Failure to do so may permanently damage sealing surface 

causing leaks and possible freeze-ups.

2. Install hydrant so that the Adapter or Bushing is above grade for 

servicing.  Figure 1.

3. Attach hydrant to supply lines using Teflon Tape or an approved 

thread sealant for PVC.

4. Do not over tighten PVC portion of hydrant to supply lines as it 

will damage hydrant.

Installation

1.   No winterization is required to prevent hydrant from freezing.

2.   Lift up on lever to turn on, push down on lever to turn off.

3.   As hydrant is turned on some water will come out port holes

      in vacuum breaker, this is normal.

4.   When the hydrant is shut off it will drain to the reservoir to

      prevent freezing, even if a hose with pistol grip nozzle is attached. 

     However, the hose will not drain.   

5.   DO NOT remove, discard, or bypass Backflow Preventer as

      Hydrant will not function properly. 

Operation

See Maintence: “Field Testing the Backflow Preventer” for further 

information on the Backflow Preventer.

Executive Sanitary Yard Hydrant

Installation and Operating Instructions

Hoeptner Products

HOEPTNER  PRODUCTS

7796 Oak Spring Circle, Gilroy, CA 95020 * Ph 408-847-7615 / Fax 408-847-0675 

[email protected] * www.freezeflow.com

Содержание Freeze Flow

Страница 1: ...nt from freezing 2 Lift up on lever to turn on push down on lever to turn off 3 As hydrant is turned on some water will come out port holes in vacuum breaker this is normal 4 When the hydrant is shut off it will drain to the reservoir to prevent freezing even if a hose with pistol grip nozzle is attached However the hose will not drain 5 DO NOT remove discard or bypass Backflow Preventer as Hydran...

Страница 2: ...eds repair it will be necessary to unscrew Bushing and lift entire mechanism out of the Cylinder Follow the steps below being careful not to damage the plastic piston No adjustment is necessary providing locking collar at base of head has not been moved Proper location of locking collar is when the top of collar is in line with shoulder step in 1 galvanized riser pipe Do not over tighten Bushing a...

Страница 3: ...OLT BOLT UPPER LINK HEAD ASSEMBLY LINK BACKFLOW PREVENTER PIPE I DRY BOLT LOWER LINK CLAMP PIPE 1 2 WET BUSHING PISTON ASSEMBLY CYLINDER ASSEMBLY SEAL SEAL SEAL 2157 0030 2 END CAP Executive Sanitary Yard Hydrant Parts Hoeptner Products HOEPTNER PRODUCTS 7796 Oak Spring Circle Gilroy CA 95020 Ph 408 847 7615 Fax 408 847 0675 work garlic com www freezeflow com ...

Страница 4: ... labor charges delays vandalism negligence fouling caused by foreign material damage from adverse water conditions chemicals or any other circumstances over which Hoeptner Perfected Products has no control This warranty shall be invalidated by any abuse misuse misapplication or improper installation of the product Hoeptner Perfected Products makes no other warranties express or implied of any kind...

Отзывы: