Heyuan Intelligence DZ81-DZS310 Скачать руководство пользователя страница 11

 

                                                                                                                                                                                                         

17670 

4506 

Export Active Energy 

17671 

4507 

17672 

4508 

17673 

4509 

Total Reactive Energy 

17674 

450A 

17675 

450B 

17676 

450C 

Import Reactive Energy 

17677 

450D 

17678 

450E 

17679 

450F 

Export Reactive Energy 

17680 

4510 

17681 

4511 

Primary Power Value = Secondary Power Value * Voltage Ratio * Current Ratio 

 

Chapter 7 After-sales Service 

Product Warranty 

1. 

The product warranty period is one year.   

2. 

The company is responsible for free maintenance or exchange within one-year warranty period. 

3. 

The cost of the components and freight shall be charged for improper meter installation and/or 

operation. 
4. 

Over  the  warranty  period,  part  of  the  maintenance  cost  according  to  actual  situation  will  be 

charged. 
 

Service Guarantee   

1. Product technical consulting and quality complaints will be replied within 12 hours. 
2. Solutions for quality complaints will be provided within 24 hours. 
3. Except statutory holidays and force majeure. 

 

Chapter 8 

Contact Us

 

Headquarter  Add.:  7F  No.1  Aosheng  Building,  1166  Xinluo  Street,  High-tech  Development  Zone, 

Jinan, P.R. China 250101 

Factory Add.: 2F Innovation Factory, Feiyue Road, High-tech Development Zone, Jinan, P.R. China 

250101 

Tel: +86 68621770-863 

E-mail: [email protected] 

Website: www.heyuanintel.com 

Содержание DZ81-DZS310

Страница 1: ...Smart Compact Din Rail Meter DZ81 DZS310 User Manual V1 0 Heyuan Intelligence Technology Co Ltd...

Страница 2: ...ered to have read this manual and accept all our terms Heyuan shall not be responsible or liable for any damages or injuries caused by improper meter installation and or operation Attention the follow...

Страница 3: ...2 3 2 Installation Method 2 Chapter 4 Terminals 2 Chapter 5 Typical Wiring 2 5 1 Three phase Four wire Wiring Mode under Low Voltage 2 5 2 Three phase Three wire Wiring Mode under Low Voltage 3 5 3 R...

Страница 4: ...oltage Range 0 6Un 1 2Un 2 2 Input Current Secondary Current 100mA Measuring Range 1 In 4In 2 3 Energy Accuracy Class Class 1 Resolution 0 01kWh 2 4 Frequency Measurement Frequency Measuring Range 45...

Страница 5: ...ion Environment DZS310 should be installed in a dry and dust free environment Avoid exposing meter to excessive heat radiation and high electrical noise sources Install Method DIN rail Mounting Chapte...

Страница 6: ...3 A B C Ic Ia Ia Un Uc Ub Ua Ic Ib Ib N 5 2 Three phase Three wire Wiring Mode under Low Voltage A B C Ic Ia Ia Un Uc Ub Ua Ic Ib Ib 5 3 RS485 Interface 5 4 Interface of Energy Pulse Output PE PE...

Страница 7: ...ero phase current Magnifying 1000 times 0 65535 4110 100E A phase active power Magnifying 1000 times 32768 32767 4111 100F B phase active power Magnifying 1000 times 32768 32767 4112 1010 C phase acti...

Страница 8: ...83 1507 5384 1508 zero phase voltage Magnifying 100 times 0 4294967295 5385 1509 5386 150A line voltage A B Magnifying 100 times 0 4294967295 5387 150B 5388 150C line voltage B C Magnifying 100 times...

Страница 9: ...r Magnifying 1000 times 2147483647 214748 3647 5417 1529 5418 152A total reactive power Magnifying 1000 times 2147483647 214748 3647 5419 152B 5420 152C A phase apparent power Magnifying 1000 times 0...

Страница 10: ...2400 2 4800 3 9600 8196 2004 Wiring Mode 0 0 3LN 1 2LL 8197 2005 PT 1 1 9999 Remark 1 8198 2006 CT 1 1 9999 Remark 1 8199 2007 Energy Type Selection of Pulse Output 0 0 full wave active energy pulse...

Страница 11: ...nents and freight shall be charged for improper meter installation and or operation 4 Over the warranty period part of the maintenance cost according to actual situation will be charged Service Guaran...

Отзывы: