background image

Gas Leakage Inspection

Please use gas leakage detector to check if leakage occurs 
at the connection of Flare nut as shown on the right.

If gas leakage occurs, further tighten the connection to stop 
leakage.

<

IA1104: B 

>

   Preparation of Pipe

1

 Use a pipe cutter to cut the copper pipe.

 Jagged edge will cause leakage.

 Point the side to be trimmed downwards during trimming to prevent copper 

chips from entering the pipe.

 Before 

fl

 aring, please put on the 

fl

 are  nut.

   Pipe Connection

2

INST

ALLA

TION OF REFRIGERA

TING PIPES 

AND 

AIR REMOV

AL

CAUTION

!

WARNING

 If you cannot attach the side plate due to the connecting 

cord, press the connecting cord in direction to the front 
panel to 

fi

 x  it.

 Be sure that the hooks of the side plate is 

fi

 xed in certainly. 

Otherwise water leakage may occur and this causes short 
circuit or faults.

Checking for the electric source and the 
voltage range

  Before installation, the power source must be checked and necessary wiring work 

must be completed. To make the wiring capacity proper, use the wire gauges list 
below for the lead-in from a pole transformer and for the wiring from a switch 
board of fuse box to the outlet in consideration of the locked rotor current.

 Investigate the power supply capacity and other electrical 

conditions at the installation location.

  Depending on the model of room air conditioner to be installed, 

request the customer to make arrangements for the necessary 
electrical work etc.

  The electrical work includes the wiring work up the outlet. 

In localities where electrical conditions are poor, use of a 
voltage regulator is recommended.

 Install outlet for the room air conditioner within the reaching 

range of the line cord.

 THIS APPLIANCE MUST BE EARTHED.

Procedures of Wiring

Wiring Of The Outdoor Unit

 Please remove the side plate for wire connection.

!

WARNING

!

CONNECTION OF POWER CORD

WARNING

!

Power supply shall be connected at the rated voltage, otherwise the unit will be 
broken or could not reach the speci

fi

 ed  capacity.

Detail of cutting the connecting cord

To remove the connecting wires for 
the indoor unit, please remove the 
low cover panel in front of the unit.

Earth terminal

Wiring Of The Indoor Unit

  For wire connection of the Indoor unit, you need to remove front panel and 

electrical cover.

Method to remove front panel

  Please refer to Instruction Manual – “Removing the Front Panel” under “Cleaning 

of Front Panel”.

 The naked part of the wire core should be 10 mm and 

fi

 xed to the terminal tightly. Then try 

to pull the individual wire to check if the contact is tight. Improper insertion may burn the 
terminal.

 Be sure to use only power cables approved from the authorities in your country. For example 

in Germany: Cable type: NYM 3x1.5mm

2

, (fuse = 16A time delay)

 Please refer to the following for wire connection to the terminals of the units. The cabling 

must meet the standards of electrical installation.

 There is a AC voltage of 220~230V between the L and N terminals. Therefore, before 

servicing, be sure to remove the plug from the AC outlet or switch off the main switch.

IMPORTANT

15A time delay fuse

Fuse Capacity

Removal Of Air From The Pipe And Gas Leakage Inspection

3

Procedures of using Vacuum Pump for Air Removal

AIR REMOV

AL

When the meter reaches - 101kPa (-76cmHg) 
during pumping, fully tighten the shuttle.

Lo

Hi

Meter showing pressure

Closed

Manifold valve

Vacuum 
pump

Valve

Charge hose

Valve

When pumping starts, slightly loosen the 

fl

 are nut to check of air sucked in. Then 

tighten the 

fl

 are  nut.

As shown in right 

fi

 gure, remove the cap of 

valve core. Then, connect the charge hose. 
Remove the cap of valve head. Connect the 
vacuum pump adapter to the vacuum pump 
and connect the charge hose to the adapter.

Fully tighten the “Hi” knob of the manifold 
valve and completely unscrew the “Lo” knob. 
Run the vacuum pump for about 10~15 
minutes, then completely tighten the “Lo” knob 
and switch off the vacuum pump.

2

Completely unscrew the spindle of the 
service valve (at 2 places) in anti-clockwise 
direction to allow the 

fl

 ow of refrigerant (using 

Hexagonal Wrench key).

Re-cap the service valve and tighten using 
wrench. Check the cap’s periphery if there is 
any gas leakage. The task is then completed.

Remove the charge hose and tighten the cap 
of valve core. Check the cap’s periphery if 
there is any gas leakage. 

4

5

1

3

OUTDOOR UNIT

 Please mount the Outdoor unit on stable ground to prevent 

vibration and increase of noise level.

 Decide the location for piping after sorting out the different 

types of pipe available.

  When removing side cover, please pull the handle after undoing 

the hook by pulling it downward.

Please face this side (suction side) 
of the unit to the wall.

Please remove side cover 
when connecting the piping 
and connecting cord.

Please make sure to remove all spacers inside the unit.

 Open the Top, Back, Side cover and Cabinet of the unit.

 Pull out the spacers inside.

  (Spacers are only for transportation purpose).
  If not remove, vibration and noise will occur.

!

Top cover

CAUTION

Back cover

Side cover

CAUTION

!

In case of removing 

fl

 are nut of an Indoor unit, 

fi

 rst remove the nut 

of small diameter side, or a seal cap of bigger diameter side will 
burst out. Prevent water from entering into the piping when working.

B

A

!

CAUTION

Note:

 Outdoor supply cords shall not be lighter than polychloroprene sheathed 

fl

 exible cord, 60245 IEC 57.

Pull downward

Vacuum 
pump
adapter

Method to remove electrical cover

 

Remove the screw and electrical cover.

 

Insert the connecting cord (A, B) from the back of unit.

 

Fixed the wire to terminal wires 

fi

 rmly as shown in 

fi

 gure.

Electrical cover

Connecting cord

Screw

Connect the earth cord

After remove the screw 
and band, put the 
connecting cords and 

fi

 x the band with screw.

FINAL

 ST

AGE OF INST

ALLA

TION

  Insulation And Maintenance Of Pipe Connection

1

 The connected terminals should be completed sealed with heat 

insulator and then tied up with rubber strap.

 Please tie the pipe and power line together with vinyl tape as 

shown in the 

fi

 gure showing the installation of indoor and outdoor 

units. Then 

fi

 x their position with holders.

  To enhance the heat insulation and to prevent water condensation, 

please cover the outdoor part of the drain hose and pipe with 
insulation pipe.

 Completely seal any gap with putty.

  Installation Of Remote Controller

2

 The remote controller can be placed in its holder which is 

fi

 xed 

on wall or beam.

 To operate the remote controller at its holder, please ensure 

that the unit can receive signal transmitted from the controller 
at the place where the holder is to be 

fi

 xed. The unit will beep 

when signal is received from the remote controller. The signal 
transmission is weaken by the 

fl

 orescent light. Therefore, during 

the installation of the remote control holder, please switch on the 
light, even during day time, to determine the mounting location 
of the holder.

The controller should 
be insert from top into 
bottom side of the 
holder as shown in 

fi

 gure  beside.

  How to check pipe bending.

  –  Compare bended pipe with the picture below.
  –  If bended pipe is not good enough, cut bended 

area and bend it again.

  a  all areas are smooth, no notching area
  b  no scratch or mark inside
  c  all have the same length
  d  phase of bending is too long
 e slanting
  f  there are scratches around bending area
 g crack
 h different 

length

  i  sample of bending pipe cannot be used

Proper Pump Down Method

1

  Operate air conditioner 

at cooling mode for 
10~15 minutes

2

  After 10~15 minutes of 

pre operation, close 2s 
valve. After 3 minutes, 
close 4s valve.

3

  Take out air conditioner unit.

4

  Install New Refrigerant 

air conditioner

Most Important Process

Purpose: To make the 
oil & refrigerant mix 
together. They are in 
separated condition when 
air conditioner is 
stopped.

Mixed 
refrigerant 
& oil will be 
collected into 
outdoor unit.

It is advisable to 

fl

 ush 

the piping with R-22 to 
avoid any contamination 
remain before new 
installation. 

Outer

Diameter (ø)

6.35 (1/4")

12.7 (1/2")

Imperial 

fl

 aring  tool

0.8 ~ 1.5

1.0 ~ 2.0

Rigid 

fl

 aring  tool

0 ~ 0.5

0 ~ 1.0

A (mm)

Outer

diameter

of pipe

6.35 (1/4")

12.7 (1/2")

Valve head cap

Valve core cap

Torque N.m

(kgf 

 cm)

13.7 ~ 18.6 (140 ~ 190)

44.1 ~ 53.8 (450 ~ 550)

19.6 ~ 24.5 (200 ~ 250)

12.3 ~ 15.7 (125 ~ 160)

Small diameter

side

Big diameter

side

  Power Source And Operation Test

3

Power Source

CAUTION

!

 Please use a new socket. Accident may occur due 

to the use of old socket because of poor contact.

 Please plug in and then remove the plug for 2 – 3 

times. This is to ensure that the plug is completely 
plugged into the socket.

 Keep additional length for the power cord and do 

not render the plug under external force as this may 
cause poor contact.

 Do not 

fi

 x the power cord with U-shape nail.

Operation Test

 Please ensure that the air conditioner is in normal 

operating condition during the operation test.

  Explain to your customer the proper operation procedures 

as described in the user’s manual.

INS RAS-S13CDT-V13CDT (EN2)   1

INS RAS-S13CDT-V13CDT (EN2)   1

5/20/14   2:14 PM

5/20/14   2:14 PM

Отзывы: