E2-7-1
STANDARD MAINTENANCE
Service Schedule of Components
Notes:
1.Clean all parts for the tape transport (Upper Drum with Video Head / Pinch Roller / Audio Control Head / Full
Erase Head) using 90% lsopropyl Alcohol.
2.After cleaning the parts, do all DECK ADJUSTMENTS.
3.For the reference numbers listed above, refer to Deck Exploded Views.
* B73 ------ Recording Model only
h: Hours : Check
I
: Change
Deck
Periodic Service Schedule
Ref.No.
Part Name
1,000 h
2,000 h
3,000 h
4,000 h
B2
Cylinder Assembly
I
I
B3
Loading Motor Assembly
I
B8
Pulley Assembly
I
I
B27
Tension Lever Sub Assembly
I
I
B31
AC Head Assembly
I
B573,B574
Reel S, Reel T
I
B37
Capstan Motor
I
I
B52
Cap Belt
I
I
*B73
FE Head
I
B133
Idler Assembly
I
I
B410
Pinch Arm (A) Assembly
I
I
B414
M Brake S Assembly
I
I
B416
M Brake T Assembly
I
I
B525
LDG Belt
I
I
Содержание DVPF2E
Страница 45: ...E2 2 6 S 12 19 Cap Belt Fig DM11 Fig DM12 20 C 1 21 ...
Страница 69: ...4 1 4 Main 1 8 Schematic Diagram ...
Страница 71: ...4 1 6 Main 3 8 Schematic Diagram ...
Страница 72: ...4 1 7 Main 4 8 Schematic Diagram ...
Страница 73: ...4 1 8 Main 5 8 Schematic Diagram ...
Страница 74: ...4 1 9 Main 6 8 Schematic Diagram ...
Страница 76: ...4 1 11 Main 7 8 Schematic Diagram ...
Страница 77: ...4 1 12 Main 8 8 Schematic Diagram ...
Страница 81: ...4 1 16 AFV Schematic Diagram ...
Страница 83: ...4 1 18 Main CBA Bottom View ...
Страница 85: ...4 1 20 Function CBA Top View Function CBA Bottom View ...
Страница 86: ...4 1 21 Front Jack CBA Top View Front Jack CBA Bottom View ...
Страница 89: ...4 1 24 DVD Main 1 4 Schematic Diagram ...
Страница 90: ...4 1 25 DVD Main 2 4 Schematic Diagram ...
Страница 91: ...4 1 26 DVD Main 3 4 Schematic Diagram ...
Страница 92: ...4 1 27 DVD Main 4 4 Schematic Diagram ...