HEROSE 15C01 Скачать руководство пользователя страница 11

Operating instructions 

herose.com 

 

Assembly 

5.1 

Installation position 

With regard to the installation position, pay attention to the flow direction arrow. Installation is only 
permitted in the flow direction. When installing the valve in a horizontal pipeline a vertical position of the 
spindle is recommended (hand lever at the top) or an inclination of up to 65° from the vertical. 

5.2 

Notes regarding the installation 

  Use suitable tools. 

  Allen keys of sizes 6, 8, 10, 14, 19; 

  Open-ended spanners; 

  Torque wrench; 

  TIG welding machine; 

  Oxy-fuel welding machine; 

  Clean tools before the installation. 

  Use suitable transport and lifting equipment for the installation. 

  Open the packaging only directly before the installation. Freedom from oil and grease for oxygen 

(O

2

)   

Valves for oxygen are permanently marked with “O

2

”. 

  Only install the valve if the maximum operating pressure and usage conditions of the plant 

correspond to the marking on the valve. 

  Remove protective caps or covers before assembly. 

  Inspect the valve for dirt and damage.    

DO NOT install a damaged or dirty valve. 

  Avoid damaging the connections.  

 

The sealing surfaces must remain clean and intact. 

  Seal the valve with suitable seals. 

 

No sealant (sealing tape, liquid sealing tape) may enter the valve.    
Respect the suitability for use with O

2

  Connect pipelines in a force-free and torque-free manner.   

Stress-free installation. 

  In order to ensure trouble-free operation, no impermissible static, thermal or dynamic stresses 

may be transmitted to the valve. Observe reaction forces. 

  Temperature-dependent changes in length in the pipework system must be compensated with 

expansion joints. 

  The valve is supported by the pipework system. 

  The valve must be protected against dirt and damage during construction work. 

  Remove the transport lock if fitted. 

  Check the leak-tightness. 

5.3 

Welding / soldering 

Welding / soldering of the valves and any heat treatment that may be required are the responsibility of the 
contracting construction company or operating company. 
 

  Before welding / soldering 

 

  Loosen the bolts 

Direction of rotation: counter 
clockwise 

  Remove the bolts 

 

  Remove the side parts  

Содержание 15C01

Страница 1: ...HEROSE GMBH ARMATUREN UND METALLE Operating instructions 3 piece ball valve...

Страница 2: ......

Страница 3: ...ermany Phone 49 4531 509 0 Fax 49 4531 509 120 E mail info herose com Web www herose com 1st issue 06 2019 The transmission or duplication of this document and the use or communication of its content...

Страница 4: ...I Phone 49 4531 509 0 Table of contents 1 About these instructions 1 2 Safety 1 3 Transport and storage 4 4 Description of the ball valve 4 5 Assembly 7 6 Operation 9 7 Maintenance and service 9 8 Dis...

Страница 5: ...operating instructions The ball valve is suitable for the media listed in these operating instructions see section 4 5 Media Operating conditions and applications deviating from these require the appr...

Страница 6: ...dia Safety gloves Eye protection Ear protection Wear the specified personal protective equipment for all work on the ball valve 2 5 Additional equipment and spare parts Additional equipment and spare...

Страница 7: ...NOTICE Impermissible stresses arising from operating conditions and extensions added structures Leakage or rupture of the valve body Provide suitable support Additional loads such as traffic wind or...

Страница 8: ...f condensation Adhere to a storage temperature range of 20 C to 65 C 4 Description of the ball valve Refer to the respective catalogue page for further detailed information 4 1 Structure Design Non au...

Страница 9: ...n or between flanges of the same pressure rating and identical flange connection The closing direction is clockwise 4 4 Operating data Valve Rated pressure Temperature Max operating pressure 15C01 PN...

Страница 10: ...his case a technical service life may be assumed in accordance with the underlying product standards e g EN1626 for shut off valves and EN ISO 4126 1 for safety valves The technical service life can b...

Страница 11: ...s or covers before assembly Inspect the valve for dirt and damage DO NOT install a damaged or dirty valve Avoid damaging the connections The sealing surfaces must remain clean and intact Seal the valv...

Страница 12: ...e side parts Do not damage the seal Mount the bolts Tighten the bolts to the specified tightening torque in a criss cross pattern Direction of rotation clockwise Assembly sequence for the bolts Nomina...

Страница 13: ...e operating conditions The recommendations for the functional checking of the valves are to be taken from section 7 2 1 Inspection and maintenance intervals in these operating instructions 7 2 1 Inspe...

Страница 14: ...antity dispatch and delivery address desired method of dispatch 7 5 Returns complaints Use the Service form in case of returns complaints Contact in case of service Herose com Service Product service...

Отзывы: