
Gas Leakage Inspection
Please use gas leakage detector to check if
leakage occurs at the connection of Flare nut
as shown on the right.
If gas leakage occurs, further tighten the
connection to stop leakage.
FINAL
ST
AGE OF INST
ALLA
TION
Installation Of Remote Controller
2
●
The remote controller can be placed in its holder which is
fi
xed on wall or beam.
●
To operate the remote controller at its holder, please ensure
that the unit can receive signal transmitted from the controller
at the place where the holder is to be
fi
xed. The unit will beep
when signal is received from the remote controller. The signal
transmission is weaken by the
fl
uorescent light. Therefore,
during the installation of the remote control holder, please
switch on the light, even during day time, to determine the
mounting location of the holder.
<
IA1128: A
>
The controller must
be hooked onto the
hook at the lower
part of the holder.
Push in the remote
controller in the
direction as shown
in
fi
gure below.
Preparation of Pipe
1
●
Use a pipe cutter to cut the copper pipe.
●
Jagged edge will cause leakage.
●
Point the side to be trimmed downwards during trimming to prevent copper
chips from entering the pipe.
●
Before
fl
aring, please put on the
fl
are nut.
Pipe Connection
2
INST
ALLA
TION OF REFRIGERA
TING PIPES
AND
AIR REMOV
AL
CAUTION
!
WARNING
●
If you cannot attach the side cover due to the connecting
cord, press the connecting cord in direction to the front
panel to
fi
x it.
●
Be sure that the hooks of the side cover is
fi
xed in certainly.
Otherwise water penetration may occur and this causes
short circuit or faults.
●
The connecting cord should not touch to service valve and
pipes. (It becomes high temperature in heating operation.)
●
The naked part of the wire core should be 10 mm and
fi
x it to the terminal tightly. Then try to pull the
individual wire to check if the contact is tight. Improper insertion may burn the terminal.
●
Be sure to use only power cables approved from the authorities in your country. For example in Germany:
Cable type: NYM 3x1.5mm
2
, (fuse = 16A time delay)
●
Please refer to the installation manual for wire connection to the terminals of the units. The cabling must
meet the standards of electrical installation.
●
There is a AC voltage of 220V between the L and N terminals. Therefore, before servicing, be sure to
remove the plug from the AC outlet or switch off the main switch.
Checking for the electric source and the
voltage range
●
Before installation, the power source must be checked and necessary wiring
work must be completed. To make the wiring capacity proper, use the wire
gauges list below for the lead-in from a pole transformer and for the wiring from
a switch board of fuse box to the main switch and outdoor unit in consideration
of the locked rotor current.
●
Investigate the power supply capacity and other electrical
conditions at the installation location.
Depending on the model of room air conditioner to be installed,
request the customer to make arrangements for the necessary
electrical work etc.
The electrical work includes the wiring work up the outdoor. In
localities where electrical conditions are poor, use of a voltage
regulation is recommended.
IMPORTANT
●
THIS APPLIANCE MUST BE EARTHED.
Procedures of Wiring
Wiring of The Outdoor Unit
●
Please remove the side cover for wire connection.
!
WARNING
!
CONNECTION OF POWER CORD
●
Please be careful when bending the copper pipe.
●
Screw in manually while adjusting the center. After that, use of torque wrench to
tighten the connection.
WARNING
!
In case that power is supplied from Indoor Unit
●
Please use exclusive
tool
CAUTION
!
In case of removing
fl
are nut of an Indoor unit,
fi
rst remove a nut
of small diameter side, or a seal cap of big diameter side will
fl
y
out. Prevent water from entering into the piping when working.
Power line
Indoor Unit
Outdoor Unit
GRN + YEL
GRN + YEL
Strip wires
Fuse Capacity
20A time delay fuse
How to Attach the Front Cover
1 After covering the front cover to the unit, certainly hook
at the upper portion (four places). Then, check that the
drain pan is certainly attached. Push the front cover in
the direction of arrow at the
portion of hooks.
2 Hook the front cover at lower portion to the drain pan and
then
fi
x them by screws and attach the caps.
3 Connect the wire connector,
fi
xed the screw and electrical
cover.
4 Attach the front panel.
●
Certainly insert the left shaft of the front panel to the hole
of the front cover. Next insert the right shaft as same as
the left.
5 Attach the
fi
lters which are placed the surface written
“FRONT” up.
●
After
attaching
the
fi
lters, push the front panel at three
arrow portion as shown in
fi
gure and close it.
Hole
Guide
Shaft
Wiring Of The Indoor Unit
●
For wire connection of the Indoor unit, you need to remove front panel and
electrical cover.
Method to remove front panel
●
Refer to “FINAL STAGE OF INSTALLATION – How to Remove The Front Cover”.
Method to remove electrical cover
●
Remove the screw and electrical cover.
●
Insert the connecting cord (A, B) from the bottom of unit.
●
Fixed the wire to terminal wires
fi
rmly as shown in
fi
gure at right side.
Screw
Electrical cover
Screw
How to Remove The Front Cover
1 Open the front panel.
●
Please remove and attach the
front panel by both hands.
●
After opening the front panel by both hands.
1 Undo the right arm while pushing it inside.
2 Slide the front panel to right as shown in
fi
gure. Then
remove while pulling it to front.
3 Remove the screw and electrical cover.
2 Remove the
fi
lters.
3 Remove the caps and screws
at the lower portion of the
front cover.
4 Pull the front cover upward as far
as the location where the lower
portion of the front cover is on
the de
fl
ector.
5 Remove while pulling the front
cover in direction to arrow as
shown in
fi
gure to hold the both
sides of front cover.
Cap
Screw
Lower portion of front cover
De
fl
ector
Removal Of Air From The Pipe And Gas Leakage Inspection
3
AIR REMOV
AL
A B
Earth terminal
Procedures of using Vacuum Pump for Air Removal
●
How to check pipe bending.
– Compare bended pipe with the picture below.
– If bended pipe is not good enough, cut bended area
and bend it again.
a all areas are smooth, no notching area
b no scratch or mark inside
c all have the same length
d phase of bending is too long
e slanting
f
there are scratches around bending area
g crack
h different
length
i
sample of bending pipe cannot be used
CAUTION
Note:
●
Outdoor supply cords shall not
be lighter than polychloroprene
sheathed
fl
exible cord with code
designation 60245 IEC 57.
!
Insulation And Maintenance Of Pipe Connection
1
●
The connected terminals should be completely sealed with
heat insulator and then tied up with rubber strap.
●
Please tie the pipe and power line together with vinyl tape
as shown in the
fi
gure showing the installation of Indoor and
Outdoor units. Then
fi
x their position with holders.
●
To enchance the heat insulation and to prevent water
condensation, please cover the outdoor part of the drain hose
and pipe with insulation pipe.
●
Completely seal any gap with putty.
Power Source And Operation Test
3
Power Source
CAUTION
!
●
Please use a new socket. Accident may occur due to the
use of old socket because of poor contact.
●
Please plug in and then remove the plug for 2 – 3 times.
This is to ensure that the plug is completely plugged into
the socket.
●
Keep additional length for the power cord and do not
render the plug under external force as this may cause
poor contact.
●
Do not
fi
x the power cord with U-shape nail.
Operation Test
●
Please ensure that the air conditioner is in normal operating
condition during the operation test.
●
Explain to your customer the proper operation procedures
as described in the user’s manual.
Connect the
earth cord
After remove the screw
and band, put the
connecting cords and
fi
x
the band with screw.
As shown in right
fi
gure, remove the cap of
valve core. Then, connect the charge hose.
Remove the cap of valve head. Connect the
vacuum pump adapter to the vacuum pump
and connect the charge hose to the adapter.
Fully tighten the “Hi” knob of the manifold
valve and completely unscrew the “Lo” knob.
Run the vacuum pump for about 10~15
minutes, then completely tighten the “Lo” knob
and switch off the vacuum pump.
2
Completely unscrew the spindle of the
service valve (at 2 places) in anti-clockwise
direction to allow the
fl
ow of refrigerant (using
Hexagonal Wrench key).
Re-cap the service valve and tighten using
wrench. Check the cap’s periphery if there is
any gas leakage. The task is then completed.
Remove the charge hose and tighten the cap
of valve core. Check the cap’s periphery if
there is any gas leakage.
4
5
1
3
OUTDOOR UNIT
●
Please mount the Outdoor unit on stable ground to prevent vibration and
increase of noise level.
●
Decide the location for piping after sorting out the different types of pipe
available.
●
When removing side cover, please pull the handle after undoing the hook
by pulling it downward.
Please face this side (suction
side) of the unit to the wall.
Please remove side cover
when connecting the piping
and connecting cord.
Pull downward
Please make sure to remove all spacers inside the unit.
●
Open the Top, Back, Side cover and Cabinet of the unit.
●
Pull out the spacers inside.
(Spacers are only for transportation purpose).
If not remove, vibration and noise will occur.
Side cover
Back cover
!
Top cover
➤
Outer
Diameter (mm)
6.35
12.7
Imperial
fl
aring tool
0.8
~
1.5mm
1.0
~
2.0mm
Rigid
fl
aring tool
A (mm)
0
~
0.5mm
0
~
1.0mm
Outer
dia.of pipe
6.35 (1/4")
12.7 (1/2")
6.35 (1/4")
12.7 (1/2")
Valve
head cap
Torque N·m
(kgf
·
cm)
13.7 – 18.6 (140 – 190)
44.1 – 53.9 (450 – 550)
19.0 – 21.0 (194 ~ 214)
24.0 – 26.0 (245 ~ 265)
9.0 (92)
Small dia. side
Large dia. side
Valve core cap
Small dia. side
Large dia. side
Top cover
Cabinet
CAUTION
(EN2) INS RAS-RAC-S18CDT 1
(EN2) INS RAS-RAC-S18CDT 1
1/6/14 4:24 PM
1/6/14 4:24 PM