5-1
OPERATING THE MACHINE
Control Lever (ISO Pattern)
d
WARNING:
Never place any part of body beyond window frame.
It could be crushed by the boom if boom control
lever is accidentally bumped or otherwise engaged.
Never remove the window sash bar.
Make sure you know the location and function of
each control before operating.
Do not change the control lever operation pattern.
Failure to do so may result in operation mistake of
the machine.
A label showing the control patterns of the levers and pedals is
attached on the right side in the cab.
When a lever is released, it will automatically return to neutral,
and that machine function will stop.
1- Arm Roll-Out
2- Arm Roll-In
3- Swing Left
4- Swing Right
5- Boom Lower
6- Boom Raise
7- Bucket Roll-In
8- Bucket Roll-Out
3
6
1
4
5
8
7
2
M1M7-05-001
M1M7-05-002
8
4
7
3
5
1
6
2
MABA-05-001
MABA-05-016
Содержание Zaxis 17U-5A
Страница 4: ......
Страница 8: ...CONTENTS MEMO ...
Страница 12: ...MACHINE NUMBERS 4 MEMO ...
Страница 75: ...OPERATOR S STATION 1 9 Radio ZX26U 5A Cab equipped machine Optional 1 Radio Clock 1 MABA 01 013 ...
Страница 84: ...OPERATOR S STATION 1 18 MEMO ...
Страница 86: ...BREAK IN 2 2 MEMO ...
Страница 108: ...DRIVING THE MACHINE 4 14 MEMO ...
Страница 228: ...MAINTENANCE 7 88 MEMO ...
Страница 230: ...MAINTENANCE UNDER SPECIAL ENVIRONMENTAL CONDITIONS 9 2 MEMO ...
Страница 232: ...STORAGE 10 2 MEMO ...
Страница 240: ...TROUBLESHOOTING 11 8 MEMO ...
Страница 250: ...SPECIFICATIONS 12 10 MEMO ...
Страница 270: ...13 20 NUMERIC KEYPAD LOCK OPTIONAL ATTACHMENT MEMO ...
Страница 274: ...INDEX 14 4 MEMO ...
Страница 276: ......
Страница 277: ......
Страница 278: ......