OM-249 498 Page 16
5-3. Installing Work Clamp
1
Nut
2
Work Cable From Unit
3
Work Clamp
4
Screw
5
Work Clamp Tabs
Bend tabs around work cable.
6
Insulating Sleeves
Slide one insulating sleeve over
work cable before connecting to
clamp.
Slide insulating sleeves over
handles.
802 456-A
.
Connection hardware must be tightened with proper tools. Do not just
hand tighten hardware. A loose electrical connection will cause poor
weld performance and excessive heating of the work clamp.
Tools Needed:
7/16 in.
7/16 in.
1
2
3
4
5
6
Содержание Handler 210 MVP
Страница 14: ...OM 249 498 Page 10 ...
Страница 32: ...OM 249 498 Page 28 6 2 Weld Parameter Chart 250 015 A ...
Страница 38: ...OM 249 498 Page 34 SECTION 8 ELECTRICAL DIAGRAM Figure 8 1 Circuit Diagram ...
Страница 39: ...OM 249 498 Page 35 249 315 A ...