7
FIT END FRAMES TO WALL
BRACKETS, FIX STRUTS TO
END FRAMES AND
TELESCOPIC STRUTS TO
PIVOT BRACKETS.
5
FIT SQUARE CAPS TO STRUTS AND STRUTS TO WALL BRACKETS
BOLT - E
BOLT - D
BOLT - C
NUT - A
NUT – A
FIXED STRUT
END CAP
NUT - A
NUT - B
SPACER
BOLT - F
FIXED STRUT
WALL BRACKET
SQUARE
CAP
END FRAME - SHORT
*TIGHTEN NUT - B FIRMLY
END FRAME - LONG
TELESCOPIC STRUT
IMPORTANT: DO NOT OVER
TIGHTEN THE NUT. THE STRUT
MUST BE FREE TO PIVOT ON
THE BOLT.
IMPORTANT: DO NOT
OVER TIGHTEN NUTS.
THE FRAME & STRUT MUST BE
FREE TO PIVOT ON THE BOLTS.
ONCE FITTED, LAY STRUT BACK
AGAINST THE WALL
PIVOT BRACKET
WALL BRACKET
TELESCOPIC STRUT
LINE TENSIONER
LINE
TENSIONER
8
FIT SPACER TUBES TO
END FRAMES
6
FIT LINE TENSIONERS, OVAL CAPS AND PIVOT BRACKETS TO END
FRAMES. MAKE LEFT AND RIGHT HAND PAIR.
BOLT - B
SPREAD END FRAMES
APART AND PUSH SPACER
TUBE INTO THE ENDS.
NUT - A
OVAL CAP
END FRAME - SHORT
END FRAME - LONG
END FRAME - LONG
END FRAME - SHORT
NOTE: TIGHTEN ALL NUTS FIRMLY
GROOVE ON TOP
SLOT FACING
OUTWARDS
LINE
TENSIONER
LINE
TENSIONER
SPACER TUBE - LONG
SPACER TUBE -
SHORT
PIVOT BRACKET
MEASURE TO ENSURE THAT THE
SPACER TUBE IS FULLY
INSERTED INTO END FRAMES.
NOTE: THE ORIENTATION OF
THE BOLTS IS IMPORTANT
TO THE SUCCESSFUL
OPERATION OF THE
PARALINE.