Hitachi RAM-68NP3B Скачать руководство пользователя страница 2

4. Preparation of Pipe

 Use a pipe cutter to cut the copper pipe.

 Before 

fl

 aring, please put on the 

fl

 are  nut.

Outer
Diameter (Ø)

6.35 (1/4”)

9.52 (3/8”)

12.7 (1/2”)

Imperial 

fl

 aring  tool

~

 0.5mm

~

 0.5mm

~

 0.5mm

Rigid 

fl

 aring  tool

A (mm)

 Please use exclusive tool

1.0mm

1.0mm

1.0mm

Outer diameter of pipe (Ø)

Torque N·m (kgf · cm)

Small diameter side

 Please be careful when bending the copper pipe.

 Screw in manually while adjusting the center. After that, use of torque wrench to tighten the connection.

Large diameter side

6.35 (1/4”)

13.7-18.6 (140-190)

9.52 (3/8”)

34.3-44.1 (350-450)

12.7 (1/2”)

44.1-53.9 (450-550)

Small diameter side

Large diameter side

6.35 (1/4”)

19.6-24.5 (200-250)

9.52 (3/8”)

19.6-24.5 (200-250)

12.7 (1/2”)

29.4-34.3 (300-350)

Valve head 
cap

12.3-15.7 (125-160)

Valve core cap

CAUTION

!

 In case of removing 

fl

 are nut of a indoor unit, 

fi

 rst remove a nut of small diameter side, or seal 

cap of large diameter side will 

fl

 y out. Free from water into the piping when working.

 During connection, keep away from water.

 Be sure to tighten the 

fl

 are nut to the speci

fi

 ed torque using a torque wrench. If the 

fl

 are nut is 

tightened excessively, it may crack as time elapses, causing refrigerant leakage.

 Install the unit in a stable place to minimize vibration or noise.

 After arranging the cords and pipes, secure them in place.

Gas leakage inspection

Please use gas leakage detector to check if leakage occurs
at connection of 

fl

 are nut as shown on the right.

If gas leakage occurs, further tighten the connection to stop leakage. 
(Use the detector provided for R410A)

Tighten all the way by hand.

Do not tighten all at once, but tighten it while 

fi

 tting the 

fl

 ared surface to the pipe.

5. Pipe Connection

5.1   Pipe connection
 

Connecting the pipe to outdoor unit

 
 

(1) Remove the 

fl

 are nut and seal cap from the service valve.

 

(2) Apply refrigerator oil to the service valve and the 

fl

 ared  

 

 

portion of the pipe.

 

(3) Using a wrench, security tighten.

 Jagged edge will cause leakage.

 Point the side to be trimmed downwards during trimming 

to prevent copper chips from entering the pipe.

7. Operation test

 Please ensure that the air conditioner is in normal operating condition during the operation test.

 Explain to your customer the proper operation procedures as described in the user’s manual.

 If the indoor unit does not operate, check to see that the connections are correct.

CAUTION

●  

Trial run should be conducted on one unit at a time to check for incorrect wiring of connecting cord.

!

6. Removal Of Air From The Pipe And Gas Leakage Inspection

6.1   Air purging by using vacuum pump

Fig. 6-1

Fig. 6-2

Fig. 6-3

CAUTION

!

<

IA1219: A 

>

INS RAM-68NP3B   2

INS RAM-68NP3B   2

3/24/16   5:12 PM

3/24/16   5:12 PM

Отзывы: