![Heta SCAN-LINE SOLID C Скачать руководство пользователя страница 11](http://html1.mh-extra.com/html/heta/scan-line-solid-c/scan-line-solid-c_operating-and-installation-instructions_2127633011.webp)
11
1
1
1
2
2
2
3
2
3
3
Stove Owner
Qualified
Technicia
Maintenance / Period
Before
Autum
Daily
2-3
days
30
days
60-90
days
1st Year 2st Year
Cleaning the chimney (see. Chimney)
C
Cleaning the chimney and stove
C
C
Cleaning the stoves firebox
C
VI
C
Cleaning combustion air intake
C
C
Cleaning of the firebox
C
VI
C
Checking / switch, gasket for door
C/S
VI
C/S
Checking / changing, gasket for glass
C/S
VI
C/S
Checking / changing gasket for flue pipe
C/S
VI
C/S
Checking / changing vermiculite
C/S
VI
C/S
Lubricate hinges
L
VI
L
Lubricate lock
L
VI
L
1.16 Diagram for the maintenance
C = Cleaning
C/S = Checking /Switch
L
= Lubricate
VI = Visual Inspection, pos. cleaning/replacing/adjusting
Содержание SCAN-LINE SOLID C
Страница 2: ...2...
Страница 21: ...21 3 3 min 4 1 2 9 Installation of the stove Solid C and Solid C high 2 3 x 4 7 5 2 x 1013 1006 6 8 5 3 3 5...
Страница 23: ...23 17 19 18 1 2 Scan line Solid C high 3 4 13 x M6 x 25 0008x1807 13 x M6 x 8 0008 0035 1 1 2 2 3 2 3...
Страница 24: ...24 5 7 6 1 2 10 Rear flue outlet Accessory 5032 0082 Solid C and 5032 0092 Solid high 2 192 270 308 57 HM...
Страница 26: ...4 5 6 26 5 x M4x8 4 Connecting external air supply from below 2 x4 1 3 x4...
Страница 27: ...7 8 27 x4 2 1 x3 x3 90o 3 x3 5 Connecting external air supply from behind...
Страница 28: ...28...
Страница 29: ...29...
Страница 30: ...30...
Страница 32: ...32...