Hitachi RAC-S13CDT Скачать руководство пользователя страница 2

Gas Leakage Inspection

Please use gas leakage detector to check if 
leakage occurs at the connection of Flare nut 
as shown on the right.

If gas leakage occurs, further tighten the 
connection to stop leakage.

FINAL

 ST

AGE OF INST

ALLA

TION

  Installation Of Remote Controller

2

 The remote controller can be placed in its holder which is 

fi

 xed on wall or beam.

 To operate the remote controller at its holder, please ensure 

that the unit can receive signal transmitted from the controller 
at the place where the holder is to be 

fi

 xed. The unit will beep 

when signal is received from the remote controller. The signal 
transmission is weaken by the 

fl

 uorescent  light.  Therefore, 

during the installation of the remote control holder, please 
switch on the light, even during day time, to determine the 
mounting location of the holder.

<

IA1128: A 

>

The controller must 
be hooked onto the 
hook at the lower 
part of the holder. 
Push in the remote 
controller in the 
direction as shown 
in 

fi

 gure  below.

   Preparation of Pipe

1

 Use a pipe cutter to cut the copper pipe.

 Jagged edge will cause leakage.

 Point the side to be trimmed downwards during trimming to prevent copper 

chips from entering the pipe.

 Before 

fl

 aring, please put on the 

fl

 are  nut.

   Pipe Connection

2

INST

ALLA

TION OF REFRIGERA

TING PIPES 

AND 

AIR REMOV

AL

CAUTION

!

WARNING

 If you cannot attach the side cover due to the connecting 

cord, press the connecting cord in direction to the front 
panel to 

fi

 x  it.

  Be sure that the hooks of the side cover is 

fi

 xed in certainly. 

Otherwise water penetration may occur and this causes 
short circuit or faults.

  The connecting cord should not touch to service valve and 

pipes. (It becomes high temperature in heating operation.)

 The naked part of the wire core should be 10 mm and 

fi

 x it to the terminal tightly. Then try to pull the 

individual wire to check if the contact is tight. Improper insertion may burn the terminal.

  Be sure to use only power cables approved from the authorities in your country. For example in Germany: 

Cable type: NYM 3x1.5mm

2

, (fuse = 16A time delay)

 Please refer to the installation manual for wire connection to the terminals of the units. The cabling must 

meet the standards of electrical installation.

 There is a AC voltage of 220V between the L and N terminals. Therefore, before servicing, be sure to 

remove the plug from the AC outlet or switch off the main switch.

Checking for the electric source and the 
voltage range

 Before installation, the power source must be checked and necessary wiring 

work must be completed. To make the wiring capacity proper, use the wire 
gauges list below for the lead-in from a pole transformer and for the wiring from 
a switch board of fuse box to the main switch and outdoor unit in consideration 
of the locked rotor current.

 Investigate the power supply capacity and other electrical 

conditions at the installation location.

  Depending on the model of room air conditioner to be installed, 

request the customer to make arrangements for the necessary 
electrical work etc.

  The electrical work includes the wiring work up the outdoor. In 

localities where electrical conditions are poor, use of a voltage 
regulation is recommended.

 IMPORTANT

 

 THIS APPLIANCE MUST BE EARTHED.

Procedures of Wiring

Wiring of The Outdoor Unit

 Please remove the side cover for wire connection.

!

WARNING

!

CONNECTION OF POWER CORD

 Please be careful when bending the copper pipe.

 Screw in manually while adjusting the center. After that, use of torque wrench to 

tighten the connection.

WARNING

!

In case that power is supplied from Indoor Unit

 Please use exclusive 

tool

CAUTION

!

In case of removing 

fl

 are nut of an Indoor unit, 

fi

 rst remove a nut 

of small diameter side, or a seal cap of big diameter side will 

fl

 y 

out. Prevent water from entering into the piping when working.

Power line

Indoor Unit

Outdoor Unit

GRN + YEL

GRN + YEL

Strip wires

Fuse Capacity

20A time delay fuse

How to Attach the Front Cover

 1  After covering the front cover to the unit, certainly hook 

at the upper portion (four places). Then, check that the 
drain pan is certainly attached. Push the front cover in 
the direction of arrow at the

  

portion of hooks.

 2  Hook the front cover at lower portion to the drain pan and 

then 

fi

 x them by screws and attach the caps.

 3  Connect the wire connector, 

fi

 xed the screw and electrical 

cover.

 4  Attach the front panel.

 

Certainly insert the left shaft of the front panel to the hole 
of the front cover. Next insert the right shaft as same as 
the left.

 5  Attach  the 

fi

 lters which are placed the surface written 

“FRONT” up.

 After 

attaching 

the 

fi

 lters, push the front panel at three 

arrow portion as shown in 

fi

 gure and close it.

Hole

Guide

Shaft

Wiring Of The Indoor Unit

  For wire connection of the Indoor unit, you need to remove front panel and 

electrical cover.

Method to remove front panel

  Refer to “FINAL STAGE OF INSTALLATION – How to Remove The Front Cover”.

Method to remove electrical cover

 

Remove the screw and electrical cover.

 

Insert the connecting cord (A, B) from the bottom of unit.

 

Fixed the wire to terminal wires 

fi

 rmly as shown in 

fi

 gure at right side.

Screw

Electrical cover

Screw

How to Remove The Front Cover

 1  Open the front panel.

 

Please remove and attach the 

  

front panel by both hands.

 

After opening the front panel by both hands.

 1  Undo the right arm while pushing it inside.
 2  Slide the front panel to right as shown in 

fi

 gure.  Then 

remove while pulling it to front.

 3  Remove the screw and electrical cover.

 2  Remove the 

fi

 lters.

 3  Remove the caps and screws 
  

at the lower portion of the 

  

front cover.

 4  Pull the front cover upward as far 
  

as the location where the lower 

  

portion of the front cover is on 

  

the de

fl

 ector.

 5  Remove while pulling the front 
  

cover in direction to arrow as 

  

shown in 

fi

 gure to hold the both 

  

sides of front cover.

Cap

Screw

Lower portion of front cover

De

fl

 ector

Removal Of Air From The Pipe And Gas Leakage Inspection

3

AIR REMOV

AL

A B

Earth terminal

Procedures of using Vacuum Pump for Air Removal

 How to check pipe bending.

  –  Compare bended pipe with the picture below.
  –  If bended pipe is not good enough, cut bended area 

and bend it again.

  a  all areas are smooth, no notching area

  b  no scratch or mark inside

  c  all have the same length

  d  phase of bending is too long

 e  slanting

  f 

there are scratches around bending area

 g  crack

 h  different 

length

  i 

sample of bending pipe cannot be used

CAUTION

Note:

 Outdoor supply cords shall not 

be lighter than polychloroprene 
sheathed 

fl

 exible cord with code 

designation 60245 IEC 57.

!

Insulation And Maintenance Of Pipe Connection

1

 The connected terminals should be completely sealed with 

heat insulator and then tied up with rubber strap.

 Please tie the pipe and power line together with vinyl tape 

as shown in the 

fi

 gure showing the installation of Indoor and 

Outdoor units. Then 

fi

 x their position with holders.

 To enchance the heat insulation and to prevent water 

condensation, please cover the outdoor part of the drain hose 
and pipe with insulation pipe.

 Completely seal any gap with putty.

  Power Source And Operation Test

3

Power Source

CAUTION

!

 Please use a new socket. Accident may occur due to the 

use of old socket because of poor contact.

 Please plug in and then remove the plug for 2 – 3 times. 

This is to ensure that the plug is completely plugged into 
the socket.

 Keep additional length for the power cord and do not 

render the plug under external force as this may cause 
poor contact.

 Do not 

fi

 x the power cord with U-shape nail.

Operation Test

  Please ensure that the air conditioner is in normal operating 

condition during the operation test.

 Explain to your customer the proper operation procedures 

as described in the user’s manual.

Connect the
earth cord

After remove the screw 
and band, put the 
connecting cords and 

fi

 x 

the band with screw.

As shown in right 

fi

 gure, remove the cap of 

valve core. Then, connect the charge hose. 
Remove the cap of valve head. Connect the 
vacuum pump adapter to the vacuum pump 
and connect the charge hose to the adapter.

Fully tighten the “Hi” knob of the manifold 
valve and completely unscrew the “Lo” knob. 
Run the vacuum pump for about 10~15 
minutes, then completely tighten the “Lo” knob 
and switch off the vacuum pump.

2

Completely unscrew the spindle of the 
service valve (at 2 places) in anti-clockwise 
direction to allow the 

fl

 ow of refrigerant (using 

Hexagonal Wrench key).

Re-cap the service valve and tighten using 
wrench. Check the cap’s periphery if there is 
any gas leakage. The task is then completed.

Remove the charge hose and tighten the cap 
of valve core. Check the cap’s periphery if 
there is any gas leakage. 

4

5

1

3

OUTDOOR UNIT

 Please mount the Outdoor unit on stable ground to prevent vibration and 

increase of noise level.

 Decide the location for piping after sorting out the different types of pipe 

available.

 When removing side cover, please pull the handle after undoing the hook 

by pulling it downward.

Please face this side (suction 
side) of the unit to the wall.

Please remove side cover 
when connecting the piping 
and connecting cord.

Pull downward

Please make sure to remove all spacers inside the unit.

 Open the Top, Back, Side cover and Cabinet of the unit.

 Pull out the spacers inside.

  (Spacers are only for transportation purpose).
  If not remove, vibration and noise will occur.

Side cover

Back cover

!

Top cover

Outer
Diameter (mm)

6.35

12.7

Imperial 

fl

 aring  tool

0.8 

~

 1.5mm

1.0 

~

 2.0mm

Rigid 

fl

 aring  tool

A (mm)

~

 0.5mm

~

 1.0mm

Outer

dia.of pipe

6.35 (1/4")

12.7 (1/2")

6.35 (1/4")

12.7 (1/2")

Valve 

head cap

Torque N·m

(kgf 

·

 cm)

13.7 – 18.6 (140 – 190)

44.1 – 53.9 (450 – 550)

19.0 – 21.0 (194 ~ 214)

24.0 – 26.0 (245 ~ 265)

9.0 (92)

Small dia. side

Large dia. side

Valve core cap

Small dia. side

Large dia. side

Top cover

Cabinet

CAUTION

(EN2) INS RAS-RAC-S18CDT   1

(EN2) INS RAS-RAC-S18CDT   1

1/6/14   4:24 PM

1/6/14   4:24 PM

Отзывы: