background image

<

IA1016: A 

>

FINAL

 ST

AGE OF INST

ALLA

TION

Insulation And Maintenance Of Pipe Connection

1

 The connected terminals should be completely sealed with 

heat insulator and then tied up with rubber strap.

 Please tie the pipe and power line together with vinyl tape 

as shown in the  gure showing the installation of Indoor and 
Outdoor units. Then  x their position with holders.

 To enchance the heat insulation and to prevent water 

condensation, please cover the outdoor part of the drain hose 
and pipe with insulation pipe.

 Completely seal any gap with putty.

  Installation Of Remote Controller

2

 The remote controller can be placed in its holder which is 

 xed on wall or beam.

 To operate the remote controller at its holder, please ensure 

that the unit can receive signal transmitted from the controller 
at the place where the holder is to be  xed. The unit will beep 
when signal is received from the remote controller. The signal 
transmission is weaken by the  uorescent  light.  Therefore, 
during the installation of the remote control holder, please 
switch on the light, even during day time, to determine the 
mounting location of the holder.

  Power Source And Operation Test

3

Power Source

CAUTION

!

 Please use a new socket. Accident may occur due to the 

use of old socket because of poor contact.

 Please plug in and then remove the plug for 2 – 3 times. 

This is to ensure that the plug is completely plugged into 
the socket.

 Keep additional length for the power cord and do not 

render the plug under external force as this may cause 
poor contact.

 Do not  x the power cord with U-shape nail.

Operation Test

 Please ensure that the air conditioner is in normal operating 

condition during the operation test.

 Explain to your customer the proper operation procedures 

as described in the user’s manual.

The controller should 
be insert from top into 
bottom side of the 
holder as shown in 
 gure  beside.

OUTDOOR UNIT

 Please mount the Outdoor unit on stable ground to prevent vibration 

and increase of noise level.

 Decide the location for piping after sorting out the different types of 

pipe available.

 Open the side plate by unscrewing the screws as shown below.

Removal Of Air From The Pipe And Gas Leakage Inspection

Gas Leakage Inspection

Please use gas leakage detector to check if leakage 
occurs at the connection of Flare nut as shown on 
the right.

If gas leakage occurs, further tighten the connection 
to stop leakage. 

3

Procedures of using Vacuum Pump for Air Removal

As shown in right  gure, remove the cap 
of valve core. Then, connect the charge 
hose. Remove the cap of valve head. 
Connect the vacuum pump adapter to the 
vacuum pump and connect the charge 
hose to the adapter.

Fully tighten the “Hi” shuttle of the 
manifold valve and completely unscrew 
the “Lo” shuttle. Run the vacuum pump 
for about 10–15 minutes, then completely 
tighten the “Lo” shuttle and switch off the 
vacuum pump.

2

Completely unscrew the spindle of 
the service valve (at 2 places) in anti-
clockwise direction to allow the  ow  of 
coolant (using Hexagonal Wrench key).

3

Remove the charge hose and tighten 
the cap of valve head. Check the cap’s 
periphery if there is any gas leakage. 
The task is then completed.

4

1

   Preparation of Pipe

   Pipe Connection

2

INST

ALLA

TION OF REFRIGERA

TING PIPES 

AND 

AIR REMOV

AL

AIR REMOV

AL

In case of removing  are nut of an Indoor unit,  rst remove a nut 
of small diameter side, or a seal cap of big diameter side will  y 
out. Prevent water from entering into the piping when working.

When the meter reaches - 101KPa 
(-76cmHg) during pumping, fully 
tighten the shuttle.

When pumping starts, slightly loosen the 
 are nut to check of air sucked in. Then 
tighten the  are  nut.

1

Outer

dia.of pipe

6.35 (1/4")

9.52 (3/8")

6.35 (1/4")

9.52 (3/8")

Valve 

head cap

Torque N·m

(kgf 

·

 cm)

13.7 – 18.6 (140 – 190)

34.3 – 44.1 (350 – 450)

19.6 – 24.5 (200 ~ 250)

19.6 – 24.5 (200 ~ 250)

12.3 – 15.7 (125 ~ 160)

Small dia. side

Large dia. side

Valve core cap

Small dia. side

Large dia. side

CAUTION

CAUTION

Manifold valve

Vacuum 
pump

Valve

Charge hose

Valve

Vacuum pump
adapter

Meter showing pressure

!

!

WARNING

 If you cannot attach the side plate due to the connecting 

cord, please press the connecting cord in direction to the 
front panel to  x it.

  Be sure that the hooks of the side plate is  xed in certainly. 

Otherwise water leakage may occur and this causes short 
circuit or faults.

 The naked part of the wire core should be 10 mm and  x it to the terminal tightly. Then try to 

pull the individual wire to check if the contact is tight. Improper insertion may burn the terminal.

 Be sure to use only power cables approved from the authorities in your country. For example 

in Germany: Cable type: NYM 3x1.5mm

2

.

 Please refer to the installation manual for wire connection to the terminals of the units. The 

cabling must meet the standards of electrical installation.

 There is a AC voltage of 220-230V between the L and N terminals. Therefore, before servicing, 

be sure to remove the plug from the AC outlet or switch off the main switch.

 Do not make any connection in the middle of the connecting cable. It may cause the wire over 

heated, emit smoke and  re.

 Investigate the power supply capacity and other electrical conditions 

at the installation location.

  Depending on the model of room air conditioner to be installed, 

request the customer to make arrangements for the necessary 
electrical work etc.

  The electrical work includes the wiring work up the outdoor. In localities 

where electrical conditions are poor, use of a voltage regulation is 
recommended.

 Install outlet for the room air conditioner within the reaching range 

of the line cord.

 THIS APPLIANCE MUST BE EARTHED.

Procedures of Wiring

Wiring of The Outdoor Unit

 Please remove the side plate for wire connection.

!

WARNING

!

CONNECTION OF POWER CORD

WARNING

Power supply shall be connected at the rated voltage, otherwise the unit will be 
broken or could not reach the speci ed capacity.

Detail of cutting the connecting cord

When removing the connecting wires for the Indoor unit, please remove the low cover panel in 
front of the unit.

Fuse Capacity

10A time delay fuse

Connect the earth cord

After remove the screw 
and band, put the 
connecting cords and  x 
the band with screw.

Wiring Of The Indoor Unit

  For wire connection of the Indoor unit, you need to open or remove front panel 

and electrical cover.

Method to remove front panel

  Please refer to Instruction Manual – “Removing the Front Panel” under “Cleaning 

of Front Panel”.

Method to remove electrical cover

  Remove the screw and electrical cover.

  Insert the connecting cord (A, B) from the back of unit.

  Fixed the wire to terminal wires  rmly as shown in  gure at right side.

IMPORTANT

Electrical cover

Connecting cord

Screw

!

Connecting cord

Outdoor Unit

Indoor Unit

Strip wires

GRN + YEL

 Use a pipe cutter to cut the copper pipe.

 Jagged edge will cause leakage.

 Point the side to be trimmed downwards during trimming to prevent copper 

chips from entering the pipe.

 Before  aring, please put on the hexagon screw cap.

Outer

Diameter (ø)

6.35 (1/4")

9.52 (3/8")

Imperial  aring tool

0.8 – 1.5

1.0 – 2.0

Rigid  aring tool

0 – 0.5

0 – 1.0

A (mm)

GRN + YEL

INS RAS-S10CC-5115CC (EN2)   1

2/26/13   4:23 PM

Отзывы: