Turn the machine off with the ignition key/at the off-button.
•
Connect an earthed plug with voltage 230 V. Charging time is approximately 8 hours, if
the batteries are completely flat.
Service/maintenance
General
The WinLet 350 is designed to cope with the demands and the environment extant at a construction site,
but its service life and safety can be reduced considerably if the stated service/maintenance items are not
complied with.
All mechanical joints must be checked at regular intervals to ensure that no components have worked loose.
In general, special attention is required after the initial hours of operation when the machine is brand-new,
as well as after the machine has been taken apart/any repairs.
Servicing by specialist personnel
As a minimum requirement, a full overhaul must be carried out by specialist personnel every 12 calendar
months. Contact GMV A/S for further information.
Cleaning
Clean the machine regularly with a damp sponge, brush or vacuum cleaner.
Important!
Do not wash the machine with running water, as this could ruin the truck components.
Lubrication
The WinLet 350 is primarily constructed using maintenance-free bearings in all moving parts. All these parts
must be kept free of dirt, but lubrication is not required. This means the machine should only be lubricated
with grease at the bearing?? joints as required:
Bearing bracket – steering mechanism
The enclosed bearing housing for the steering mechanism is packed with grease at the factory. Check and
top up at each main overhaul (at least every 12 calendar months), and apart from that, during normal
operating conditions, no additional lubrication of the steering mechanism's bearing bracket should be
anticipated. Checking and topping up with grease should only be necessary if operation starts to feel
sluggish. In such a case, always contact a qualified service technician, because this requires partial
dismantling of the machine.