![HGST Ultrastar Serv24-HA Скачать руководство пользователя страница 105](http://html1.mh-extra.com/html/hgst/ultrastar-serv24-ha/ultrastar-serv24-ha_user-manual_2128546105.webp)
c) Connect the 100 GbE cables into the QSFP28 ports.
d) Connect the power cables to the PSUs.
Note: The connections mentioned in (b) and (c) are only necessary if the user intends to have
both connection types.
24. Power On the enclosure and verify it is functioning properly.
a) The enclosure will power itself on about 20 seconds after it is connected to power.
b) Once the enclosure is physically powered-on, from a laptop, log into the Web UI.
c) In the Web UI, click Dashboard.
The Dashboard Control Panel page will appear.
Figure 158: Dashboard Control Panel
d) Verify that the reported failure no longer appears in the Dashboard Control Panel.
3.12
Compute Canister Replacement
Table 40: Replacement Procedure Info
Time Required
# of People Required
Required Tools
30 minutes
1
T30 Torx screwdriver
1.
Identify the failed Compute Canister.
a) Open a browser and browse to the BMC IP Address of the Compute Canister.
105
3
Part Replacement
User Guide
3.12
Compute Canister Replacement
Содержание Ultrastar Serv24-HA
Страница 1: ...User Guide Ultrastar Serv24 HA P2522 Version 1 2 August 2018 1ET1089 Long Live Data www hgst com...
Страница 13: ...Figure 4 Processor Block Diagram 13 1 Ultrastar Serv24 HA Overview User Guide 1 2 Block Diagrams...
Страница 161: ...Authority or Mark Country Region SII Israel 161 5 Disclaimers User Guide 5 5 Country Certifications...