background image

1.   Adjust the feet-screw  to make the bathtub horizontal. 
2. Connect the drainpipe to the cloaca.
3. Fix shower head and pillow.
4. Connect to the cool(blue) and hot(red) water pipe.
5. Connect to power source, then fill water to have a test.

V o l tage: 2 20V - 2 4 0V   5 0 H z / 6 0 Hz  □  

 Power: 1HPx2 
Hydraulic pressure : 0.1~0.2Mpa
Size: 1800x1500x700mm

1.

Fill water 

Turn  the  cool/hot  switch  to  adjust  the  water  temperature,  turn  the 
shift switch to fill water through shower head or faucet or waterfall. 
Stop to fill water when the water level is 10-20mm above the water 
jet.

2.

Hydraulic massage

Press the pump switch to start the pump and bubble pump,then  there 
will  be  bubble  come  out  from  the  air  bubble  jets  and  turn  the  air 
regulator  to  adjust  the  hydraulic  power.  Push  the  jet  to  change  the 
water spray direction. Press the switch again to turn off the pump.

3.

Shower

Turn the cool/hot water switch to get suitable temperature, then turn 
the shift switch to use shower head to take a shower.

4.

Power off

Press  the  pump  switch  to  turn  off  the  pump,  then  turn  the  drain 
switch to let out the water,when stop use ,turn off the power source 
switch and the water supply switch. 

Parameter

Operation

Installation

Sketch

150

450

450

1500

650

950

75

0

cold water

hot  water 

tap

shower

drainage

Sketch

1

7

5

0

900

1

5

0

0

1800

SIZE:1800X1500X700mm

2 3

4

5 6

7 8 9

15

10 11 12 13

14

7

0

0

1.water pump switch

2.air conditioning

3.tap

4.hot water switch 

5.shift switch

6.cold water switch 

7.shower

8.air conditioning

9.water pump switch

10.water inlet

11.big nozzle

12.drainage switch

13.drainage

14.Pillow

15.small nozzle

Отзывы: