background image

HODEDAH 

®

www.Hodedah.com

Assembly Of Drawers

2

Screw M3.5 x 14mm

18 Pcs.

3

Screw M4 x 32mm

15 Pcs.

8

Handle

3 Pcs.

8

Screw M4 X 18mm

6 Pcs.

x3

(1)

(3)

(2)

11

Nail

24 Pcs.

A.

 Place panel 

T

 and 

on each side of panel

P,Q 

&

 R 

with Panel 

T

 and 

U

 

's PVC

dowel insert to panel

P,Q 

&

 R

 

's non-thru hole and Panel 

P,Q

&

 R

 

's mini fix screws insert into Panel 

T

 and

U

 

's thru as shown.

Then tighten mini fix on panel 

T

 and 

U

clockwise to lock mini fix up.

-Next tighten screw 

 to panel 

T

 and 

U

 

's

upper thru holes to fix up to the panel 

V

.

B.

 Flip drawer with bottom side up, place panel 

W

 onto

the drawer and align properly. Then nail the nails

provided with hammer on the border of panel 

W

 as

shown.The gap between 2 nails is about 100mm.
-After that, place a drawer slide B 

 with the small

white roller facing outward and with other end tip

touching panel 

P

Q

 & 

R

 onto each bottom side (angle)

edge

of panel 

T

 and 

U

. Then tighten 3 screws 

 on each

drawer slide B 

 (as shown).

-Put drawer supporting 

X

 onto middle of panel 

W

 and

inserting drawer supporting 

X

 's dowels onto non-thru

holes at Panel 

P

Q

 & 

R

 , then tighten screw 

 to drawer

supporting 

X

 's thru hole to fix it onto panel 

W

 and

panel 

V

.

C.

 Flip the drawer over.

-Tighten 2 screw 

 from inner side of panel H into

the handle 

 holes.

Содержание HIBT70-G

Страница 1: ...y information please read and keep for future reference HODEDAH ITEM HIBT70 G SINGLE BED 2 people 120 mins 1 YR LTD 2 Boxs www Hodedah com 1 Page Product Dimensions Height 39 17 x Width 42 32 x Depth...

Страница 2: ...ollowing original bill of sale date of purchase where the product was purchased and images if applicable Components replaced warranted through the remainder of the original warranty only The defective...

Страница 3: ...furniture it will strip and damage parts Your package should include the following hardware and parts Parts are labeled or stamped on the raw edge Please inspect contents to ensure you have received...

Страница 4: ...TY 9 QTY Nail QTY Allen Key 16 Pcs 14 QTY QTY 4 58 Pcs 12 Pcs Screw M6 x 40mm Screw M3 5 x 14mm For 13 Drawer Slides Screw M4 x 32mm 18 Sets Screw M6 2 x 9mm For 12 Drawer Slides Pvc Cap 19 Sets Pvc C...

Страница 5: ...n Side Panels Fix On Side Panels Fix On Drawer Side Panels Fix On Drawer Side Panels Important 1 Before you throw the package please use the Check Box to identify the parts and hardware to ensure that...

Страница 6: ...9 x 600 x 15mm Stand Panel Side Rail 488 x 297 x 15mm Headboard Back Panel 1066 x 387 x 3mm Front Back Strengthering Panel Headboard 1039 x 64 x 15mm Headboard Left Side Panel 975 x 238 x 15mm Left Si...

Страница 7: ...s Panels 988 x 475 x 15mm Center Support 487 x 100 x 15mm Right Drawer Panel 629 x 190 x 15mm Foot Board Panel 1050 x 395 x 15mm Left Drawer Panel 629 x 190 x 15mm V QTY Drawer End Panels 569 x 138 x...

Страница 8: ...HODEDAH www Hodedah com 8 Page The Breakdown x3...

Страница 9: ...sert the mini fix nuts with the cross arrow mark facing upward and aim to panel A E P Q R T U X s top thru holes As shown Refer page 10 Nail Protection Nail provided with hammer onto the bottom edge o...

Страница 10: ...PANEL L PANEL I PANEL J HODEDAH www Hodedah com 10 Page Pre Assembly 10 Nail Leg 6 Pcs 1 Pvc Dowel 30 Pcs PANEL M PANEL R PANEL Q PANEL P PANEL T x3 PANEL U x3 PANEL X x3 9 Mini Fix 12 Pcs 9 Mini Fix...

Страница 11: ...ah com Pre Assembly PANEL K x2 PANEL O PANEL H 10 Nail Leg 6 Pcs 1 Pvc Dowel 6 Pcs 11 Page 5 Screw M6 2 x 9mm 12 Pcs Place the drawer slide A onto the 2 holes area shown at panel H Kand O Then tighten...

Страница 12: ...p drawer with bottom side up place panel Wonto the drawer and align properly Then nail the nails provided with hammer on the border of panel Was shown The gap between 2 nails is about 100mm After that...

Страница 13: ...e non thru holes at panel L Use Allen Key to tighten 4 screws from thru holes of panel L to non thru hole of both panel K as shown Fix panel M to panel L and N by inserting the dowels onto the respect...

Страница 14: ...o tighten 4 screws from thru holes of panel Iand Jto non thru hole of both panel Kas shown Insert 6 barrel nuts to non thru holes at Panel I J L N Fix panel O onto panel I J L N Align properly by inse...

Страница 15: ...hru holes at Panel I J L Nas shown Fix panel Honto panel I J L N Align properly by inserting the dowel of Panel I J L Nonto non thru holes of panel H Pushing light tapping of panel Hto have panel I J...

Страница 16: ...HODEDAH www Hodedah com 16 Page Assembly Of Set A 3 Screw M4 x 32mm 16 Pcs Place 4 panels Sonto the middle of bed Insert screws onto the thru holes at Panel S Step 4...

Страница 17: ...w Hodedah com 17 Page Assembly Of Set A Take drawers and slide them the white rollers at drawer slide at both side of drawers are to go into the track of the slides at each side panel all the way gent...

Страница 18: ...e Allen key to tighten 3 screws from the thru holes of panel A to non thru holes of panel B C Fix panel Eonto panel B C Dby inserting the dowels onto the respective non thru holes at panel E Use Allen...

Страница 19: ...11 Nail 26 Pcs Place panel G onto panel A E F as shown Then align the Panel G properly for nailing Use Hammer to nail Then use hammer to nail the nails one by one and at center of 4 side edges Gap bet...

Страница 20: ...c Cap 16 Pcs 3 Screw M4 x 32mm 8 Pcs Joint the completed set A to set B Insert 8 screws 3 from the inner of set B Cover all the screws s head with the PVC cap provided by pushing the cover s stem onto...

Страница 21: ...HODEDAH www Hodedah com Job Complete 21 Page In the interest of our environment please dispose of all packaging thoughtfully Enjoy Thank you for purchasing from Hodedah...

Отзывы: