Installation
12/35
2.2
Installing NPIX with open netPI casing
This section describes how to install the NPIX Extension Module in the
netPI with the upper casing of the netPI removed. The installation with an
opened casing allows you free sight of the expansion socket inside the
netPI, thus enabling you to check whether you have fitted the connector
pins of the module properly into the expansion socket.
Requirements
Electrostatically sensitive devices
When installing the NPIX Extension Module: Take the necessary
precautions for handling components that are vulnerable to electrostatic
discharge.
Ø
Take care to touch the netPI and NPIX Extension Module only at their
casings respectively front panels. Do not touch the metal contacts on
the PCBs.
Ø
Before installation, touch a grounded object to discharge potential
static.
Ø
Wear an approved grounding wrist strap.
Ø
If available, use a static-safe workstation.
·
If your netPI has already been installed in a switch cabinet, remove the
device from the top hat rail and disconnect all cables from the device.
netPI Extension Modules | NPIX
DOC171201HW01EN | Revision 1 | English | 2018-01 | Released | Public
© Hilscher 2018