To replace the component, reverse the removal procedure.
Installing the air baffle
IMPORTANT:
The left and right sides of the chassis are oriented 180° from each other. Components
installed on one side of the chassis must be turned 180° when they are installed on the opposite side.
Procedure
1.
on page 18).
2.
Install the air baffle.
IMPORTANT:
If the DIMM latches are not fully closed, the baffle will not sit properly.
IMPORTANT:
Ensure that all cables are routed to the sides of the server. If the baffle will not seat
properly, you may need to move the cables to their original position.
3.
Close the front bracket.
4.
Install the access panel.
5.
Install the server into the chassis (
on page 14).
6.
Press the Power On/Standby button.
The server exits standby mode and applies full power to the system. The system power LED changes from
amber to green.
Removing the rear support bracket
IMPORTANT:
The left and right sides of the chassis are oriented 180° from each other. Components
installed on one side of the chassis must be turned 180° when they are installed on the opposite side.
22
Operations
Содержание HPE ProLiant XL230k Gen10
Страница 10: ...Chassis server bay numbering Chassis I O module bay numbering 10 Component identification...
Страница 43: ...4 Install the riser cover 5 Install the riser into the I O module Hardware options installation 43...
Страница 58: ...Cabling Front panel LED board assembly cabling SATA drive cabling 58 Cabling...