HermanMiller Mora Скачать руководство пользователя страница 3

HermanMiller for Healthcare

Assembly Instructions

3

1BKN3K rev B

Step 5

Step 6

5.1 After wall mounted cases are installed, position Base Panel onto cases.
5.2  Mark screw hole locations onto cases.  Remove Base panel. Drill pilot 

holes.
5.3  Return Base Panel to cases.  Secure in place with 6 #8 x 1 1/4” pan head 

screws.

6.1  Position Side Panels onto base panel.  Make sure side panels are square 

with base panel. Mark Hole location on interlock bracket cleat.
6.2  Remove panels.  Drill 1/2” holes through drywall.  Make sure there are no 
utilities present. 
6.3  Insert Toggle Bolt into holes.  Orient  toggles vertically. Secure to wall.
6.4  Return Side panels to base panel.  Secure panels to base panel with two 
#10 x 5/8 pan head screws.
6.5  Secure side panel to wall with pan head machine screws provided with 
toggle bolt.

Toggle Bolt

Supplied with Toggle 

Side Panel

Mark Hole

#10 x 5/8 Pan Head Screw

Base Panel

#8 x 1 1/4 Pan Head Screw

3.4  Attach Teather to back of front panel with 5/8“ long pan head screw. 

#10 x 5/8 Pan Head Screw

Teather

4.1 Attach Zero Side Mounts to RH & LH Side Panels with four flat head screws 

per mount.
4.2 Attach Interlock Bracket Cleats to side panels using 5/8 “ long pan head 

screws.

#8 x 5/8 Flat Head Screw

#8 x 5/8 Flat Head Screw

#10 x 5/8 Pan Head Screw

Interlock Bracket Cleat

Zero Side Mount

Zero Side Mount

Step 4

Side Panel

Содержание Mora

Страница 1: ...der Laser Level Tripod Drill Bit Tape Measure Table Saw Jig Saw Pencil Safety Glass Note Please refer to Mora System planning guide for different wall constructions CH105 Toggle Bolts Additional Product Needed Sold Seperately Ceiling Storage Units CH300 Overhead Storage 1 1 Measure from top of storage unit to ceiling Step 1 Measure 1 2 Mark that dimension on face of Front Panel and Side Panels 1 3...

Страница 2: ...o Side Mount Step 2 2 1 Attach 2 Side Panel Support Brackets to Base Panel with three 5 8 long pan head screws per bracket 2 2 Attach Zero Side Mount to Base Panel with four flat head screws 2 3 For 36 to 48 wide cabinets in run Use pilot holes closest to front of Base Panel when mounting Side Panel Support Brackes Use left pilot holes for mounting Zero Side Mount Step 3 3 1 Install 5 Zero Side Mo...

Страница 3: ...to holes Orient toggles vertically Secure to wall 6 4 Return Side panels to base panel Secure panels to base panel with two 10 x 5 8 pan head screws 6 5 Secure side panel to wall with pan head machine screws provided with toggle bolt Toggle Bolt Supplied with Toggle Side Panel Mark Hole 10 x 5 8 Pan Head Screw Base Panel 8 x 1 1 4 Pan Head Screw 3 4 Attach Teather to back of front panel with 5 8 l...

Страница 4: ... Off 7 1 Remove protective backing from bumpers Place one on outside edge of end panel at each end Place one centered on outside edge of base panel 7 2 Insert 2 10 x 3 4 pan head screws into base panel 7 3 Leaving them up 25 from base panel Disassembly and Recycling Materials Identification and Segregation Where possible plastic components are marked with ASTM recycling codes Use these codes to id...

Отзывы: