![background image](http://html.mh-extra.com/html/hobart-welders/ironman-250/ironman-250_owners-manual_2142327017.webp)
OM-192 440 Page 13
2-9.
Installing Gas Supply
802 028-A / Ref. 802 286-E
Tools Needed:
1-1/8, 5/8 in
1
2
3
Argon Gas Or
Mixed Gas
4
5
7
Rear Panel
6
.
DO NOT use Argon/Mixed gas regulator/flowmeter
with CO
2
shielding gas. See Parts List for optional
CO
2
gas regulator/flowmeter.
Obtain gas cylinder and chain to
running gear, wall, or other
stationary support so cylinder
cannot fall and break off valve.
1
Cap
2
Cylinder Valve
Remove cap, stand to side of
valve, and open valve slightly. Gas
flow blows dust and dirt from valve.
Close valve.
3
Cylinder
4
Regulator/Flowmeter
Install so face is vertical.
5
Regulator/Flowmeter Gas
Hose Connection
6
Welding Power Source Gas
Hose Connection
Connect customer supplied gas
hose between regulator/flowmeter
gas hose connection, and fitting on
rear of welding power source.
7
Flow Adjust
Typical flow rate is 20 cfh (cubic
feet per hour). Check wire
manufacturer’s recommended
flow rate.
Содержание IronMan 250
Страница 4: ......
Страница 32: ...OM 192 440 Page 28 Notes ...
Страница 33: ...OM 192 440 Page 29 SECTION 5 ELECTRICAL DIAGRAM 206 590 A Figure 5 1 Circuit Diagram For Welding Power Source ...
Страница 42: ...Notes ...