
H E Y E R P a s i t h e c
Rev. 0.2 Draft – 12/09
HEYER Pasithec, Operator’s manual
3 / 106
Contents
1
Statement .......................................................................................................................................................................... 5
1.1
Manufacturer Responsibility...................................................................................................................................... 5
1.2
Security, Reliability and Operating Conditions........................................................................................................... 5
1.3
Return ...................................................................................................................................................................... 6
1.4
Details of the Manufacturer ....................................................................................................................................... 6
2
Introduction........................................................................................................................................................................ 7
2.1
Intended Use ............................................................................................................................................................ 7
2.1.1
Range of Use .................................................................................................................................................. 7
2.1.2
Contraindication .............................................................................................................................................. 7
2.2
Symbols.................................................................................................................................................................... 7
2.3
Definition, Abbreviation ........................................................................................................................................... 10
3
System Components.........................................................................................................................................................11
3.1
Anesthetic System ...................................................................................................................................................11
3.2
Breathing System ................................................................................................................................................... 17
3.2.1
Bellows Assembly Ports................................................................................................................................. 18
3.2.2
Ventilating Circulation .................................................................................................................................... 19
3.3
Vaporizer ................................................................................................................................................................ 19
3.4
Anesthetic Ventilator ............................................................................................................................................... 19
3.4.1
Front Panel.................................................................................................................................................... 20
3.4.2
Keys .............................................................................................................................................................. 20
3.4.3
Indicator ........................................................................................................................................................ 21
3.4.4
Navigator Knob.............................................................................................................................................. 21
3.4.5
Screen Layout ............................................................................................................................................... 21
3.4.6
Rear Panel .................................................................................................................................................... 24
3.5
Menu ...................................................................................................................................................................... 25
3.5.1
Operating Guide ............................................................................................................................................ 25
3.5.2
Menu Diagram............................................................................................................................................... 28
4
Operating Guide .............................................................................................................................................................. 34
4.1
Startup.................................................................................................................................................................... 34
4.1.1
System Self Test............................................................................................................................................ 34
4.1.2
Manual Leak Test .......................................................................................................................................... 36
4.1.3
Safety Valve Test ........................................................................................................................................... 37
4.1.4
Automatic Leak Test ...................................................................................................................................... 38
4.1.5
Compliance Test ............................................................................................................................................ 39
4.1.6
Ventilation Mode Setup.................................................................................................................................. 41
4.1.7
Breathing Parameters Setup.......................................................................................................................... 41
4.2
Start Mechanical Ventilation .................................................................................................................................... 41
4.2.1
Stop Mechanical Ventilation........................................................................................................................... 41
4.3
Start Manual Ventilation .......................................................................................................................................... 42
4.3.1
Stop Manual Ventilation ................................................................................................................................. 42
4.4
Shutdown ............................................................................................................................................................... 42
4.5
Waveforms ............................................................................................................................................................. 42
5
Pre-use Check List........................................................................................................................................................... 45
5.1
Pre-use Check List Procedure ................................................................................................................................ 45
5.1.1
Check System ............................................................................................................................................... 45
5.1.2
Main Failure Alarm Test ................................................................................................................................. 46
5.2
Test Gas Supply Pipeline ........................................................................................................................................ 46
5.3
Monitoring Flow Control .......................................................................................................................................... 46
5.3.1
Monitoring without Oxygen ............................................................................................................................ 46
5.3.2
Monitoring with Oxygen ................................................................................................................................. 48
5.4
Installing and Testing Vaporizer............................................................................................................................... 49
5.4.1
Installation ..................................................................................................................................................... 49
5.4.2
Testing Vaporizer ........................................................................................................................................... 49
5.5
Alarm Test .............................................................................................................................................................. 50
5.6
Breathing System Test ............................................................................................................................................ 51
5.6.1
Check O
2
+ Button.......................................................................................................................................... 51
5.7
Ventilator Test ......................................................................................................................................................... 51
6
Installation and Connection .............................................................................................................................................. 53
6.1
Install the Absorber Canister ................................................................................................................................... 54
6.1.1
When to Replace Absorbent .......................................................................................................................... 54
6.1.2
Disassembling Absorber ................................................................................................................................ 55
6.1.3
Filling Absorbent............................................................................................................................................ 55
6.2
Connecting Tubes and Lines................................................................................................................................... 55
6.2.1
Connect CO
2
Monitor..................................................................................................................................... 56
6.2.2
Connect Anesthetic Agent Monitor ................................................................................................................. 57
6.3
Connecting Gas and Electricity ............................................................................................................................... 57
6.3.1
AC Inlet ......................................................................................................................................................... 58
6.3.2
Aux. Mains Outlet .......................................................................................................................................... 58
6.3.3
Communication Port ...................................................................................................................................... 59
6.3.4
Gas Inlet Module ........................................................................................................................................... 59
7
Cleaning and Disinfecting ................................................................................................................................................ 60
Содержание Pasithec
Страница 2: ......
Страница 103: ...H E Y E R P a s i t h e c Rev 0 2 Draft 12 09 HEYER Pasithec Operator s manual 103 106 NOTES...
Страница 104: ...H E Y E R P a s i t h e c 104 106 HEYER Pasithec Operator s manual Rev 0 2 Draft 12 09 NOTES...
Страница 105: ......