Hitachi RAC-X24CAT Скачать руководство пользователя страница 2

Gas Leakage Inspection

Please use gas leakage detector to check if leakage 
occurs at the connection of Flare nut as shown 
on the right.

If gas leakage occurs, further tighten the connection 
to stop leakage.

FINAL

 ST

AGE OF INST

ALLA

TION

Insulation And Maintenance Of Pipe Connection

1

 The connected terminals should be completely sealed with 

heat insulator and then tied up with rubber strap.

 Please tie the pipe and power line together with vinyl tape 

as shown in the  gure showing the installation of Indoor and 
Outdoor units. Then  x their position with holders.

 To enchance the heat insulation and to prevent water 

condensation, please cover the outdoor part of the drain hose 
and pipe with insulation pipe.

 Completely seal any gap with putty.

  Installation Of Remote Controller

2

  Power Source And Operation Test

3

 The remote controller can be placed in its holder which is 

 xed on wall or beam.

 To operate the remote controller at its holder, please ensure 

that the unit can receive signal transmitted from the controller 
at the place where the holder is to be  xed. The unit will beep 
when signal is received from the remote controller. The signal 
transmission is weaken by the  uorescent  light.  Therefore, 
during the installation of the remote control holder, please 
switch on the light, even during day time, to determine the 
mounting location of the holder.

Power Source

CAUTION

!

 Please use a new socket. Accident may occur due to the use 

of old socket because of poor contact.

 Please plug in and then remove the plug for 2 – 3 times. This 

is to ensure that the plug is completely plugged into the socket.

 Keep additional length for the power cord and do not render 

the plug under external force as this may cause poor contact.

 Do not  x the power cord with U-shape nail.

Operation Test

 Please ensure that the air conditioner is in normal operating 

condition during the operation test.

 Explain to your customer the proper operation procedures as 

described in the user’s manual.

<

IA753: B 

>

   Preparation of Pipe

1

  Use a pipe cutter to cut 

the copper pipe.

 Jagged edge will cause leakage.

 Point the side to be trimmed downwards during trimming to prevent copper 

chips from entering the pipe.

 Before  aring, please put on the  are nut.

   Pipe Connection

2

INST

ALLA

TION OF REFRIGERA

TING PIPES 

AND 

AIR REMOV

AL

CAUTION

!

WARNING

 If you cannot attach the side cover 

due to the connecting cord, press the 
connecting cord in direction to the front 
panel to  x it.

  Be sure that the hooks of the side cover 

is  xed in certainly. Otherwise water 
leakage may occur and this causes short 
circuit or faults.

 The connecting cord should not touch 

to service valve and pipes. (It becomes 
high temperature in heating operation.)

Checking for the electric source 
and the voltage range

 Before installation, the power source must be checked and 

necessary wiring work must be completed. To make the 
wiring capacity proper, use the wire gauges list below for 
the lead-in from a pole transformer and for the wiring from 
a switch board of fuse box to the main switch and outdoor 
unit in consideration of the locked rotor current.

 THIS APPLIANCE MUST 

BE EARTHED.

Procedures of Wiring

Wiring of The Outdoor Unit

 Please remove the side cover for wire connection.

!

CONNECTION OF POWER CORD

 Please be careful when bending the copper pipe.

 Screw in manually while adjusting the center. After that, use of torque wrench to 

tighten the connection.

!

In case that power is supplied from Indoor Unit

CAUTION

!

In case of removing  are nut of an Indoor unit,  rst remove a nut 
of small diameter side, or a seal cap of big diameter side will  y 
out. Prevent water from entering into the piping when working.

Power line

Control line

GRN + YEL

How to Attach the Front Cover

 1  After covering the front cover to the unit, certainly hook 

at the upper portion (four places). Then, check that the 
drain pan is certainly attached. Push the front cover in 
the direction of arrow at the

  

portion of hooks.

 2  Hook the front cover at lower portion to the drain pan and 

then  x them by screws and attach the caps.

 3  Attach the front panel.

 

Certainly insert the left shaft of the front panel to the hole 
of the front cover. Next insert the right shaft as same as 
the left.

 4  Attach the  lters which are placed the surface written 

“FRONT” up.

 

After attaching the  lters, push the front panel at three 
arrow portion as shown in  gure and close it.

Hole

A

B

C

D

How to Remove The Front Cover

 1  Open the front panel.

 

Please remove and attach 

  

the front panel by both 

  

hands.

 

 

After opening the front panel by both hands.

 1  Undo the right arm while pushing it inside.

 2  Slide the front panel to right as shown in  gure.  Then 

remove while pulling it to front.

 2  Remove the  lters.

 3  Remove the caps and screws 
  

at the lower portion of the 

  

front cover.

 4  Pull the front cover upward as far 
  

as the location where the lower 

  

portion of the front cover is on 

  

the de ector.

 5  Remove while pulling the front 
  

cover in direction to arrow as 

  

shown in  gure to hold the 

  

both sides of front cover.

Lower portion of front cover

De ector

Removal Of Air From The Pipe And Gas Leakage Inspection

3

 The naked part of the wire core should be 10 mm and 

 x it to the terminal tightly. Then try to pull the individual 
wire to check if the contact is tight. Improper insertion 
may burn the terminal.

 Be sure to use only power cables approved from the 

authorities in your country. For example in Germany: 
Cable type: NYM 3x1.5mm

2

, (fuse = 20A time delay)

  Please refer to the installation manual for wire connection 

to the terminals of the units. The cabling must meet the 
standards of electrical installation.

 There is a AC voltage of 220V between the L, N, A 

and B terminals. Therefore, before servicing, be sure 
to remove the plug from the AC outlet or switch off the 
main switch.

WARNING

!

OUTDOOR UNIT

 Please mount the outdoor unit on stable ground to prevent 

vibration and increase of noise level.

  Decide the location for piping after sorting out the different types 

of pipe available.

  Open the side plate by unscrewing the screws as shown below.

Please remove side cover 
when connecting the piping 
and connecting cord.

CAUTION

!

Please make sure to remove all spacers inside the unit.

 Open the Top, Back and Side cover of the unit.

 Pull out the spacers inside.

  (Spacers are only for transportation purpose).
  If not remove, vibration and noise will occur.

 Investigate the power supply capacity and other 

electrical conditions at the installation location.

  Depending on the model of room air conditioner to be 

installed, request the customer to make arrangements 
for the necessary electrical work etc.

  The electrical work includes the wiring work up the 

outlet. In localities where electrical conditions are 
poor, use of a voltage regulation is recommended.

 IMPORTANT

Fuse Capacity

30A time delay fuse

A

B

Wiring Of The Indoor Unit

  For wire connection of the Indoor unit, you need to remove front panel 

and electrical cover.

Method to remove front panel

  Refer to “FINAL STAGE OF INSTALLATION – How to Remove The 

Front Cover”.

Method to remove electrical cover

  Remove the screw and electrical cover.

  Insert the connecting cord (A, B, C, D) from the bottom of unit.

 Fixed the wire to terminal wires  rmly as shown in  gure  at 

right side.

Screw

Electrical cover

Screw

C

D

CAUTION

Outdoor supply cords shall not be lighter than 
polychloroprene sheathed  exible cord with code 
designation 60245 IEC 57. 

IMPORTANT

Cable length

up to 

1

6m

up to 15m
up to 25m

Wire cross-section

1.5mm

2

2.5mm

2

4.0mm

2

[For all optional part, please refer catalog for part number]

As for connecting to H-Link, a separately purchased 
RAC Adapter is required.

  To install the wiring the electrical box cover must be opened.

 Connect the connector of RAC adapter to CN1101.

 Assemble back the cover of electrical box.

 Please refer to the respective user manual of RAC Adapter 

for further details.

 Please be careful not to damage lead wires by edge of 

plate when connecting the optional parts.

[For all optional part, please refer catalog for part number]

Connection to the electrical box:

 Remove the cover of electrical box.

 Connect the connector of Weekly Timer/wired remote 

controller to CN1102.

 Assemble back the cover of electrical box.

  Please refer to the respective user manual of Weekly Timer/

wired remote controller for further details.

 Please be careful not to damage lead wires by edge of 

plate when connecting the optional parts.

WEEKLY TIMER / WIRED REMOTE CONTROLLER

H-LINK

How To Connect The Optional Parts

(RAC Adapter, Weekly Timer, Wired Remote Control)

Please face this side 
(suction side) of the 
unit to the wall.

Pull downward

Indoor

Unit

Outdoor

Unit

GRN + YEL

Strip wires

After remove the screw 
and band, put the con-
necting cords and  x  the 
band with screw.

Connect the
earth cord

L

N

Earth terminal

Screw

Cap

Shaft

Guide

  Recommend to use 

R410A  aring tool.

Outer
Diameter (mm)

6.35 (1/4)

9.52 (3/8)

12.70 (1/2)

15.88 (5/8)

1.0 ~ 1.5

1.0 ~ 1.5

1.0 ~ 1.5

1.0 ~ 1.5

Clutch type

A (mm)

1.5 ~ 2.0

1.5 ~ 2.0

1.5 ~ 2.5

1.5 ~ 2.5

Wing nut type

Thickness

(mm)

0.8

0.8

0.8

1.0

0.0 

~

 0.5

0.0 

~

 0.5

0.0 

~

 0.5

0.0 

~

 0.5

Flare tool for R410A

Clutch type

Conventional  are  tool

Outer

dia.of pipe

6.35 (1/4")

15.88 (5/8")

6.35 (1/4")

15.88 (5/8")

Valve 

head cap

Torque N·m

(kgf · cm)

13.7 ~ 18.6 (140 ~ 190)

49.0 ~ 58.8 (500 ~ 600)

19.0 ~ 21.0 (194 ~ 214)

29.0 ~ 31.0 (296 ~ 316)

9.0 (92)

Small dia. side

Large dia. side

Valve core cap

Small dia. side

Large dia. side

When the meter reaches - 101KPa (-76cmHg) 
during pumping, fully tighten the shuttle.

Lo

Hi

Meter showing pressure

Closed

R410A
Manifold valve

Vacuum pump

Valve

Charge hose

Valve

Vacuum 
pump
adapter

When pumping starts, slightly loosen the 
 are nut to check of air sucked in. Then 
tighten the  are  nut.

Procedures of using Vacuum Pump for Air Removal

AIR REMOV

AL

As shown in right  gure, remove the cap of 
valve core. Then, connect the charge hose. 
Remove the cap of valve head. Connect the 
vacuum pump adapter to the vacuum pump 
and connect the charge hose to the adapter.

Fully tighten the “Hi” knob of the manifold 
valve and completely unscrew the “Lo” knob. 
Run the vacuum pump for about 10~15 
minutes, then completely tighten the “Lo” knob 
and switch off the vacuum pump.

2

Completely unscrew the spindle of the 
service valve (at 2 places) in anti-clockwise 
direction to allow the  ow of refrigerant (using 
Hexagonal Wrench key).

Re-cap the service valve and tighten using 
wrench. Check the cap’s periphery if there is 
any gas leakage. The task is then completed.

Remove the charge hose and tighten the cap 
of valve core. Check the cap’s periphery if 
there is any gas leakage. 

4

5

1

3

The controller should be 
insert from top into bottom 
side of the holder as shown 
in  gure  below.

Top cover

Side cover

Back cover

  How to check pipe bending.

  –  Compare bended pipe with the picture below.
  –  If bended pipe is not good enough, cut bended area 

and bend it again.

  a  all areas are smooth, no notching area
  b  no scratch or mark inside
  c  all have the same length
  d  phase of bending is too long
 e slanting
  f  there are scratches around bending area
 g crack
 h different 

length

  i  sample of bending pipe cannot be used

WARNING

INS RAS-X24CAT (2).indd   1

2/10/12   3:45 PM

Отзывы: