![Hitachi MK-96RD617-08 Скачать руководство пользователя страница 139](http://html.mh-extra.com/html/hitachi/mk-96rd617-08/mk-96rd617-08_user-manual_145991139.webp)
Server Priority Manager Operation
6-7
Hitachi Universal Storage Platform V/VM Hitachi Performance Manager User’s Guide
The resulting definitions on the window are as follows:
Figure 6-5
Specifying Host Bus Adapters to be Monitored
For more detailed instruction, see Setting Priority for Ports on the Storage
System.
Server Priority Manager is unable to monitor and control the performance
of hosts whose host bus adapters are placed below the
Non-Monitor
icon.
3.
Set priority to host bus adapters using the
WWN
tab of the
Server
Priority Manager
window.
In
network B
, the production server is given high priority and the
development server is given low priority. If your network is configured as
in Figure 6-4, you must give high priority to wwn01 and also give low
priority to wwn02 and wwn03.
To give priority to the three host bus adapters, take the following steps:
a.
In the
WWN
tab, select one of the four ports that the HBAs are
connected to (i.e. ports 1A, 1C, 2A, and 2C).
b.
Set
Prio.
to wwn01. Also, set
Non-Prio.
to wwn02 and wwn03.
Figure 6-6
Priority Specified in the Server Priority Manager Window
Содержание MK-96RD617-08
Страница 6: ...vi Contents Hitachi Universal Storage Platform V VM Hitachi Performance Manager User s Guide ...
Страница 246: ...Index 2 Index Hitachi Universal Storage Platform V VM Hitachi Performance Manager User s Guide ...
Страница 247: ...Hitachi Universal Storage Platform V VM Hitachi Performance Manager User s Guide ...