Hitachi RAC-S13CYT Скачать руководство пользователя страница 2

OUTDOOR UNIT

Please mount the outdoor unit on stable ground to prevent

vibration and increase of noise level.

Decide the location for piping after sorting out the different

types of pipe available.

Open the side plate by unscrewing the screws as shown below.

Removal Of Air From The Pipe And Gas Leakage Inspection

Gas Leakage Inspection

Please use gas leakage detector to check if leakage
occurs at the connection of Flare nut as shown on
the right.

If gas leakage occurs, further tighten the connection
to stop leakage.

FINAL ST

A

GE OF INST

ALLA

TION

Insulation And Maintenance Of Pipe Connection

1

The connected terminals should be completed sealed with heat
insulator and then tied up with rubber strap.

Please tie the pipe and power line together with vinyl tape as shown
in the figure showing the installation of indoor and outdoor units.
Then fix their position with holders.

To enchance the heat insulation and to prevent water condensation,
please cover the outdoor part of the drain hose and pipe with insulation
pipe.

Completely seal any gap with putty.

  Installation Of Remote Controller

2

  Power Source And Operation Test

3

The remote controller can be placed in its holder which is fixed on wall
or beam.

To operate the remote controller at its holder, please ensure that the
unit can receive signal transmitted from the controller at the place
where the holder is to be fixed. The unit will beep when signal is
received from the remote controller. The signal transmission is weaken
by the florescent light. Therefore, during the installation of the remote
control holder, please switch on the light, even during day time, to
determine the mounting location of the holder.

Power Source

CAUTION

!

Please use a new socket. Accident may occur due to the use of
old socket because of poor contact.

Please plug in and then remove the plug for 2 – 3 times. This is
to ensure that the plug is completely plugged into the socket.

Keep additional length for the power cord and do not render the
plug under external force as this may cause poor contact.

Do not fix the power cord with U-shape nail.

Operation Test

Please ensure that the air conditioner is in normal operating condition
during the operation test.

Explain to your customer the proper operation procedures as
described in the user’s manual.

Insulation material for pipe connection

Sleeve of
protection pipe

Putty

<

IA547: A 

>

3

   Preparation of Pipe

1

Use a pipe cutter to cut the copper pipe.

Jagged edge will cause leakage.

Point the side to be trimmed downwards during trimming to prevent copper
chips from entering the pipe.

Before flaring, please put on the flare nut.

   Pipe Connection

2

INST

ALLA

TION OF REFRIGERA

TING PIPES AND AIR REMO

VA

L

CAUTION

!

Outer

diameter

of pipe

6.35 (1/4")

12.7 (1/2")

Valve head cap

Valve core cap

Torque N.m

(kgf 

 cm)

13.7 – 18.6 (140 – 190)

44.1 – 53.8 (450 – 550)

19.6 – 24.5 (200 – 250)

12.3 – 15.7 (125 – 160)

Copper pipe

Trimming tool

Outer

Diameter (ø)

6.35 (1/4")

12.7 (1/2")

Imperial flaring tool

0.8 – 1.5

1.0 – 2.0

Rigid flaring tool

0 – 0.5

0 – 1.0

A (mm)

Small diameter

side

Big diameter

side

AIR REMO

V

A

L

WARNING

You may not be able to close the side cover due to the
connecting cord, under such situation, please press against
the wall of side cover to fix it.

Be sure that the hooks (2 places) are plugged in.
Otherwise, water leakage may occur and this causes short
circuit or faults.

Checking for the electric source and the
voltage range

Before installation, the power source must be checked and necessary wiring work
must be completed. To make the proper wiring capacity, use the wire gauges list
below for the lead-in from a pole transformer and for the wiring from a switch
board of fuse box to the outlet in consideration of the locked rotor current.

Investigate the power supply capacity and other electrical
conditions at the installation location.
Depending on the model of room air conditioner to be installed,
request the customer to make arrangements for the necessary
electrical work etc.
The electrical work includes the wiring work up the outlet. In
localities where electrical conditions are poor, use of a voltage
regulation is recommended.

Wire length

up to 

1

6m

up to 10m
up to 15m
up to 25m
up to 42m

Wire gauge

1.6mm (B.S. 14)
2.0mm (B.S. 12)
2.6mm (B.S. 10)
3.2mm (B.S. 

1

8)

14mm

2

 (B.S. 

1

6)

IMPORTANT

THIS APPLIANCE MUST BE EARTHED.

Procedures of Wiring

Connect the electrical wiring between the indoor and outdoor unit as shown in below Fig.
Never connect the wiring by mistake.

The connection cord must be fixed by the band which is located on the electrical box.

Wiring Of The Outdoor Unit

Please remove the side cover for wire connection.

!

WARNING

!

CONNECTION OF PO

WER CORD

A

Die

Die

Copper pipe

Wrench

Torque
wrench

Flare nut

The body of
service valve

Cap of
valve core

Hexagonal
Wrench Key

Cap of valve head

Cap of valve head

CAUTION

!

In case of removing Flare nut of a cooling unit, first remove a nut of
small diameter side, or else seal cap of big diameter side will fly out.

Please be careful when bending the copper pipe.

Applied frozen grease to the connection points and then screw in manually. After that,
use a torque wrench to tighten the connection.

WARNING

!

Power supply shall be connected at the rated voltage, otherwise the unit will be broken or
could not reach the specified capacity.

Detail of cutting the connecting cord

To remove the connecting wires
for the indoor unit, please remove
the low cover panel in front of
the unit.

A

B

A

B

(L) Brown

(N) Blue

Terminal Board

Line Cord

Terminal Board

Green & Yellow

Green &

Yellow

Outdoor Unit

Indoor Unit

Indoor

Unit

Outdoor

Unit

GRN + YEL

10mm

30mm

30mm

10mm

GRN + YEL

70mm

35mm

10mm

Please face this side (suction
side) of the unit to the wall.

Please remove side cover
when connecting the piping
and connecting cord.

Pull downward

Connect the
earth cord

After remove the
screw and band,
put the connecting
cords and fix the
band with screw.

Earth terminal

B

A

A

B

Wiring Of The Indoor Unit

For wire connection of the Indoor unit, you need to remove front panel and electrical cover.
Method to remove front panel

Refer to “How to Remove The Front Cover”.

CAUTION

!

Please make sure to remove all spacers inside the unit.

Open the Top, Back and Side cover of the unit.

Pull out the spacers inside.

(Spacers are only for transportation purpose).

If not remove, vibration and noise will occur.

Top cover

Back cover

Side cover

The controller should be
insert from top into bottom
side of the holder as shown
in figure below.

The naked part of the wire core should be 10 mm and fix it to the terminal tightly. Then try
to pull the individual wire to check if the contact is tight. Improper insertion may burn the
terminal.

Be sure to use only power cables approved from the authorities in your country. For example
in Germany: Cable type: NYM 3x1.5mm

2

, (fuse = 20A time delay)

Please refer to the installation manual for wire connection to the terminals of the units. The
cabling must meet the standards of electrical installation.

There is a AC voltage of 220V between the L and N terminals. Therefore, before servicing,
be sure to remove the plug from the AC outlet or switch off the main switch.

When the meter reaches - 101KPa
(-76cmHg) during pumping, fully
tighten the shuttle.

Meter showing pressure

Closed

Manifold valve

Vacuum
pump

Valve

Charge hose

Valve

Vacuum pump
adapter

When pumping starts, slightly loosen the
flare nut to check of air sucked in. Then
tighten the flare nut.

Lo

Hi

Procedures of using Vacuum Pump for Air Removal

As shown in right figure, remove the cap
of valve core. Then, connect the charge
hose. Remove the cap of valve head.
Connect the vacuum pump adapter to
the vacuum pump and connect the
charge hose to the adapter.

Fully tighten the “Hi” shuttle of the
manifold valve and completely unscrew
the “Lo” shuttle. Run the vacuum pump
for about 10–15 minutes, then completely
tighten the “Lo” shuttle and switch off
the vacuum pump.

Completely unscrew the spindle of the
service valve (at 2 places) in anti-
clockwise direction to allow the flow of
coolant (using Hexagonal Wrench key).

Remove the charge hose and tighten the
cap of valve head. Check the cap’s
periphery if there is any gas leakage.
The task is then completed.

2

3

4

1

Method to remove the low cover

Pull the cover at 

1

 and 

2

 in the directions as shown by arrows to

remove the cover.

Remote

Controller

Holder for
Remote Controller

Screw (2 pieces)

How to Remove The Front Cover

1

Remove the front panel.

Please remove and attach the front panel by
both hands.

After opening the front panel by both hands.

1

1

1

1

1

Undo the right arm while pushing it inside.

2

2

2

2

2

Slide the front panel to right as shown in figure.
Then remove while pulling it to front.

2

Remove the filters.

3

After removing two screws, pull the center of
the front cover towards you and release the
claws.

4

Pull the side faces (lower sections) of the front
cover towards you as shown in the figure and
remove the cover.

How to Attach the Front Cover

1

Check that the drain pan is securely attached.

2

After installing the front cover onto the unit, hook
three claws at upper side of the cover securely.
Then, push the center of the front cover to lock the
claws.

3

Tighten the two screws.

4

Install the filter.

5

Slide the shafts of the right and left arms on the
washable panel along the steps to insert the shafts
into the holes till they stop. After checking that the
shafts are securely inserted, close the panel.

Step

Shaft

Hole

!

CAUTION

Note:

Outdoor supply cords shall not be
lighter than polychloroprene sheathed
flexible cord, 60245 IEC 57.

IMPORTANT

20A time delay fuse

Fuse Capacity

Отзывы: