
- 38 -
…
NOTE:
NOTE:
NOTE:
NOTE:
◆
The number of points: 3 ~ 20.
◆
Make sure these points must be measured or listed clockwise
or anticlockwise, or mistake will result.
8.1
8.1
8.1
8.1 Area
Area
Area
Area Calculation
Calculation
Calculation
Calculation by
by
by
by Measured
Measured
Measured
Measured Data
Data
Data
Data or
or
or
or Input
Input
Input
Input Data
Data
Data
Data
【
Procedure
Procedure
Procedure
Procedure of
of
of
of area
area
area
area calculation
calculation
calculation
calculation
】
1.
1.
1.
1.
Press [MENU] into the
interface. Select "Program"
in menu [4] enter into Area
measurement.
S
P1
P2
P3
P4
P5
E
0
N
Program
_
1.REM
▲
2.MLM
3.Coord.Z
4.Survy(Area)
5.project
6.Roadway
▼