HMS Networks Anybus-E300-DPV1 Скачать руководство пользователя страница 23

DeviceNet Status (Slot 4, Index 72)

Byte offset

Name

Data Type

Description

0

Last EM read error

UDINT

Table 2. Most recent error code of any Explicit Message read:

MSB

LSB

N/A

additional status code

status code

Cleared after reading.

4

Last EM write error

UDINT

Table 3. Most recent error code of any Explicit Message written:

MSB

LSB

N/A

additional status code

status code

Cleared after reading.

8

I/O status

UDINT

Table 4. Current status of implicit IO connection

MSB

LSB

More data (if Cnct. state is Failed)

Cnct. state

Connection state values:
0 = Offline
1 = Running
2 = First input data received from E300
3 = Timeout
4 = Connection failed (Get connection phase)
5 = Connection failed (IO allocation failed)
6 = Connection failed (Set Inhibit time failed)
7 = Connection failed (Establishing failed)

12

Start-up status

UDINT

Table 5. State of start-up configuration with E300

MSB

LSB

additional status code

status code

Start-up state

Start-up state values:
0 = E300 configuration not started
1 = Writing Vendor ID
2 = Writing ECM ID
3 = Writing ECM Revision
4 = Writing ECM Misc (Physical Rotary Switch)
5 = Reading System Configuration String
6 = Configuration done
If CIP errors appear during a Start-up state, they are shown in the status and additional
status code fields

16

CAN status register

USINT

Table 6. Bit0-Bit2 Last Error Code

Value

Error

0

No Error

1

Stuff Error

2

Form Error

3

ACK Error

4

Bit1 Error

5

Bit0 Error

6

CRC Error

Bit3 = Transmit OK
Bit4 = Receive OK
Bit5 = Error passive

Additional Diagnostic information

Anybus-E300-DPV1 - E300 Communication Module for PROFIBUS

SCM-1202-203 1.1

Page 19 of 28

Содержание Anybus-E300-DPV1

Страница 1: ...Anybus E300 DPV1 E300 Communication Module for PROFIBUS USER MANUAL SCM 1202 203 Version 1 1 Publication date 2022 03 25 ENGLISH...

Страница 2: ...and because of the many variables and requirements associated with any particular implementation HMS Networks cannot assume responsibility or liability for actual use based on the data examples or il...

Страница 3: ...tach E300 Communication Module 7 4 3 Connect to PROFIBUS Network 8 4 4 Connect to Ground 9 4 5 PROFIBUS Address Setting Via Rotary Switches 10 5 Verify Operation 11 5 1 LED Guide 11 6 Maintenance 12 6...

Страница 4: ...This page is intentionally left blank...

Страница 5: ...ventions Lists Numbered lists indicate tasks that should be carried out in sequence 1 First do this 2 Then do this Bulleted lists are used for Tasks that can be carried out in any order Itemized infor...

Страница 6: ...uation that if not avoided could result in minor or moderate injury IMPORTANT Instruction that must be followed to avoid a risk of reduced functionality and or damage to the equipment or to avoid a ne...

Страница 7: ...ical shock disconnect from power source before installing or servicing Follow NFPA 70E requirements Install in suitable enclosure Keep free from contaminants WARNING Installation adjustments putting i...

Страница 8: ...connectors examples Manufacturer Variant Article Siemens 0 6GK1500 0EA02 Siemens 90 6ES7972 0BB12 0XA0 Erni 90 104050 Erni 90 174048 Phoenix Contact 0 SUBCON PLUS PROFIB AX SC 2744380 Phoenix Contact...

Страница 9: ...d to update the CompactCom C40 NP40 Chip firmware Anybus Transport Provider Anybus Firmware Manager II Download the installation files and documentation from www anybus com support 3 5 Third Party Sof...

Страница 10: ...e E300 Relay All three modules are required to make a functional overload relay Position Module A E300 DPV1 B E300 Relay Control Module C E300 Relay Sensing Module Anybus E300 DPV1 E300 Communication...

Страница 11: ...lay Control Module 1 Pull out the locking tab located on the upper left side of the E300 Relay Control Module 2 Attach the E300 Communication Module to the E300 Relay Control Module Attach E300 Commun...

Страница 12: ...Module has one PROFIBUS D SUB connector IMPORTANT If a node is the last on a bus segment use a PROFIBUS connector with built in and activated terminating resistors For more information about PROFIBUS...

Страница 13: ...4 4 Connect to Ground Connect the Green Wire to Functional Earth Ground Connect to Ground Anybus E300 DPV1 E300 Communication Module for PROFIBUS SCM 1202 203 1 1 Page 9 of 28...

Страница 14: ...Host Update Mode NOTE All other rotary switch settings are treated as invalid and result in a red TRIP WARN LED A power cycle is required for the changes to take effect PROFIBUS address setting exampl...

Страница 15: ...ine data exchange Initialized Green flashing Device Ready Ready Mode Online clear Initialized diagnostic event s present Red N A N A Exception error Red 1 flash N A Parameterization error N A Red 2 fl...

Страница 16: ...firmware update for Host Controller 1 Install the Flash Magic tool on your PC 2 Disconnect the E300 DPV1 from power 3 Remove the E300 DPV1 from the E300 Relay Control Module See Attach E300 Communicat...

Страница 17: ...g checkbox 8 Click Start and wait for the firmware update to complete 9 Disconnect the TTL USB cable and close the E300 DPV1 top lid 10 Attach the E300 DPV1 to the E300 Relay Control Module See Attach...

Страница 18: ...mpactCom C40 NP40 Chip 1 Install the Transport Provider on your PC 2 Install the Firmware Manager II on your PC 3 In the Firmware Manager II a Click File Firmware Archive b Locate the firmware update...

Страница 19: ...r connector IMPORTANT Do not connect the TTL USB cable to your computer in this step The E300 DPV1 is powered on when connected to a computer If power is turned on too early in the firmware update pro...

Страница 20: ...r The E300 DPV1 LED indicators flash green and yellow g Enter a Path name for the new path and click Ok IMPORTANT For the new COM port to appear in the Select Transport Provider Path drop down list en...

Страница 21: ...E300 DPV1 top lid 12 Attach the E300 DPV1 to the E300 Relay Control Module See Attach E300 Communication Module page 7 13 Set the E300 DPV1 rotary switches to the desired PROFIBUS address See PROFIBU...

Страница 22: ...well as internal firmware versions are parts of the internal diagnostic information The internal diagnostic information is offered by acyclic access The following tables define the data layout of thes...

Страница 23: ...ed 6 Connection failed Set Inhibit time failed 7 Connection failed Establishing failed 12 Start up status UDINT Table 5 State of start up configuration with E300 MSB LSB additional status code status...

Страница 24: ...CAN Statistics Slot 4 Index 73 Byte offset Name Data Type Description 0 NoErrPassiveInt UINT Number of CAN error passive interrupts 2 NoWarnStatInt UINT Number of CAN error warning level interrupts 4...

Страница 25: ...o open the trip relay contact press the Test Reset button for 2 seconds and then release it To Reset the test 3 To close the trip relay contact press and immediately release the Test Reset button Prot...

Страница 26: ...ation connector 9 pin D sub Power consumption Typical 200 mA 5 VDC Termination active Storage temperature 25 to 90 C Operating temperature 25 to 70 C Humidity 5 95 non condensing Cooling method Natura...

Страница 27: ...28 UINT R Trip Sts Control 0 7 30 UINT R Warn Sts Control 0 13 32 UINT R Trip Sts Analog 0 8 34 UINT R Warn Sts Analog 0 14 36 UINT R Reserved 4 83 38 UINT R Reserved 0 40 40 USINT R Therm Utilized P...

Страница 28: ...75 DINT 4 R Apparent Power S 0 127 UINT 2 R Last Fault Code 0 163 USINT 1 RW Network Trip Reset 0 164 USINT 1 RW Config Preset 0 165 USINT 1 RW Clear command 0 171 UDINT 4 RW FLA Setting 0 183 WORD 2...

Страница 29: ...2 RW Potential Transformer Primary 1 99 UINT 2 RW Potential Transformer Secondary 1 100 USINT 1 RW Undervoltage Inhibit Time 1 101 USINT 1 RW Undervoltage Trip Delay 1 102 UINT 2 RW Undervoltage Trip...

Страница 30: ...This page is intentionally left blank...

Страница 31: ...This page is intentionally left blank...

Страница 32: ...This page is intentionally left blank...

Отзывы: