Electrostatic discharge precautions
To ensure proper handling of system components and to prevent hardware
faults caused by electrostatic discharge, follow all safety precautions:
• Wear an anti-static wrist or ankle strap.
• Observe all standard electrostatic discharge precautions when handling
plug-in modules or components that have been removed from any anti-
static packaging.
•
Avoid
contact with backplane components and module connectors.
Safety and handling precautions
To ensure your safety and the safe handling and correct operation of the
equipment, follow all of the safety precautions and instructions.
Caution:
Observe safe lifting practices. Each server or each storage array
can weigh 57 lb. (26 kg) or more. At least two people are required to handle
and position a server in a rack.
Caution:
There is a risk that a cabinet could fall over suddenly. To prevent
this from occurring:
• If your system comes with a rack stabilizer plate, install it.
• Fill all expansion cabinets, including all storage enclosures, from the
bottom to the top.
• Do
not
remove more than one unit from the rack at a time.
To help prevent serious injuries, load the components in the storage cabinet
in the prescribed order:
1.
If present, install the rack stabilizer plate to the front of the system
cabinet.
2.
Load the Fibre Channel (FC) switches in the storage cabinet at the
positions recommended in the
System Installation Guide
. The positions
can be adjusted according to a specific storage cabinet configuration.
3.
Load and position the server(s) directly above the FC switches, if used in
your configuration.
4.
The System Management Unit (SMU), if used in your configuration,
should be placed directly below the FC switches.
5.
The first storage enclosure should be positioned at the bottom of the
storage cabinet. Additional enclosures are then placed above existing
enclosures, going towards the top of the system cabinet.
6.
Once the bottom half of the storage cabinet has been filled, the top half
of the storage cabinet can be filled. Begin by placing a storage
component directly above the server and then fill upwards.
20
Safety information
Hitachi NAS Platform 3080 and 3090 G1 Hardware Reference
Содержание 3080 G1
Страница 1: ...Hitachi NAS Platform 3080 and 3090 G1 Hardware Reference Release 13 0 MK 92HNAS016 10 October 2016 ...
Страница 6: ...6 Hitachi NAS Platform 3080 and 3090 G1 Hardware Reference ...
Страница 11: ...Thank you Preface 11 Hitachi NAS Platform 3080 and 3090 G1 Hardware Reference ...
Страница 12: ...12 Preface Hitachi NAS Platform 3080 and 3090 G1 Hardware Reference ...
Страница 18: ...18 About this manual Hitachi NAS Platform 3080 and 3090 G1 Hardware Reference ...
Страница 27: ...Mandatory regulations 27 Hitachi NAS Platform 3080 and 3090 G1 Hardware Reference ...
Страница 28: ...28 Mandatory regulations Hitachi NAS Platform 3080 and 3090 G1 Hardware Reference ...
Страница 76: ...76 Rebooting shutting down and powering off Hitachi NAS Platform 3080 and 3090 G1 Hardware Reference ...
Страница 104: ...104 Hard disk replacement Hitachi NAS Platform 3080 and 3090 G1 Hardware Reference ...
Страница 132: ...132 Server replacement procedures Hitachi NAS Platform 3080 and 3090 G1 Hardware Reference ...
Страница 136: ...136 Parts list for 3080 3090 G1 servers Hitachi NAS Platform 3080 and 3090 G1 Hardware Reference ...
Страница 137: ...Hitachi NAS Platform 3080 and 3090 G1 Hardware Reference ...