2–40
Installation Requirements
Hitachi Universal Storage Platform VM Installation Planning Guide
Operational Requirements
The operational requirements for the Universal Storage Platform VM
include:
• LAN connection (or analog phone line) for Hi-Track
®
The Hi-Track maintenance support tool monitors the operation of the
Universal Storage Platform VM, collects hardware status and error data,
and transmits this data via LAN (or modem) to the Hitachi Data Systems
Support Center. In the event of a component failure, Hi-Track reports the
failure to the Support Center, with no action required on the part of the
user. Hi-Track enables most problems to be identified and fixed prior to
actual failure, and the advanced redundancy features enable the storage
system to remain operational even if one or more components fail.
• LAN for Storage Navigator
Hitachi Storage Navigator communicates directly with the Universal
Storage Platform VM via LAN to obtain system configuration and status
information and send user-requested commands to the storage system.
Storage Navigator serves as the integrated interface for all Resource
Manager components.
• Cable length for front-end directors
lists the cable length requirements for the front-end directors
(FEDs) in the Universal Storage Platform VM.
• External storage
If you plan to attach external storage to the Universal Storage Platform
VM, be sure to include the appropriate power and space requirements in
your planning.
•
Table 2-12: FED Cable Length Requirements
Cable
Maximum Cable Length (Data Transfer Rate)
ESCON
3 km
FICON Short Wave
50/125-µm multimode
62.5/125-µm multimode
500 m (100 MB/s), 300 m (200 MB/s), 150 m (400 MB/s)
300 m (100 MB/s), 150 m (200 MB/s), 75 m (400 MB/s)
FICON Long Wave
10 km
Fibre Channel Short Wave
50/125-µm multimode
62.5/125-µm multimode
500 m (100 MB/s), 300 m (200 MB/s), 150 m (400 MB/s)
300 m (100 MB/s), 150 m (200 MB/s), 75 m (400 MB/s)
Fibre Channel Long Wave
10 km