background image

USER’S QUICK REFERENCE

NEL MODELS 

1- Open the lid and turn the unit ON. Set 

the vacuum and seal levels (see below).

2- Lay the pouches on the shims and align 

their opening along the sealing cushion.

Standard support 

height

Low support height

Remove completely if 

nedded

TILT position

Useful for packaging 

liquids

3- Start the packaging cycle by closing the 

lid (hold the lid closed until you feel a 

suction).

OPERATION

(a)

(b)

(c)

HEIGHT CONFIGURATIONS

SEAL LEVELS

SET to 5

  f

or standard bags.

* Higher settings

 for thicker bags.

CONTROLS

ON

OFF

VACUUM

SEAL

GAS

-15

-30

0

CUT OFF

(OPTION)

 VACUUM LEVELS

  

             

= period of 

2 to 45 seconds 

 

 

  @ vacuum level of 10 to 90% 

 

             

= period of 

45 to 90 seconds 

   

 

 

   

  @ vacuum levels of 100%

* Higher settings for porous materials such as meat)

Note:

  Turning  the  unit  OFF  at 

any time during the cycle, then 

turning  it  ON  after  3  seconds: 

this will  

RESET

  the unit.

Main switch

This is the main power switch of 

the unit.

(OPTION)

1  1    

1  0  

  9 

   8

    

7  

  6 

   5    4    3    2

    1  

  0

1  1    

1  0  

  9 

   8

    

7  

  6 

   5    4    3    2

    1  

  0

to 5

to 11

Отзывы: