91
M10locknuts(4pcs)to ensure a torque of 40~45Nm.
Caution:A:These components should be greased with butter
before assembly.
B:The surface of components can not be cracked.
Check whether these components are greased with butter and then
tighten the up-and-down rocker arm assembly and L/R fore
dampers and ther components.Fix the L/R tension rods into hole
by way of the trough of open-groove nut with cotter pin(4
pcs),and make these tension rods bisection on feet.
Содержание HS500ATV-2
Страница 1: ...1 500ATV 2 Maintenance Manual...
Страница 5: ...5 General Information 1 Description...
Страница 6: ...6...
Страница 33: ...33 Figure 2 33 remove dowel pin cushion cylinder head chain guide board See figure 2 34 Figure 2 34...
Страница 40: ...40 3 9 carburetor 3 9 1 structure of carburetor...
Страница 84: ...84 1 hexagon flange bolt M10 110 2 fore bridge case 4 4 2 Rear Bridge 4 4 2 1transmissioncase of rear bridge...
Страница 109: ...109 OVERRIDE FUEL m mi n1000 CDI 30A L2 L1...