Hitecsa ACHA 1001 Скачать руководство пользователя страница 6

 


 

IOM ACHA-ACHBA_201a1201_208000_180901_EN

 

ACHA / ACHBA

 

PACKAGED COMPACT 
HORIZONTAL AIR - AIR

 

INTRODUCTION 

CONTENTS 

 
Periodic Inspections and Maintenance 
 

 

Carry out periodic inspections to detect possible damaged or broken pieces. If they are not repaired it could 
cause  damage  to  people  or  stuff.  Before  executing  any  maintenance  operation,  cut  off  the  unit  power 
supply.  

All operations should be carried out in accordance with local safety regulations. 

 
Repairs 

 

 

The  reparations  should  be  always  and  exclusively  realized  for  trained  personal  authorized  by  the 
manufacturer using original spares. The safeties of the unit could be affected due to the failure to comply 
with these warnings. 

 
Modifications 
 

The  manufacturer  will  not respond  to  the  warranty  and  to  the  possible damages  of the  unit  in case  of electrical  and/or 
mechanical modifications. The unauthorized manipulation, reparation or modification of the unit will automatically invalidate 
the warranty.  
 

 

Refrigerant 
 

This product is hermetically sealed and contains R-410A which is a HFC fluorinated greenhouse gas. 

 
 
 
 

REGULATIONS AND CERTIFICATIONS 

 

 
ISO  9001  CERTIFICATION: 

HIPLUS  AIRE  ACONDICIONADO  S.L.,  trying  always  to  find  the  maximum  satisfaction  of 

costumers, has obtained the ISO 9001 Quality System referred to its production activity. This will result in a continuous 
determination to improve quality and reliability of all our products; commercial activities, design, raw materials, production 
and after-sales service, are the means to reach our goal.  
 

CE MARKING

: Our machines have got the CE mark, in conformity with the essential requirements of the applicable EC 

directives and their last modifications as well as with the national legislation of each country.  

 
 
 
 
 
 

 
 
 

 
 

In  accordance  with  Article  1,  (m)  Subject  matter  and  scope  of    Regulation  (EU)  2016/2281  of  November  30

th

,  2016  concerning  the 

ecodesign requirements for air heating products, cooling products, high temperature process chillers and fan coil units, the equipment 
mentioned in the present document shall be used only for applications of which the primary function is the purpose of producing or storing 
perishable materials at specified temperatures by commercial, institutional or industrial facilities and of which space heating and/or space 
cooling is a secondary function and for which the energy efficiency of the space heating and/ or space cooling function is dependent on 
that of the primary function. Therefore they are not valid for comfort applications in spaces occupied by people. 

 
 

Содержание ACHA 1001

Страница 1: ...CHA ACHBA_201a1201_208000_180901_EN ACHA ACHBA Cooling only Heat pump PACKAGED HORIZONTAL COMPACT AIR AIR Models 201 251 351 371 401 501 701 721 751 801 1001 1201 Cooling Capacities from 5 6 kW to 33...

Страница 2: ...efficiency adaptability usability and practical solutions This has been the hallmark of our product catalogue The versatility of our factory allows us to contribute solutions almost tailored to each p...

Страница 3: ...TRANSPORT RECEPTION 10 INSPECTION AT RECEPTION 10 RIGGING 10 STORAGE 10 INSTALLATION 11 WEIGHT DISTRIBUTION 11 DIMENSIONS 12 Model 201 12 Models 251 271 12 Model 351 13 Models 351 501 13 Modelos 701...

Страница 4: ...robe of indoor temperature of Th Tune 22 System Modes 23 Indoor Fan Fan Autofan with ventilation Continuous Auto 23 Time Schedule 23 Alarms 24 DIAGNOSIS ALARMS IN CONTROL 25 PGD1 OR MINI PGD THERMOSTA...

Страница 5: ...data shown in the data nameplate of the unit Local Safety Regulations Observe and analyze all possible causes of accidents that may arise in the place or places of installation of the units check mean...

Страница 6: ...L trying always to find the maximum satisfaction of costumers has obtained the ISO 9001 Quality System referred to its production activity This will result in a continuous determination to improve qua...

Страница 7: ...on commissioning and carry out maintenance works Unqualified staff can only make basic tasks such as cleaning and replacement of filters etc Prevent access to children so they cannot play with the app...

Страница 8: ...9 9 DD 10 10 DD 10 10 DD 10 10 DD 10 10 SS Motor power kW 0 120 0 250 0 250 0 373 0 373 0 550 Voltage V 230 1 230 1 230 1 230 1 230 1 400 3 Nominal current input A 1 6 1 5 1 9 2 6 2 7 1 6 OUTDOOR FAN...

Страница 9: ...S 12 9 SS 12 9 SS 12 12 SS 15 15 SS Motor power kW 0 735 0 735 0 735 0 735 1 5 1 5 Voltage V 400 3 N 400 3 N 400 3 N 400 3 400 3 400 3 Nominal current input A 2 0 2 0 2 1 2 3 3 0 3 0 OUTDOOR FAN Type...

Страница 10: ...el similar to the one shown below Be sure to hoist the machine through the points indicated in the diagram Make sure that the unit is balanced stable and without any deformations when it is lifted STO...

Страница 11: ...ION WEIGHT DISTRIBUTION MODELS 1 2 3 4 TOTAL 201 63 26 38 36 163 251 66 38 52 49 205 351 73 39 51 51 214 371 87 44 64 58 253 401 89 46 67 58 260 501 97 49 68 52 266 701 94 77 135 78 384 721 94 79 131...

Страница 12: ...or turbine 7 Motor outdoor turbine 8 Outdoor turbine 9 Air filter 10 Internal drainage 3 4 11 External pressure intake 12 Electrical supply input 13 Outdoor drainage 3 4 LEGEND 1 Compressor 2 Outdoor...

Страница 13: ...otor outdoor turbine 8 Outdoor turbine 9 Air filter 10 Indoor drainage 3 4 11 External pressure intakes 12 Main switch 13 Electrical supply input 14 Outdoor drainage 3 4 LEGEND 1 Compressor 2 Outdoor...

Страница 14: ...turbine 7 Motor indoor turbine 8 Bater a exterior 9 Compressor 10 Indoor drainage 3 4 11 Electrical supply input 12 Main switch 13 External pressure intake 14 Outdoor drainage 3 4 LEGEND 1 Outdoor tu...

Страница 15: ...ght in operation Fit shock absorbers throughout the installation to prevent the transmission of noise and vibration Check that the direction of the sound level is not going to disturb anyone UNIT SETT...

Страница 16: ...exposed to air temperatures below 0 degrees it is necessary to cover with thermal insulation or electrical heating wire to avoid water freezing and tube damage It is convenient to install the drain t...

Страница 17: ...ed by Hitecsa s warranty When making electrical connections always use the unit wiring diagram Be sure that the compressor crankcase heater can be energized before unit start The line protection eleme...

Страница 18: ...2 5 2 5 ACHA ACHBA 701 721 751 801 1001 1201 Voltage V 50H z 400 3 N 400 3 N 400 3 N 400 3 N 400 3 N 400 3 N Total power input 1 kW 7 8 8 5 9 5 9 7 12 4 15 1 Total current input 1 A 16 9 18 6 20 2 20...

Страница 19: ...ded see diagram Legend 1 Main power supply 2 wires single phase 230V 1 50Hz 4 wires three phase neutral 400V 3 N 50Hz Without neutral option 3 wires three phase 400V 3 50hz 2 Ground 3 Thermic magnetic...

Страница 20: ...t be supplied with any other voltage than that indicated on the serial plate The power supply to the unit must be within 10 of the voltage indicated on the serial plate Check the correct rotation dire...

Страница 21: ...pen or close depending on the needs Open speed decreases 3 Tighten set screws 4 Place the belt in the pulley channel The closure or opening of the pulley could void the size of the prior belt In this...

Страница 22: ...tion simultaneously in the same display Central multifunctional button turn to move through the menus or increase decrease a value and press to introduce or select Start Stop Press and hold the On Off...

Страница 23: ...lay will show the icons at the same time The fan will operate in continuous mode and will not keep the value of the temperature introduced to the Set point in mind Units with EC fan have the chance to...

Страница 24: ...day the same schedule for all week displays all days or one from Monday to Friday and other from Saturday to Sunday Press the central button to select the desired day or days By turning the button yo...

Страница 25: ...t 1 ALPB Low pressure switch alarm circuit 1 ALF7 Thermal alarm of the indoor fan ALF6 Thermal alarm of the external fan compressor ALPM Minimum pressure switch alarm ALRF Lack of refrigerant alarm AL...

Страница 26: ...creen UP KEY Movement on the menus or modification of the values of the regulation parameters ENTER KEY Confirmation of the introduced values DOWN KEY Movement on the menus or modification of the valu...

Страница 27: ...1 models as standard HIT005 You will have 4 types of start in time schedule and when the time schedule is ON the screen will display the word PHASE A Manual type by selecting this type of start the un...

Страница 28: ...t is inside the section and the external out from the section Example From Monday to Thursday the program num 1 is activated internal Setpoint from 6 30 to 11 00 etc D ON OFF schedule type with SET li...

Страница 29: ...and press it again to leave the unit in the type of start up selected previously This option starts the machine during an established time in hours when you have selected the time schedule and for ex...

Страница 30: ...l 14 00 and start it again from 15 00 until 20 00 B Schedule until 3 holiday periods to define Introduce the date of start and end of period and the setpoints if it is ON or OFF Example Period from 25...

Страница 31: ...o the desired address value 1 5 Press the three keys until the next image right is displayed again put again the value of Display address setting to 32 Press Enter to confirm 6 Put I O Board adress th...

Страница 32: ...HITSAA01 ALARM MESSAGES pGD1 Optional HITSAA01 Message in Display Type Alarms Clock card error or not connected Warning Alarms Probe B01 broken or disconnected Warning Alarms ThTune offline Alarm Alar...

Страница 33: ...Alarm of the Burner Alarm Severe Damaged Memory indication Warning Missing Clock or not working Alarm Maintenance of the unit Only indication Warning Alarms Severe Return Temperature Probe Broken of...

Страница 34: ...maintenance form Coils At least once a year clean condenser coils with water and detergent then dry with air at low pressure Never clean with a wire brush water and or air at high pressure Drainage sy...

Страница 35: ...um pump If leakage symptoms appear during the operation it is necessary to leak test To find small leaks you will need a detector for HCF If gas leak is detected is necessary to remove and recuperate...

Страница 36: ...ere is risk of suffocation at higher concentrations due to the oxygen content reduction at the atmosphere Remove victim to fresh air keep it warm and at rest Supplemental oxygen if it is necessary If...

Страница 37: ...emperature below 50 C Protective Clothing Wear overalls protective waterproof gloves and protective goggles or a mask Accidental Release Measures It is important to wear protective clothing and a resp...

Страница 38: ...38 IOM ACHA ACHBA_201a1201_208000_180901_EN ACHA ACHBA PACKAGED COMPACT HORIZONTAL AIR AIR All rights reserved to make modifications to this catalogue without prior notice notice...

Отзывы: