Chapter 2 System Wiring
The preparation before installation and general wiring.
Steps
1. Draw a central line on the installation surface of the left or right pedestal.
2. Draw other parallel lines for installing the other pedestals.
Note
The distance between the nearest two line is L+200 mm. L represents the lane width.
3. Slot on the installation surface and dig installation holes according to the hole position diagram.
Figure 2-1 Hole Position Diagram
4. Bury cables. Each lane buries 1 network cable and 1 high voltage cable. For details, see the
system wiring diagram below.
DS-K3Y411X Series Flap Barrier Quick Start Guide
3
Содержание DS-K3Y411 Series
Страница 1: ...DS K3Y411X Series Flap Barrier Quick Start Guide...
Страница 53: ...Note The default status is NO DS K3Y411X Series Flap Barrier Quick Start Guide 41...
Страница 62: ...UD23418B A...