
OUTDOOR UNIT
●
Please mount the outdoor
unit on stable ground to
prevent vibration and
increase of noise level.
●
Decide the location for piping
after sorting out the different
types of pipe available.
●
Open the side plate by
unscrewing the screws as
shown below.
Removal Of Air From The Pipe And Gas Leakage Inspection
Gas Leakage Inspection
Please use gas leakage detector to check if leakage
occurs at the connection of Flare nut as shown on
the right.
If gas leakage occurs, further tighten the connection
to stop leakage.
3
Procedures of using Vacuum Pump for Air Removal
As shown in right figure, remove the cap
of valve core. Then, connect the charge
hose. Remove the cap of valve head.
Connect the vacuum pump adapter to
the vacuum pump and connect the
charge hose to the adapter.
Fully tighten the “Hi” shuttle of the
manifold valve and completely unscrew
the “Lo” shuttle. Run the vacuum pump
for about 10–15 minutes, then completely
tighten the “Lo” shuttle and switch off
the vacuum pump.
2
Completely unscrew the spindle of the
service valve (at 2 places) in anti-
clockwise direction to allow the flow of
coolant (using Hexagonal Wrench key).
3
Remove the Charge hose and tighten
the cap of valve head. Check the cap’s
periphery if there is any gas leakage.
The task is then completed.
4
1
Preparation of Pipe
1
●
Use a pipe cutter to cut the copper pipe.
●
Jagged edge will cause leakage.
●
Point the side to be trimmed downwards during trimming to prevent copper
chips from entering the pipe.
●
Before flaring, please put on the flare nut.
Pipe Connection
2
INST
ALLA
TION OF REFRIGERA
TING PIPES AND AIR REMO
VA
L
CAUTION
!
Copper pipe
Trimming tool
Outer
Diameter (mm)
6.35
12.7
15.8
Imperial flaring tool
0.8 – 1.5mm
1.0 – 2.0mm
1.0 – 2.0mm
Rigid flaring tool
0 – 0.5mm
0 – 1.0mm
0 – 1.0mm
A (mm)
AIR REMO
V
A
L
●
If you cannot attach the side cover due to the connecting cord,
press the connecting cord in direction to the front panel to fix it.
●
Be sure that the hooks of the side cover is fixed in certainly.
Otherwise water leakage may occur and this causes short circuit
or faults.
●
The connecting cord should not touch to service valve and pipes.
(It becomes high temperature in heating operation.)
Checking for the electric source and the
voltage range
●
Before installation, the power source must be checked and necessary wiring work
must be completed. To make the proper wiring capacity, use the wire gauges
list below for the lead-in from a pole transformer and for the wiring from a switch board
of fuse box to the outlet in consideration of the locked rotor current.
●
Investigate the power supply capacity and other
electrical conditions at the installation location.
Depending on the model of room air conditioner
to be installed, request the customer to make
arrangements for the necessary electrical work etc.
The electrical work includes the wiring work up
the outlet. In localities where electrical conditions
are poor, use of a voltage regulation is
recommended.
IMPORTANT
Wiring Of The Outdoor Unit
●
Please remove the side cover for wire connection.
!
CONNECTION OF POWER CORD
A
Die
Die
Copper pipe
Wrench
Torque
wrench
Flare nut
Lo
Hi
Meter showing pressure
Manifold valve
Vacuum pump
Charge
hose
When pumping starts, slightly loosen
the flare nut to check of air sucked in.
Then tighten the flare nut.
When the meter reaches –101KPa (–76cmHg)
during pumping, fully tighten the shuttle.
The body of
service valve
Cap of
valve core
Hexagonal
Wrench Key
Cap of valve head
Cap of valve head
●
Please be careful when bending the copper pipe.
●
Screw in manually while adjusting the center. After that, use of torque wrench to
tighten the connection.
Please face this side
(suction side) of the
unit to the wall.
Please
remove
side cover
when
connecting
the piping
and
connecting
cord.
Pull
downward
Earth terminal
B
A
Wiring Of The Indoor Unit
●
For wire connection of the Indoor unit, you need to remove
electrical cover.
Method to remove electrical cover
CAUTION
!
Please make sure to remove
all spacers inside the unit.
●
Open the Top, Back and
Side cover of the unit.
●
Pull out the spacers inside.
(Spacers are only for
transportation purpose).
If not remove, vibration and
noise will occur.
Top cover
FINAL ST
A
GE OF INST
ALLA
TION
Insulation And Maintenance Of Pipe Connection
1
●
The connected terminals should be completed sealed with
heat insulator and then tied up with rubber strap.
●
Please tie the pipe and power line together with vinly tape as
shown in the figure showing the installation of Indoor and
Outdoor units. Then fix their position with holders.
●
To enchance the heat insulation and to prevent water
condensation, please cover the outdoor part of the drain hose
and pipe with insulation pipe.
●
Completely seal any gap with putty.
Power Source
CAUTION
!
●
Please use a new socket. Accident may occur due to the
use of old socket because of poor contact.
●
Please plug in and then remove the plug for 2 – 3 times.
This is to ensure that the plug is completely plugged into
the socket.
●
Keep additional length for the power cord and do not render
the plug under external force as this may cause poor
contact.
●
Do not fix the power cord with U-shape nail.
Insulation material for pipe connection
Sleeve of
protection pipe
Putty
Outer
dia.of pipe
6.35 (1/4")
12.7 (1/2”)
15.88 (5/8")
6.35 (1/4")
12.7 (1/2”)
15.88 (5/8")
Valve
head cap
Torque N·m
(kgf · cm)
13.7 – 18.6 (140 – 190)
44.1 – 53.9 (450 – 550)
49 – 58.8 (500 – 600)
19.0 – 21.0 (194 ~ 214)
29.4 – 34.3 (300 – 350)
29.0 – 31.0 (296 ~ 316)
9.0 (92)
Small dia. side
Large dia. side
Small dia. side
Large dia. side
Cable length
up to 15m
up to 25m
Wire cross-section
2.5mm
2
4.0mm
2
IMPORTANT
Fuse Capacity
30A time delay fuse
WARNING
●
THIS APPLIANCE MUST BE EARTHED.
Procedures of Wiring
WARNING
!
Power is supplied from Outdoor Unit
L
N
D
C
B
A
D
C
B
A
Indoor Unit
Line Cord
Outdoor Unit
Connecting Cord
1.6 or 2.0
AC 220-240V
2.5
2.5
●
The naked part of the wire core should be 10 mm and fix it to the terminal tightly. Then try to pull the
individual wire to check if the contact is tight. Improper insertion may burn the terminal.
●
Be sure to use only power cables approved from the authorities in your country. For example in Germany:
Cable type: NYM 3x1.5mm
2
, (fuse = 30A time delay)
●
Please refer to the installation manual for wire connection to the terminals of the units. The cabling must
meet the standards of electrical installation.
●
There is a AC voltage of 220-240V between the L and N terminals. Therefore, before servicing, be sure
to remove the plug from the AC outlet or switch off the main switch.
●
Do not make any connection in the middle of the connecting cable. It may cause the wire over heated,
emit smoke and fire.
CONDENSED WATER DISPOSAL OF OUTDOOR UNIT
There are holes on the base of Outdoor unit for condensed water
to exhaust.
In order to flow condensed water to the drain, the unit is installed
on a stand or a block so that the unit is 100mm above the ground
as shown figure. Join the drain pipe to one hole.
At first insert one portion of the hook to the base (Portion A), then
pull the drain pipe in the direction shown by the arrow while inserting
the hook into the base. After installation, check whether the drain
pipe cling to the base firmly.
When using in cold region, etc.
In cold region with severe cold climate and heavy snow, water
discharged from heat exchanger freeze on the base surface and
this may affect drainage. In such a region, remove bush on the
bottom face of outdoor unit for better drainage. When using
drainpipe, consult our dealer.
Side cover
Back cover
BASE
DRAIN PIPE
A
DRAIN PIPE
BUSH
100 mm ABOVE
13
12
BUSH
11
C
D
●
Please use exclusive
tool
CAUTION
!
In case of removing flare nut of an indoor unit, first remove a nut
of small diameter side, or a seal cap of big diameter side will fly
out. Prevent water from entering into the piping when working.
Valve core cap
Power Source And Operation
Test
2
Power line
Control line
GRN + YEL
25mm
35mm
10mm
30mm
10mm
30mm
10mm
10mm
70mm
10mm
10mm
45mm
Indoor
Unit
GRN + YEL
Outdoor
Unit
Strip wires
WARNING
!
Insert and fix the
connecting cords
with screw.
(4 places)
Connecting
Cords.
A
B
C
D
Connect the earth wire.
(green and yellow wire)
After unscrew the band,
put the connecting cords
and fix again with screw.
(2 places)
65mm
60mm