3-17
3-3 STANDARD MAINTENANCE
3-3-1 Service Schedule of Components
Notes:
1.Clean all parts for the tape transport (Upper Drum with Video Head / Pinch Roller / Audio Control Head / Full
Erase Head) using 90% lsopropyl Alcohol.
2.After cleaning the parts, do all DECK ADJUSTMENTS.
3.For the reference numbers listed above, refer to Deck Exploded Views.
* B73 ------ Recording Model only
h: Hours : Check
I
: Change
Deck
Periodic Service Schedule
Ref.No.
Part Name
1,000 h
2,000 h
3,000 h
4,000 h
B2
Cylinder Assembly
I
I
B3
Loading Motor Assembly
I
B8
Pulley Assembly
I
I
B587
Tension Lever Assembly
I
I
B31
AC Head Assembly
I
B573,B574
Reel (SP)(D2), Reel (TU)(D2)
I
B37
Capstan Motor
I
I
B52
Cap Belt
I
I
*B73
FE Head
I
B133,B134
Idler Gear, Idler Arm
I
I
B410
Pinch Arm Assembly
I
I
B414
M Brake (SP) Assembly
I
I
B416
M Brake (TU) Assembly
I
I
B525
LDG Belt
I
I
B569
(2 head only)
Cam Holder (F)
I
I
B593
(4 head,
4 head HiFi
only)
Cam Holder (F) Assembly
I
I
Содержание DV-PF33U
Страница 57: ...5 13 Fig DM16 41 42 43 L 13 44 45 Slide Fig DM17 ...
Страница 70: ...5 3 1 Main 1 8 Schematic Diagram 3 SCHEMATIC DIAGRAMS ...
Страница 72: ...7 3 3 Main 3 8 Schematic Diagram ...
Страница 73: ...8 3 4 Main 4 8 Schematic Diagram ...
Страница 74: ...9 3 5 Main 5 8 Schematic Diagram ...
Страница 75: ...10 3 6 Main 6 8 Schematic Diagram ...
Страница 76: ...11 3 7 Main 7 8 DVD OPEN CLOSE Schematic Diagrams ...
Страница 77: ...12 3 8 Main 8 8 Schematic Diagram ...
Страница 80: ...15 3 11 DVD Main 1 3 Schematic Diagram ...
Страница 81: ...16 3 12 DVD Main 2 3 Schematic Diagram ...
Страница 83: ...18 3 13 DVD Main 3 3 Schematic Diagram ...
Страница 86: ...21 5 2 Main CBA Bottom View ...