HermanMiller Prospect Media Space Скачать руководство пользователя страница 2

HermanMiller

Assembly Instructions

2

1BJZTY rev B

Step 3

Step 4

Step 6

Step 5

3.1 Align Bag Hook Brackets as square as possible to feet.  Attach Bag Hook 
Brackets with M8 x 20 Flathead Hex Socket Screw on each foot assembly.  

6.1 Position Connector Plates onto Peninsula surface.

6.2 Secure plates to surface with M5 x 12 flathead socket screws.

4.1 Arrange inverted Foot assemblies in proper positions. 

4.2  Assemble Toe Rails to mounting brackets and endcaps on foot assemblies 
with M8 x 20 Hex Socket Flathead Screws.  Tighten screws aft er all have been 
started

.  

Make sure all Toe Rails are pushed tight together, with no gaps, 

before tightening.

Bag Hook

Bag Hook

Toe Rail

Toe Rail

Toe Rail

Bag Hook

M8 x 20 Flathead 

Hex Socket Screw

M8 x 20 Flathead 

Hex Socket Screw

M8 x 20 Flathead 

Hex Socket Screw

M8 x 20 Flathead 

Hex Socket Screw

M8 x 20 Flathead 

Hex Socket Screw

M8 x 20 Flathead 

Hex Socket Screw

M8 x 20 Flathead 

Hex Socket Screw

M8 x 20 Flathead 

Hex Socket Screw

Inner Foot

RH End Foot

LH End Foot

Wire Trough

Connector Plate

M5 x 12 Flathead 

Socket Screw

5.1  Set Worksurface upside down on clean padded surface.

5.2  Position Wire Trough onto Peninsula Surface.

5.3  Secure Wire Trough to Peninsula Surface with Phillips Button Head Wood 
Screws.  Be cautious not to strip out holes.

No Gap

Содержание Prospect Media Space

Страница 1: ...ad Hex Socket Screws Hex Socket Button Head Screws Hex Socket Button Head Screws Glide Foot Assembly 2 1 Assemble Toe Rail Mounting Brackets to inner Foot Assemblies with M8 x 16 Flathead Hex Socket Screws 2 2 Attach Toe Rail Endcaps to outer Foot Assemblies with Hex Socket Button Head Screws Note Endcaps are Right and Left Handed Wire Trough Peninsula Surface Connector Plate Toe Rail Mounting Bra...

Страница 2: ...e been started Make sure all Toe Rails are pushed tight together with no gaps before tightening Bag Hook Bag Hook Toe Rail Toe Rail Toe Rail Bag Hook M8 x 20 Flathead Hex Socket Screw M8 x 20 Flathead Hex Socket Screw M8 x 20 Flathead Hex Socket Screw M8 x 20 Flathead Hex Socket Screw M8 x 20 Flathead Hex Socket Screw M8 x 20 Flathead Hex Socket Screw M8 x 20 Flathead Hex Socket Screw M8 x 20 Flat...

Страница 3: ...head screw 7 2 Position Foot onto column 7 3 Capture foot inside of column with Table Clamp 7 4 Secure clamp with M8 x 24 Flathead socket screw 7 5 Repeat process for other 3 feet 8 1 Attach Peninsula Leg Assembly to surface assembly with M5 x 25 hex socket head cap screws M8 x 24 Flathead Hex Socket Screws Hex Socket Button Head Screws Foot Table Clamp Peninsula Assembly Cove Leg Assembly Spider ...

Страница 4: ... of rails should always be at bottom There are right and left hand end rails Grooves must face inward toward toe rail Inside Rail Inside Rail RH End Rail LH End Rail Side Panel Step 12 12 1 Peel protective film from side panels Long sweeping pull helps remove faster Be sure to hold panel firmly pushing down into carpet while a partner pulls 12 2 Assemble Bottom Panel Clips to inside surface of eac...

Страница 5: ...nel clips are positioned into slots in bottom of rails May need to push in on panel from outside to keep clips fully engaged inside of grooves 14 1 Turn glides as needed to make wall assembly level 14 2 Turn glides on peninsula leg to make peninsula surface level Grooves Side Panel Glide Glide Glide Glide Glide Side Panel Side Panel Slot Rail Bottom Panel Clip Step 15 15 1 Insert flange on Cup int...

Страница 6: ...nents are marked with ASTM recycling codes Use these codes to identify material type for recycling Non marked components should be treated as mixed plastic Ferrous metals can be identified using a small magnet for recycling Non ferrous metals should be separated and recycled separately To disassemble product reverse the above installation steps ...

Отзывы: