4.  Preparation  of  Pipe

  Use  a  pipe  cutter  to  cut  the  copper  pipe.

  Before 

ß

 aring,  please  put  on  the 

ß

 are  nut.

Outer
Diameter  (Ø)

6.35  (1/4”)

9.52  (3/8”)

12.7  (1/2”)

Imperial 

ß

 aring  tool

~

  0.5mm

~

  0.5mm

~

  0.5mm

Rigid 

ß

 aring  tool

A  (mm)

  Please  use  exclusive  tool

1.0mm

1.0mm

1.0mm

Outer  diameter  of  pipe  (Ø)

Torque  N·m  (kgf  ·  cm)

Small  diameter  side

  Please  be  careful  when  bending  the  copper  pipe.

  Screw in manually while adjusting the center. After that, use of torque wrench to tighten the connection.

Large  diameter  side

6.35  (1/4”)

13.7-18.6  (140-190)

9.52  (3/8”)

34.3-44.1  (350-450)

12.7  (1/2”)

44.1-53.9  (450-550)

Small  diameter  side

Large  diameter  side

6.35  (1/4”)

19.6-24.5  (200-250)

9.52  (3/8”)

19.6-24.5  (200-250)

12.7  (1/2”)

29.4-34.3  (300-350)

Valve  head 
cap

12.3-15.7  (125-160)

Valve  core  cap

CAUTION

!

  In  case  of  removing 

ß

 are  nut  of  a  indoor  unit, 

Þ

 rst  remove  a  nut  of  small  diameter  side,  or  seal 

cap  of  large  diameter  side  will 

ß

 y  out.  Free  from  water  into  the  piping  when  working.

  During  connection,  keep  away  from  water.

  Be  sure  to  tighten  the 

ß

 are  nut  to  the  speci

Þ

 ed  torque  using  a  torque  wrench.  If  the 

ß

 are  nut  is 

tightened  excessively,  it  may  crack  as  time  elapses,  causing  refrigerant  leakage.

  Install  the  unit  in  a  stable  place  to  minimize  vibration  or  noise.

  After  arranging  the  cords  and  pipes,  secure  them  in  place.

Gas  leakage  inspection

Please  use  gas  leakage  detector  to  check  if  leakage  occurs
at  connection  of 

ß

 are  nut  as  shown  on  the  right.

If gas leakage occurs, further tighten the connection to stop leakage. 
(Use the detector provided for R410A)

Tighten all the way by hand.

Do not tighten all at once, but tighten it while 

Þ

 tting the 

ß

 ared surface to the pipe.

5.  Pipe  Connection

5.1   Pipe connection
 

Connecting the pipe to outdoor unit

 
 

(1) Remove the 

ß

 are nut and seal cap from the service valve.

 

(2) Apply  refrigerator  oil  to  the  service  valve  and  the 

ß

 ared  

 

 

portion of the pipe.

 

(3) Using a wrench, security tighten.

  Jagged  edge  will  cause  leakage.

  Point  the  side  to  be  trimmed  downwards  during  trimming 

to  prevent  copper  chips  from  entering  the  pipe.

7.  Operation test

  Please  ensure  that  the  air  conditioner  is  in  normal  operating  condition  during  the  operation  test.

  Explain  to  your  customer  the  proper  operation  procedures  as  described  in  the  user’s  manual.

  If  the  indoor  unit  does  not  operate,  check  to  see  that  the  connections  are  correct.

CAUTION

●   

Trial run should be conducted on one unit at a time to check for incorrect wiring of connecting cord.

!

<

IA894:  A 

>

6.  Removal  Of  Air  From  The  Pipe  And  Gas  Leakage  Inspection

6.1   Air purging by using vacuum pump

Fig. 6-1

Fig. 6-2

Fig. 6-3

CAUTION

!