HME SPP2 Скачать руководство пользователя страница 2

      Figure 3.

Assembly of anchor bolts with template

      Figure 4.

Template, anchor bolt and conduit

positions in hole

Step 2

Remove one of the two hexagonal nuts
from each of the anchor bolts.  

Be certain the second nut is all the way
down to the bottom of the threaded
area on the anchor bolt as shown in
Figure 3.

Put the threaded end of each anchor
bolt through one of the ½ inch holes in
the template, and replace the nut on
the  anchor bolt until it holds the
template snugly between the two nuts.

Position the "L" ends of the anchor bolts
outward, away from each other.  Place
the anchor bolts into the hole in the
ground with the template ¼" to ½"
above the top of the form, as level as
possible.  Be certain to comply with the
note on the template to place one edge
of the template "TOWARD DRIVE-THRU
LANE."

Step 3

Route the conduit (one or more) so
it/they will extend through the center of
the hole, and upward approximately 6
inches  through the center of the
template as shown in Figure 4.

NOTE:

  If a loop-type vehicle detector

will be used, a separate conduit must
be dedicated for the loop cable.

Step 4

Hold the template steady, and fill the
hole with concrete to the bottom of
the template.  Smooth the concrete,
sloping it away from the template
toward the form for proper drainage,
and allow it to dry.  

After the concrete has dried, remove
the upper nuts and template from the
anchor bolts.  

Отзывы: