![Hitachi RPK-0.8HNBUSQ Скачать руководство пользователя страница 9](http://html.mh-extra.com/html/hitachi/rpk-0-8hnbusq/rpk-0-8hnbusq_manual_2139420009.webp)
3
Necessary Tools
3. Necessary Tools
Necessary Tools and Instrument List for Installation
No.
Tool
No.
Tool
1 Handsaw
11 Spanner
2 Screwdriver
12 Charging Cylinder
3 Vacuum Pump
13 Gauge Manifold
4 Refrigerant Gas Hose
14 Cutter for Wires
5 Megohmmeter
15 Gas Leak Detector
6 Copper Pipe Bender
16 Spirit level
7 Manual Water Pump
17 Clamper for Solderless
Terminals
8 Pipe Cutter
18 Hoist
(
for Indoor Unit)
9 Brazing Kit
19 Ammeter
10 Hexagon Wrench
20 Voltage Meter
NOTE
Please use tools or devices exclusively for R410A when contacting with R410A is inevitable.
Do not mix with other refrigerants.
4. Transportation and Handling
4.1 Transportation
Transport the product as close to the installation location
as practical before unpacking.
Do not put any materials on the product.
4.2 Handling
Do not put any foreign matters into the indoor unit and
check to ensure that none exists in the indoor unit before
installation and test run. Otherwise, it may lead to a fire or
failure, etc.
Be careful not to damage on insulation materials on unit
surface when lifting.
5. Precautions during Installation
Do not install the indoor unit in a flammable environment to
avoid a fire or explosion.
●
Check to ensure that the ceiling slab is strong enough.
Otherwise, the indoor unit may fall down.
●
Do not install the indoor unit outdoors. Otherwise, an
electric hazard or electric leakage will occur.
It is recommended that indoor units be installed at least
2.5 meters above the floor level.
●
Please make sure the accessories are shipped along
with the indoor unit. If not, please contact the distributer.
Содержание RPK-0.8HNBUSQ
Страница 2: ......
Страница 21: ...15 12 Electrical Wiring Diagram ...