17. WIRING CONNECTION:
From inside the hood, using UL listed wire nuts, attach the “neutral” wire(s) to the white lead(s),
the “hot” wire(s) to the black lead(s), and the ground wire(s) to the green lead(s) inside the
motor box(es).
DO NOT OPERATE HOOD WITHOUT PROPER GROUND
CONNECTION.
18. Install the blower motor(s) by plugging the wiring connectors in and securing the blower
motor(s) using the retaining screws that were removed in Step 7.
19. Replace the blower housing(s) and the blower shield(s). Make sure that the damper(s) open and
close smoothly.
20. Turn power ON, verify operation: See “USING THE VENTILATION SYSTEM” on page 5
for proper hood operation. Test all blower and light functions to ensure they are operating
properly.
BACK VENTING
When venting out through the wall, one or two elbows are required, depending on the blower
configuration:
DUCT COVERS AND BACK VENTING
Low profile elbows may interfere with the duct cover frame. Mount the duct cover to the hood,
and test fit the elbow(s) to confirm proper fit.
ELBOW FOR 600 CFM
Hoods with 600 CFM blower systems require one 8” elbow.
ELBOWS FOR 900 CFM
Units with 900 CFM blower systems require one 8” elbow and one 6” elbow.
ELBOWS FOR 1200 CFM
Hoods with 1200 CFM blower systems require two 8” elbows, one for each 600 CFM blower unit.
Standard 6” [15.2 cm] round - 8 1/2” [21.6 cm]
Standard 8” [20.3 cm] round - 10 3/4” [27.3 cm]
Elbow and Transition Heights
600 CFM blower module uses 8” round
300 CFM blower module uses 6” round
(Drawing Not To Scale)
Side View
8” Round
Height when
fully adjusted to
90 degrees:
H
12”
[30.5 cm]
6”
[15.2 cm]
16”
[40.6 cm]
8” Round
[20.3 cm]
8 ½”
[21.6 cm]
Low profile elbow: 8” to 6” x 8-1/2”
Hestan P/N AKVBE8
INSTALLATION
(CONT.)
©2019 Hestan Commercial Corporation
17
EN
Содержание KVP Series
Страница 1: ...INDOOR COOKING Vent Hood Pro Canopy KVP Installation Use and Care Manual ...
Страница 4: ......