background image

 

 

Page 10 

 

Combustible Wall Chimney Connector Pass-Throughs 

 

 

 

 

 

 

 

Method  A

.  12”  (304.8  mm)  Clearance  to  Combustible  Wall  Member: 

Using  a  minimum  thickness  3.5”  (89  mm)  brick  and  a  5/8”  (15.9  mm) 

minimum  wall  thickness  clay  liner,  construct  a  wall  pass-through.    The 

clay  liner  must  conform  to  ASTM  C315  (Standard  Specification  for  Clay 

Fire  Linings)  or  its  equivalent.  Keep  a  minimum  of  12”  (304.8  mm)  of 

brick  masonry  between  the  clay  liner  and  wall  combustibles.    The  clay 

liner shall run from the brick masonry outer surface to the inner surface of 

the  chimney  flue  liner  but  not  past  the  inner  surface.    Firmly  grout  or 

cement the clay liner in place to the chimney flue liner.   

 
Method B

. 9” (228.6 mm) Clearance to Combustible Wall Member: Using a 

6”  (152.4  mm)  inside  diameter,  listed,  factory-built  Solid-Pak  chimney 
section with insulation of 1” (25.4 mm) or more, build a wall pass-through 
with a minimum 9” (228.6 mm) air space between the outer wall of the 
chimney length and wall combustibles.  Use sheet metal supports fastened 
securely to wall surfaces on all sides, to maintain the 9” (228.6 mm) air 
space.  When fastening supports to chimney length, do not penetrate the 
chimney liner (the inside wall of the Solid-Pak chimney).  The inner end of 
the  Solid-Pak  chimney  section  shall  be  flush  with  the  inside  of  the 
masonry  chimney  flue,  and  sealed  with  a  non-water  soluble  refractory 
cement.  Use this cement to also seal to the brick masonry penetration. 
 

Method  C

.  6”  (152.4  mm)  Clearance  to  Combustible  Wall  Member: 

Starting with a minimum 24 gage (.024” [.61 mm]) 6” (152.4 mm) metal 
chimney connector, and a minimum 24 gage ventilated wall thimble which 
has two air channels of 1” (25.4 mm) each, construct a wall pass-through. 
There  shall  be  a  minimum  6”  (152.4)  mm  separation  area  containing 
fiberglass  insulation,  from  the  outer  surface  of  the  wall  thimble  to  wall 
combustibles.  Support the wall thimble, and cover its opening with a 24-
gage  minimum  sheet metal support. Maintain the 6” (152.4 mm) space.  
There  should  also  be  a  support  sized  to  fit  and  hold  the  metal  chimney 
connector. See that the supports are fastened securely to wall surfaces on 
all  sides.    Make  sure  fasteners  used  to  secure  the  metal  chimney 
connector do not penetrate chimney flue liner.   

 

Method D

.  2” (50.8 mm) Clearance to Combustible Wall Member:

 

Start 

with a solid-pak listed factory built chimney section at least 12” (304 mm) 
long, with insulation of 1” (25.4 mm) or more, and an inside diameter of 
8” (2 inches [51 mm] larger than the 6” [152.4 mm] chimney connector). 
Use  this  as  a  pass-through  for  a  minimum  24-gage  single  wall  steel 
chimney connector. Keep solid-pak section concentric with and spaced 1” 
(25.4  mm)  off  the  chimney  connector  by  way  of  sheet  metal  support 
plates at both ends of chimney section.  Cover opening with and support 
chimney  section  on  both  sides  with  24  gage  minimum  sheet  metal 
supports. See that the supports are fastened securely to wall surfaces on 
all sides.

 Make sure fasteners used to secure chimney flue liner. 

 
NOTES: 
1.  Connectors to a masonry chimney, excepting method B, shall extend in one continuous section through the wall pass-through system 
and the chimney wall, to but not past the inner flue liner face. 
2.  A chimney connector shall not pass through an attic or roof space, closet or similar concealed space, or a floor, or ceiling. 

D

 

C

 

B

 

A

 

Содержание GloFire 905

Страница 1: ...loFire 905 Installation and Operating Instructions Save These Instructions Tested to UL 1482 by Intertek U S EPA Phase II Certified Stove Henan Hi Flame Metal Co Ltd 71 Welai Rd Zhengzhou China 450008...

Страница 2: ...ct local building fire officials or authority having jurisdiction about restrictions permit and installation inspection requirements in your area DO NOT INSTALL IN A MOBILE HOME DO NOT USE CHEMICALS O...

Страница 3: ...spare parts and screws from the ash pan 3 Fix the flue collar on the outlet which you selected by using the M6 20 flat crosshead screw Ensure all seals are secure to prevent air leakage If you choose...

Страница 4: ...mm non combustible hearth pad with k 0 42 BTU in ft2 hr o F The floor protector must extend 8 beyond each side of the flue loading and ash removal opening and 16 to the front In a rear vent installati...

Страница 5: ...xpressed as R ii For multiple layers add R values of each layer to determine overall R value 3 If the overall R value of the system is greater than the R value of the specified floor protector the alt...

Страница 6: ...the regulatory authority A combustible surface is anything that can burn i e sheet rock wall paper wood fabrics etc These surfaces are not limited to those that are visible and also include materials...

Страница 7: ...t of condensed or liquid creosote from running down the outside of the pipe or the stovetop All joints including the flue collar connection must be secured with three sheet metal screws to ensure that...

Страница 8: ...ney is used the manufacturer s installation instructions must be followed You must also purchase from the same manufacturer and install the ceiling support package or wall pass through and T section p...

Страница 9: ...ortion of the chimney must comply with NFPA 211 clearances Make sure there are no cracks loose mortar or other signs of deterioration and blockage Have the chimney cleaned before the stove is installe...

Страница 10: ...height above the roof and any other nearby obstructions The chimney must be at least 3 90 cm higher than the highest point where it passes through the roof and at least 2 60 cm higher than the highes...

Страница 11: ...ney connector and a minimum 24 gage ventilated wall thimble which has two air channels of 1 25 4 mm each construct a wall pass through There shall be a minimum 6 152 4 mm separation area containing fi...

Страница 12: ...r liquids to start or freshen up a fire in this heater Keep all such liquids well away from the heater while it is in use Do not elevate the fire build wood fire directly on firebox hearth Light a fir...

Страница 13: ...osed of by burial in soil or otherwise locally dispersed they should be retained in the closed container until all cinders have thoroughly cooled Creosote Formation and need for removal When wood is b...

Страница 14: ...th 10mm sealing tape 9 Glass clip 10 Refractory glass 11 Door catch 12 Refractory handle 13 Bolt M8 75 14 Spin valve 15 Door 16 Ashpan 17 Bottom air inlet control 18 Grate 19 Grate frame 20 Baffle 21...

Страница 15: ...ibited fuels listed 5 The stove must have been continuously kept in a serviceable condition and you must not have allowed the stove to corrode 6 You must not have modified the construction of the stov...

Отзывы: