background image

6. Place the system on a flat, level surface.

Remove the access panel

WARNING: To reduce the risk of personal injury from hot surfaces, allow the drives, power supplies, and internal system
components to cool before touching them.

Procedure

1. Power down the system (Power down the system).

2. Remove all power:

a. Disconnect each power cord from the power source.

b. Disconnect each power cord from the system.

3. Remove the system from the rack (Remove the system from the rack).

4. Place the system on a flat, level work surface.

5. Remove the access panel.

Operations

42

Содержание Apollo 4200 Gen10

Страница 1: ...tion 6 Abstract This document is for the person who installs administers and troubleshoots servers and storage systems Hewlett Packard Enterprise assumes that you are qualified in the servicing of com...

Страница 2: ...the U S Government under vendor s standard commercial license Links to third party websites take you outside the Hewlett Packard Enterprise website Hewlett Packard Enterprise has no control over and i...

Страница 3: ...SSD slot numbering 31 HPE Smart Array P824i p MR Gen10 Controller 31 HPE InfiniBand HDR Ethernet 940QSFP 56x16 adapter LEDs 32 DSC 25 2 port SFP28 card ports and LEDs 33 HPE NS204i p NVMe OS Boot Dev...

Страница 4: ...age 69 Installing the two bay SFF hot plug rear drive cage and two slot PCIe riser cage 70 Installing the six bay SFF NVMe rear drive cage 73 Installing the six bay SFF rear drive cage SAS SATA 75 M 2...

Страница 5: ...Battery cabling 133 iLO ports to network cabling 133 Fan assembly cabling 134 Front panel cabling 135 Software and configuration utilities 136 Server mode 136 Product QuickSpecs 136 Active Health Sys...

Страница 6: ...stem battery 150 Electrostatic discharge 152 Specifications 153 Environmental specifications 153 Mechanical specifications 153 Power supply specifications 154 Hot plug power supply calculations 155 We...

Страница 7: ...ponents 12LFF dual cage configuration Item Description 1 LFF hot plug drives 2 USB 2 0 port 3 iLO Service Port 24SFF dual cage configuration Item Description 1 SFF hot plug drives 2 USB 2 0 port 3 iLO...

Страница 8: ...file standup expansion board or riser cage options2 6 PCIe3 x16 slot 1 for low profile standup expansion board2 7 Hot plug power supply bay 1 8 Power supply blank bay 2 9 Video connector 10 NIC 2 port...

Страница 9: ...12 NIC 2 port 13 NIC 1 port 14 USB 3 0 ports 15 iLO Management port 2 16 UID LED 17 iLO Management port 1 1 The PCIe3 expansion slots 5 7 are associated with processor 2 2 The PCIe3 expansion slots 1...

Страница 10: ...ss through riser Item Description 1 PCIe3 x16 slot 7 for low profile standup expansion board1 2 PCIe3 x24 slot 6 for low profile standup expansion board1 3 PCIe3 x8 slot 5 for low profile standup expa...

Страница 11: ...ctivity 3 UID LED Solid blue Activated Flashing blue 1 flash per second Remote management or firmware upgrade in progress 4 flashes per second iLO manual reboot sequence initiated 8 flashes per second...

Страница 12: ...link Off No network link 9 NIC port 2 activity LED Solid green Link to network Flashing green Network active Off No network activity 10 Power supply LED Solid green Normal Off One or more of the foll...

Страница 13: ...cessor 2 DIMM slots 13 System battery 14 Processor 1 DIMM slots 15 Fan signal connector 16 Energy pack connector 17 Fan power connector 18 Internal drive cage backplane power connector 19 Controller b...

Страница 14: ...system DIMM label identification To determine DIMM characteristics see the label attached to the DIMM The information in this section helps you to use the label to locate specific information about t...

Страница 15: ...400 MT s 2666 MT s 6 CAS latency P CAS 15 15 15 T CAS 17 17 17 U CAS 20 18 18 V CAS 19 19 19 for RDIMM LRDIMM V CAS 22 19 19 for 3DS TSV LRDIMM 7 DIMM type R RDIMM registered L LRDIMM load reduced E U...

Страница 16: ...ns and compatibility see the product QuickSpecs on the Hewlett Packard Enterprise website https www hpe com support persistentmemoryQS System maintenance switch descriptions Position Default Function...

Страница 17: ...ystem Utilities screen appears 3 Select System Configuration BIOS Platform Configuration RBSU System Options SATA Controller Options Embedded SATA Configuration and then press Enter 4 Select Enable SA...

Страница 18: ...erate a crash dump log do one of the following Use the iLO Virtual NMI feature Short the NMI header For more information see the Hewlett Packard Enterprise website http www hpe com support ilo docs Fr...

Страница 19: ...sec iLO is rebooting Flashing amber System degraded3 Flashing red 1 flash per sec System critical3 4 NIC status LED1 Solid green Link to network Flashing green 1 flash per second Network active Off N...

Страница 20: ...le provides a list of power fault codes and the subsystems that are affected Not all power faults are used by all servers Subsystem LED behavior System board 1 flash Processor 2 flashes Memory 3 flash...

Страница 21: ...n where it is connected Item Drive numbering Internal drive cage 49 51 HPE Smart Storage S100i SR Gen10 controller RAID 49 50 HPE Smart Storage S100i SR Gen10 controller HBA mode 1 3 Directly attached...

Страница 22: ...Storage S100i SR Gen10 controller HBA mode 1 2 3 4 Directly attached to controller 49 149 50 150 6SFF NVMe rear drive numbering 6SFF rear drive numbering SAS SATA Drive LEDs LFF SFF NVMe and uFF driv...

Страница 23: ...ert has been received for this drive Replace the drive as soon as possible 2 Online Activity Solid green The drive is online and has no activity Flashing green 4 flashes per second The drive is operat...

Страница 24: ...rasing Flashing amber green The drive is a member of one or more logical drives and predicts the drive will fail Flashing amber The drive is not configured and predicts the drive will fail Solid amber...

Страница 25: ...t allowing the device and bus to complete and cease the signal traffic flow CAUTION Do not remove an NVMe drive from the drive bay while the Do not remove LED is flashing The Do not remove LED flashes...

Страница 26: ...and predicts the drive will fail Solid amber The drive has failed Off The drive is not configured by a RAID controller 4 Do not remove Solid white Do not remove the drive The drive must be ejected fro...

Страница 27: ...y a RAID controller or a spare drive Solid green The drive is a member of one or more logical drives Flashing green 4 Hz The drive is operating normally and has activity Flashing green 1 Hz The drive...

Страница 28: ...NVMe or uFF 2 Internal drive cage 3 Front drive cage Drive cage backplane identification 4LFF rear drive cage backplane Item Description 1 x4 Mini SAS connector 2 Power input connector 2SFF rear drive...

Страница 29: ...SAS connector 2 Power input connector Six bay SFF rear drive cage backplane SAS SATA Item Description 1 P2 connector 2 P1 connector 3 Power input connector Six bay SFF NVMe rear drive cage backplane C...

Страница 30: ...5 NVMe port 2 connector 6 NVMe port 3 connector Front and internal LFF drive cage backplane Item Front drive cage backplane Internal drive cage backplane 1 P1 connector P1 connector 2 P2 connector P2...

Страница 31: ...ckplane 1 P3 connector reserved P3 connector 2 P1 connector P1 connector 3 P2 connector P2 connector M 2 SSD slot numbering Item Description 1 M 2 slot 1 port 1i 2 M 2 slot 2 port 2i HPE Smart Array P...

Страница 32: ...56x16 adapter LEDs Link LED status1 Description Off A link has not been established Solid amber Active physical link exists Blinking amber 4 Hz blinking amber indicates a problem with the physical lin...

Страница 33: ...alf length HHHL SFP28 network adapter It has LEDs for Link L and Activity A for each port A half height bracket is shown in the following illustration with SFP28 ports and LEDs Table 2 LED indicators...

Страница 34: ...fault 4 SFP Port 2 Link Activity LED Off A link has not been established Solid green Valid Ethernet link Flashing green Passing traffic flashing frequency indicates traffic intensity Solid amber Link...

Страница 35: ...ner 4 M 2 drive retaining latches HPE NS204i p NVMe OS Boot Device LED definitions Item Description Fault LED status 1 Bay 1 LED Off Normal Flashing 1Hz Drive predictive failure Amber Drive failure 2...

Страница 36: ...NVMe rear drive cage fan numbering Component identification 36...

Страница 37: ...and the OS If an application stops responding you can use this method to force a shutdown Use a virtual power button selection through iLO 5 This method initiates a controlled remote shutdown of appl...

Страница 38: ...ith the front drive cages extended When the front drive cages are extended while the system is powered on monitor the status of the front drive temp sensor 08 HD Max in iLO If the iLO temp sensor 08 H...

Страница 39: ...w profile LFF drive LEDs Low profile LFF drive LED definitions b Wait until the Online Activity LED stops flashing c To open the release lever press the latch d Pull the release lever to disengage the...

Страница 40: ...elease the release lever d Pull the release lever to disengage the drive from the backplane and slide the drive out of the drive bay Remove a uFF drive a Observe the LED status of the drive and determ...

Страница 41: ...one component is extended a rack might become unstable Procedure 1 Back up all system data 2 Power down the system Power down the system 3 Remove all power a Disconnect each power cord from the power...

Страница 42: ...l system components to cool before touching them Procedure 1 Power down the system Power down the system 2 Remove all power a Disconnect each power cord from the power source b Disconnect each power c...

Страница 43: ...s panel on top of the system and then insert the tabs into the corresponding slots on the system 2 Tighten the access panel screws Open the cable management holder Procedure 1 Power down the system Po...

Страница 44: ...Storage Battery NOTE System ROM and firmware messages might display energy pack in place of Smart Storage Battery Energy pack refers to both HPE Smart Storage batteries and HPE Smart Storage Hybrid c...

Страница 45: ...r down the system Power down the system 2 Remove the system from the rack Remove the system from the rack 3 Place the system on a flat level work surface 4 Remove the access panel Remove the access pa...

Страница 46: ...ins on the front edge of the air baffle into the holes located on the rear edge of the fan cage 2 If applicable reinstall the HPE Smart Storage Battery on the air baffle Installing the HPE Smart Stora...

Страница 47: ...affle Install the air baffle Remove the rear drive cage blank Procedure 1 Power down the system Power down the system 2 Remove all power a Disconnect each power cord from the power source b Disconnect...

Страница 48: ...ocker Procedure 1 Power down the system Power down the system 2 Remove all power a Disconnect each power cord from the power source b Disconnect each power cord from the system 3 Remove the system fro...

Страница 49: ...rostatic discharge Procedure 1 Power down the system Power down the system 2 Remove all power a Disconnect each power cord from the power source b Disconnect each power cord from the system 3 Remove t...

Страница 50: ...Prerequisites Before you perform this procedure make sure that you have the components included with the hardware kit Procedure 1 Power down the system Power down the system 2 Remove all power a Disco...

Страница 51: ...Two bay SFF hot plug rear drive cage removal Six bay SFF NVMe drive cage removal Operations 51...

Страница 52: ...Six bay SFF rear drive cage SAS or SATA To replace the component reverse the removal procedure Operations 52...

Страница 53: ...our Call to Repair 4 Hour 24x7 Next Business Day Proactive Care Help prevent service incidents and get you to technical experts when there is one 6 Hour Call to Repair 4 Hour 24x7 Next Business Day St...

Страница 54: ...d mouse Remotely connect to the iLO web interface and run a remote console a Verify the following iLO is licensed to use the remote console feature If iLO is not licensed visit http www hpe com info i...

Страница 55: ...o create arrays For procedures on creating arrays with MR controllers see the following guide in the information library HPE Smart Array P824i p MR Gen10 User Guide If no controller is installed do on...

Страница 56: ...requirements When installing the system in a rack select a location that meets the environmental standards described in this section Space and airflow requirements To allow for servicing and adequate...

Страница 57: ...nal equipment to impede airflow around the server or to increase the internal rack temperature beyond the maximum allowable limits Do not exceed the manufacturer s TMRA Power requirements Installation...

Страница 58: ...either permanently wired to the branch circuit of the building or includes a nondetachable cord that is wired to an industrial style plug NEMA locking style plugs or plugs complying with IEC 60309 ar...

Страница 59: ...arnings and cautions WARNING When all components are removed the system weighs 22 34 kg 49 25 lb When all components are installed the system can weigh up to 40 60 kg 89 51 lb Before configuring your...

Страница 60: ...tinue to populate the rack from the bottom to the top CAUTION Before installing the system in a rack be sure to properly scope the limitations of the rack Before proceeding with the installation consi...

Страница 61: ...njury or damage to the equipment Observe local occupational health and safety requirements and guidelines for manual material handling Get help to lift and stabilize the product during installation or...

Страница 62: ...in gray Install the chassis retention brackets on the non shelf portion of the rack rail 3 Install the system into the rack 4 Tighten the rack ear thumbscrews 5 Make sure the pins on the chassis reten...

Страница 63: ...ne or telecommunications connectors into RJ 45 connectors 9 Connect peripheral devices to the system For information on identifying connectors see Rear panel components 10 Install the power supply 11...

Страница 64: ...erforming Maintenance in the HPE Intelligent Provisioning User Guide and online help For additional system software and firmware updates download the Service Pack for ProLiant from the Hewlett Packard...

Страница 65: ...Registering the server To experience quicker service and more efficient support register the product at the Hewlett Packard Enterprise Product Registration website Setup 65...

Страница 66: ...ar steps and streamline the installation process WARNING To reduce the risk of personal injury from hot surfaces allow the drives and the internal system components to cool before touching them CAUTIO...

Страница 67: ...operate the system with any of the front or rear drive cage bays empty To maintain proper airflow and sufficient cooling all drive bays in the front and rear cage must have a drive or a drive blank P...

Страница 68: ...LFF drive SFF drive NVMe drive rear drive cage only uFF drive rear drive cage only Hardware options installation 68...

Страница 69: ...k Hewlett Packard Enterprise recommends installing at least one drive in the rear drive cage before operating the system Installing the four bay LFF hot plug rear drive cage IMPORTANT Hewlett Packard...

Страница 70: ...stalling the two bay SFF hot plug rear drive cage and two slot PCIe riser cage CAUTION For proper cooling do not operate the system without the access panel baffles expansion slot covers or blanks ins...

Страница 71: ...ct each power cord from the power source b Disconnect each power cord from the system 3 Remove the system from the rack Remove the system from the rack 4 Place the system on a flat level work surface...

Страница 72: ...k Remove the system from the rack 4 Place the system on a flat level work surface 5 Remove the access panel Remove the access panel 6 Remove the air baffle Remove the air baffle 7 Remove the rear opti...

Страница 73: ...s required If the NVMe rear drive cage will connect to PCIe slots 2 and 6 or only to slot 6 then two processors are required Prerequisites Before you perform this procedure make sure that you have the...

Страница 74: ...will be connected d Replace the plastic cover 10 Connect the cables to one of the following A pass through board installed in slot 2 NVMe rear drive cage cabling A pass through board installed in slot...

Страница 75: ...rive numbers 49 54 Drive numbering The six bay SFF rear drive cage connects only to PCIe slot 2 Prerequisites Before you perform this procedure make sure that you have the following items available Th...

Страница 76: ...stallation two slot PCI riser cage option required PCIe3 x 8 riser board slot 3 and 4 For more information about product features specifications options configurations and compatibility see the produc...

Страница 77: ...board PCIe expansion slot cover from the appropriate PCIe expansion slot b Install the M 2 SSD enablement board Verify that the board is firmly seated in the slot M 2 SSD enablement board installed in...

Страница 78: ...e cable management holder 8 To install the M 2 SSD enablement board in the PCI riser cage do the following a Remove the PCI riser cage Remove the PCIe riser cage b Remove the riser slot cover c Instal...

Страница 79: ...12 Install the air baffle Install the air baffle 13 Install the access panel Install the access panel 14 Install the system into the rack Installing the system into the rack 15 Power up the system Po...

Страница 80: ...ontroller Procedure 1 Power down the system Power down the system 2 Remove all power a Disconnect each power cord from the power source b Disconnect each power cord from the system 3 Remove the system...

Страница 81: ...oller Cabling e If installing a type p controller connect the controller backup power cable to the system board Cabling IMPORTANT To enable SmartCache or CacheCade in a P class type p Smart Array cont...

Страница 82: ...ge option is required To install an expansion board or type p controller in this riser cage do the following a Remove the PCIe riser cage Remove the PCIe riser cage b Remove the riser slot cover c If...

Страница 83: ...e equipment remove power from the system by removing the power cord The front panel Power On Standby button does not shut off system power Portions of the power supply and some internal circuitry rema...

Страница 84: ...e the system from the rack 4 Place the system on a flat level work surface 5 Remove the access panel Remove the access panel 6 Remove the air baffle Remove the air baffle 7 Remove the PCIe riser slot...

Страница 85: ...eled WHITE CABLE and BLACK CABLE respectively The cable latch door must be open when connecting the cables Close the cable latch door after connecting the cable c Slide the cable retention clip up and...

Страница 86: ...n both cards are angled in the same direction after installation CAUTION Avoid routing the cables over any components in the system that may become hot such as the heatsink 9 Install the adapter in th...

Страница 87: ...the riser cage 10 Install the auxiliary card in the appropriate slot for processor 2 PCIe slots 6 or 7 11 Install the air baffle Install the air baffle 12 Install the access panel Install the access p...

Страница 88: ...requisites Before beginning installation ensure that the server is updated with the latest operating system firmware and drivers Procedure Installing drives onto the boot device 1 Remove the liner fro...

Страница 89: ...ss the expansion slot 12 Install the access panel Install the access panel 13 Do one of the following Slide the server into the rack Install the server into the rack 14 Power up the server Deploying a...

Страница 90: ...ace the system on a flat level work surface 5 Remove the access panel Remove the access panel 6 Remove the PCIe riser cage if applicable NOTE Image may differ from actual product 7 Install the Pensand...

Страница 91: ...through System Utilities and configured through HPE Smart Storage Administrator Intelligent Provisioning Type a controllers Type a controllers install in the type a Smart Array connector Type p contro...

Страница 92: ...e either an expansion slot cover or an expansion board installed CAUTION Hewlett Packard Enterprise recommends performing a backup of all server data before installing or removing a controller or adap...

Страница 93: ...er features select the relevant user documentation on the Hewlett Packard Enterprise website http www hpe com info enterprise docs Installing a processor heatsink assembly CAUTION THE PINS ON THE SYST...

Страница 94: ...n Scalable processors at this time For more information see the product QuickSpecs on the Hewlett Packard Enterprise website https www hpe com info qs Prerequisites Before installing this option be su...

Страница 95: ...ions IMPORTANT This system does not support mixing LRDIMMs and RDIMMs Attempting to mix any combination of these DIMMs can cause the server to halt during BIOS initialization All memory installed in t...

Страница 96: ...M characteristics see the label attached to the DIMM The information in this section helps you to use the label to locate specific information about the DIMM Item Description Example 1 Capacity 8 GB 1...

Страница 97: ...ations and compatibility see the HPE DDR4 SmartMemory QuickSpecs on the Hewlett Packard Enterprise website https www hpe com support DDR4SmartMemoryQS Installing a DIMM Procedure 1 Power down the syst...

Страница 98: ...effective memory and storage to transform big data workloads and analytics by enabling data to be stored moved and processed quickly HPE Persistent Memory modules use the standard DIMM form factor and...

Страница 99: ...from Hewlett Packard Enterprise Windows Server 2016 with persistent memory drivers from Hewlett Packard Enterprise Windows Server 2019 Red Hat Enterprise Linux 7 6 and later Red Hat Enterprise Linux...

Страница 100: ...ot all DIMMs or HPE Persistent Memory modules will face in the same direction CAUTION Electrostatic discharge can damage electronic components Be sure you are properly grounded before beginning this p...

Страница 101: ...UEFI System Utilities Access System Utilities through the Remote Console to configure the system by pressing the F9 key during POST iLO RESTful API Use the iLO RESTful API through tools such as the RE...

Страница 102: ...m WARNING To reduce the risk of injury from electric shock hazards do not open power supplies Refer all maintenance upgrades and servicing to qualified personnel WARNING To reduce the risk of personal...

Страница 103: ...nd product may have multiple power supplies To remove all power from the product disconnect the power for each power supply In accordance with applicable national requirements for Information Technolo...

Страница 104: ...3 Crimp the ring tongue to the ground cable from the 48 V DC power source 4 Remove the terminal block connector Hardware options installation 104...

Страница 105: ...l block connector 6 Attach the ground earthed wire to the ground screw and washer and tighten to 1 47 N m 13 lb in of torque The ground wire must be connected before the 48 V wire and the return wire...

Страница 106: ...of the terminal block connector and then tighten the screw to 1 3 N m 10 lb in of torque 8 Insert the return wire into the right side of the connector and then tighten the screw to 1 3 N m 10 lb in of...

Страница 107: ...the power supply handle a Unwrap the strain relief strap from the power supply handle CAUTION Avoid tight bend radii to prevent damaging the internal wires of a power cord or a system cable Never bend...

Страница 108: ...the risk of electric shock or energy hazards This equipment must be installed by trained service personnel as defined by the NEC and IEC 60950 1 Second Edition the standard for Safety of Information T...

Страница 109: ...tor and also the point of earthing of the DC system The DC system must be earthed elsewhere The DC supply source is to be located within the same premises as the equipment Switching or disconnecting d...

Страница 110: ...trap attached to the power supply handle a Unwrap the strain relief strap from the power supply handle CAUTION Avoid tight bend radii to prevent damaging the internal wires of a power cord or a server...

Страница 111: ...ver supports the 96W HPE Smart Storage Battery with the 145mm cable Installing the HPE Smart Storage Battery CAUTION In systems that use external data storage be sure that the system is the first unit...

Страница 112: ...en the cable management holder Open the cable management holder 8 Install the HPE Smart Storage Battery on the air baffle 9 Secure the HPE Smart Storage Battery cable under the air baffle clips and th...

Страница 113: ...ion Overview Use these instructions to install and enable an HPE TPM 2 0 Gen10 Kit in a supported system This option is not supported on a Gen9 and earlier system This procedure includes three section...

Страница 114: ...alled TPM Once installed the TPM becomes a permanent part of the system board When installing or replacing hardware Hewlett Packard Enterprise service providers cannot enable the TPM or the encryption...

Страница 115: ...OM version from the Hewlett Packard Enterprise Support Center website http www hpe com support hpesc To update the system ROM follow the instructions on the website 4 Power down the system a Shut down...

Страница 116: ...the TPM board To seat the board press the TPM board firmly into the connector To locate the TPM connector on the system board see the system label on the access panel 3 Install the TPM cover a Line up...

Страница 117: ...le configuration can be changed between TPM 1 2 and TPM 2 0 default but only TPM 1 2 operation is supported Enabling the Trusted Platform Module as TPM 2 0 Procedure 1 During the system startup sequen...

Страница 118: ...ies do one of the following If in graphical mode click Yes If in text mode press the Y key 7 Press the ESC key to exit System Utilities The system reboots a second time without user input During this...

Страница 119: ...or crimped Front drive cage cabling Front drive cage P1 and P2 cables connected to P1 and P2 on one of the following options installed on the system board HPE Smart Array E208i a SR Gen10 controller...

Страница 120: ...Unused front drive cage P2 cable folded and stored in the narrow slot of the cable guard Unused internal drive cage P2 cable folded and stored in the wider slot of the cable guard Cabling 120...

Страница 121: ...routed through either slot on the cable guard Internal drive cage cabling Internal drive cage P1 and P2 connected to P3 and P4 on an HPE Smart Array P816i a SR Gen10 controller installed on the syste...

Страница 122: ...Unused P3 cable not routed through either slot on the cable guard Internal drive cage P1 and P2 connected to P1 and P2 on a PCIe card in slot 1 Cabling 122...

Страница 123: ...Unused P3 cable not routed through either slot on the cable guard Internal drive cage P1 and P2 connected to P1 and P2 on a PCIe card in slot 5 Cabling 123...

Страница 124: ...Unused P3 cable not routed through either slot on the cable guard Internal drive cage P1 and P2 connected to P1 and P2 on a PCIe card located in slot 3 or 4 in riser Cabling 124...

Страница 125: ...Unused P3 cable not routed through either slot on the cable guard Internal drive cage P3 connected to rear LFF drive cage Cabling 125...

Страница 126: ...Internal drive cage P3 connected to the rear SFF drive cage Rear LFF drive cage cabling Rear LFF drive cage connected to system board Cabling 126...

Страница 127: ...Rear LFF drive cage connected to PCIe card in slot 1 or 2 Rear SFF drive cage cabling Rear SFF drive cage connected to the system board Cabling 127...

Страница 128: ...Rear SFF drive cage connected to PCIe card in riser slot 4 Rear six bay SFF drive cage cabling SAS SATA Rear six bay SFF drive cage connected to PCIe card in riser slot 2 Cabling 128...

Страница 129: ...nstalled in slot 2 slot 6 or slots 2 and 6 NVMe rear drive cage cabling to pass through board in slot 2 NVMe P1 to pass through P1 in slot 2 NVMe P2 to pass through P2 in slot 2 NVMe P3 to pass throug...

Страница 130: ...through P2 in slot 2 NVMe P3 to pass through P3 in slot 2 M 2 SSD Enablement option cabling The M 2 SSD Enablement option is supported in the following slots Expansion slot 1 on the system board Expan...

Страница 131: ...tion 1 M 2 SSD 1 SATA cable 2 M 2 SSD 2 SATA cable M 2 SSD cabling from the onboard PCIe x24 expansion slot 2 Item Description 1 M 2 SSD 1 SATA cable 2 M 2 SSD 2 SATA cable M 2 SSD cabling from the on...

Страница 132: ...P824i p MR Gen10 cabling HPE Smart Array P824i p MR Gen10 controller connected to pass through board installed on the system board IMPORTANT Hewlett Packard Enterprise supports only one HPE Smart Arra...

Страница 133: ...HPE Smart Storage Battery cabling iLO ports to network cabling Connecting multiple systems to the network using the iLO management ports The arrow indicates the connection to the network Cabling 133...

Страница 134: ...Fan assembly cabling Item Description 1 Fan assembly power cable 2 Fan assembly signal cable Cabling 134...

Страница 135: ...Front panel cabling Item Description 1 Front I O cable 2 Front USB 2 0 cable Cabling 135...

Страница 136: ...t Storage Administrator Online and Offline HPE MR Storage Administrator Offline StorCLI Offline Product QuickSpecs For more information about product features specifications options configurations and...

Страница 137: ...does not parse or change OS data from third party error event log activities for example content created or passed through the OS Active Health System Log The data collected by the Active Health Syst...

Страница 138: ...caps for a group of servers Group firmware update Update the firmware of a group of servers Group license installation Enter a license key to activate iLO licensed features on a group of servers Group...

Страница 139: ...l Interface Tool The RESTful Interface Tool iLOREST is a scripting tool that allows you to automate HPE server management tasks It provides a set of simplified commands that take advantage of the iLO...

Страница 140: ...ut of the box with a foundation of secure embedded management applications and firmware The management security provided by HPE embedded management products enables secure support of modern workloads...

Страница 141: ...use certain options including Secure Boot UEFI Optimized Boot Generic USB Boot IPv6 PXE Boot iSCSI Boot and Boot from URL Fibre Channel FCoE Scan Policy NOTE The boot mode you use must match the opera...

Страница 142: ...restore certificates For more information see the Hewlett Packard Enterprise website https www hpe com info redfish Using the secboot command in the Embedded UEFI Shell to display Secure Boot databas...

Страница 143: ...ching the host operating system For more information see HPE Smart Array SR Gen10 Configuration Guide at the Hewlett Packard Enterprise website HPE MR Storage Administrator HPE MR Storage Administrato...

Страница 144: ...ed and using HPE InfoSight for servers go to https www hpe com info infosight servers docs StorCLI The Storage Command Line Interface StorCLI tool is the command line management software designed for...

Страница 145: ...Update system maintenance tools that systematically update HPE ProLiant HPE BladeSystem HPE Synergy and HPE Apollo servers and infrastructure SPP can be used in an online mode on a server running Win...

Страница 146: ...dates and then reboots the servers iLO 5 with integrated Smart Update Gen10 or later servers only Performs iLO Repository based updates by downloading the components from iLO Repository when iLO Insta...

Страница 147: ...file 8 Flash the system ROM by entering fwupdate d BIOS f filename 9 Reboot the server A reboot is required after the firmware update in order for the updates to take effect and for hardware stabilit...

Страница 148: ...eed through Hybrid IT by simplifying and enriching the on premise experience informed by public cloud qualities and attributes Operational Support Services enable you to choose the right service level...

Страница 149: ...terpreting and resolving error messages Error Message Guide for HPE ProLiant Gen10 Plus servers and HPE Synergy provides a list of error messages and information to assist with interpreting and resolv...

Страница 150: ...the system 3 Remove all power a Disconnect each power cord from the power source b Disconnect each power cord from the system 4 Remove the system from the rack Remove the system from the rack 5 Place...

Страница 151: ...Properly dispose of the old battery For more information about battery replacement or proper disposal contact an authorized reseller or an authorized service provider System battery replacement 151...

Страница 152: ...itive component or assembly Use one or more of the following methods when handling or installing electrostatic sensitive parts Use a wrist strap connected by a ground cord to a grounded workstation or...

Страница 153: ...tem inlet temperature range is extended 5 C to 10 C 41 F to 50 F and 35 C to 40 C 95 F to 104 F at sea level with an altitude derating of 1 0 C per every 175 m 1 8 F per every 574 ft above 900 m 2 953...

Страница 154: ...F rear drive cage option SAS or SATA maximum 36 87 kg 81 28 lb Power supply specifications Depending on the installed options and or the regional location where the system was purchased the system is...

Страница 155: ...o all available features all power supplies in the same system must have the same output and efficiency ratings Hot plug power supply calculations For hot plug power supply specifications and calculat...

Страница 156: ...s www hpe com info EIL Single Point of Connectivity Knowledge SPOCK Storage compatibility matrix https www hpe com storage spock Storage white papers and analyst reports https www hpe com storage whit...

Страница 157: ...updates Some software products provide a mechanism for accessing software updates through the product interface Review your product documentation to identify the recommended software update method To...

Страница 158: ...PE Proactive Care service Supported products list https www hpe com services proactivecaresupportedproducts HPE Proactive Care advanced service Supported products list https www hpe com services proac...

Страница 159: ...com info ecodata For Hewlett Packard Enterprise environmental information including company programs product recycling and energy efficiency see https www hpe com info environment Documentation feedb...

Отзывы: