Страница 1: ...Internal ATSECM Controller Operation Manual...

Страница 2: ...r shunt release closing coil ATS Controller Do not install key lock with ACB it will damaged the ACB when automatic transfer Do not install the under voltage release with ACB It will impact ATS automa...

Страница 3: ...Internal Default with 3m controller cable...

Страница 4: ...y applied to power plant post and telecommunications petroleum coal metallurgical railway municipal intelligent building etc Functional parameter Graphic LCD 800x480 pixel 5 inch TFT Two source AC pow...

Страница 5: ...000 Test mode Key Press this Key for 3 seconds to enter test function Auto mode Key Press this Key for 3 seconds to set controller as Auto mode Manual mode Key Press this Key for 3 seconds to set cont...

Страница 6: ...age status LED Green S1 normal fixed S1 abnormal blinking S2 voltage status LED Green S2 normal fixed S2 abnormal blinking Qs1 switch status LED Green on Qs1 close off Qs1 open Qs2 switch status LED G...

Страница 7: ...xecutes operation of open close switch and start stop generator When the time of exceeding limit of prior source is longer than the set delay time the device will open the load of the main source and...

Страница 8: ...Automatic retransfer to the priority source Don t automatic retransfer to the priority source 2 5 NOM FREQ Nominal network frequency 50 Hz 50 60Hz 2 6 POT PH Select and verify Phase Sequence OFF L1L2L...

Страница 9: ...bit input function Forced to pos 0 The transfer switch is immediately driven to 0 position and the controller in manu mode meantime when the input signal disappear the controller feedback to auto mode...

Страница 10: ...hen controller in auto mode Position I The output signal is activated when ATS in position I Position II The output signal is activated when ATS in position II Position 0 The output signal is activate...

Страница 11: ...ower supply status icon refer to pic1 page example Note Pic 1 Power supply status Data display icon refer to pic2 pic8 page example Note Pic2 Data display Phase voltage 220V Pic3 Data display Line vol...

Страница 12: ...synchronous transfer Pic5 Data display Programmable input if there is signal detected in 01 input port then the 01 will be selected Pic6 Data display Programmable output if there is output action in 0...

Страница 13: ...refer to pic9 page example Note Pic9 Alarm status Alarm status If there is A01 alarm A01 in the pic will be selected Commissioning icon refer to pic9 page example Note Pic10 Commissioning menu Simula...

Страница 14: ...Internal Pic11 Event record Device Event record...

Страница 15: ...wer supply terminal 2 L2 3 L3 4 N 5 L1 S2 AC 3 phase 4 wire voltage input L1 N are AC power supply terminal 6 L2 7 L3 8 N 17 COM Module grounding Module ground terminal 18 INPUT1 Break1 closure detect...

Страница 16: ...xiliary power output port 10A 35 Relay NO 36 Relay NC 37 OUT8 Relay COM Genset start output port 10A 38 Relay NO 39 Relay NC 40 OUT7 Relay COM Programmable output port 10A 41 Relay NO 42 Relay NC 43 O...

Страница 17: ...Internal 6 2 Terminal diagram ATSECM controller with air circuit breaker...

Страница 18: ...tage 400VAC LL Operating limit value 90 415VAC LN Frequency 45 65Hz Power consumption 10W 2 DC supply terminal 29 30 Rated battery voltage 24VDC Operating limit value 10 30VDC Max power consumption 10...

Страница 19: ...UT7 Contact Type single pole double throw Rated value DC 10A 30V AC 10A 250V 6 Output 43 OUT6 45 OUT5 46 OUT4 48 OUT3 49 OUT2 51 OUT1 Contact Type single pole single throw Rated value DC 10A 30V AC 10...