PRE-POWER CHECKLIST
Before powering-up the case, be certain that all of the steps listed below
have been completed to ensure proper case functionality, safety and com-
pliance with warranty terms.
Have you thoroughly examined the case for shipping damage? (see
pg. 2)
Have you removed and discarded the casters? (see pg. 3)
Have you checked the vertical plumb of the case? The horizontal
level? (see pg. 3)
Have you removed any loose packaging or materials? (see pg. 4)
5
•
P111801H
Содержание OHMA-NRG
Страница 20: ...WIRING DIAGRAM B2 P111801H ...
Страница 21: ...SET POINTS C1 P111801H ...
Страница 23: ...DIXELL CASE CONTROLLER E1 P111801H ...
Страница 27: ...Seismic Bracket 5 F2 P111801H ...
Страница 28: ...Seismic Bracket 7 F3 P111801H ...
Страница 29: ...Seismic Bracket 11 F4 P111801H ...
Страница 30: ...Seismic Bracket 15 F5 P111801H ...
Страница 32: ...INTERNAL CASE COMPONENTS LAYOUT H1 P111801H ...
Страница 33: ...NOTES P111801H ...