
14
Installation procedures
Anchor bolt installation.
① Drill a hole (ⓓ: hole depth)
② Clean the inside of the hole
③ Put the anchor bolt into the hole
and hammer in until it reaches the
bottom of the hole
④ Tighten the bolt with a spanner.
(ⓐ35~45mm)- Torque : 80~100N.m
■Fixation horizon of the base
▶After adjust horizon of the product
precisely, fix up using anchor bolt.
After measure the horizontal status, lay
down the lie.
Adjustment the level of the base.
1
After adjust the level, fix up the base
platform using anchor.
Fixation of base (anchor)
2
■ Landing down the product at the place to be installed
▶Place the lift main body at the place to be installed referring to layout document.
▶Fixing the product after checking the caution notes.
In case of the
forklift use
In case of the
crane use
■Fixing the base with anchor bolt
▶Fix the 6pcs Anchor bolt of the
base plate and 2pcs Anchor bolt of
the control panel after supporting lift
using liner.
Installation
Installation
Содержание HL-32X
Страница 10: ...7 Caution Sticker layout Caution Warning Danger Introduction Introduction...
Страница 11: ...8 Heshbon Lift Capacity Heshbon logo Heshbon symbol Hand Foot Warning Introduction...
Страница 22: ...19 MEMO Installation Installation...
Страница 27: ...24 TROUBLE SHOOTING Maintenance Maintenance...
Страница 28: ...25 Check list and periodic maintenance Maintenance Maintenance...
Страница 30: ...27 Platform Link...
Страница 31: ...28 Base...
Страница 32: ...29 Cylinder...
Страница 33: ...30 Control Panel...
Страница 34: ...31 Hydraulic Circuit...
Страница 35: ...32 Electric Circuit...